Henan Mine Crane Group · News & Insights
450t Shipbuilding Gantry Crane Starts Hull-Section Handling
Original report:
Henan Mine Crane Group’s 450t shipbuilding gantry crane entered service for lifting, turning and positioning large hull and offshore engineering sections.
450t lifting, section turning and assembly positioning
Henan Mine Crane Group reported that a 450t large-span shipbuilding gantry crane had entered service in June 2025. The crane handles large sections for ships and offshore engineering products, combining lifting, transfer, airborne turning and assembly positioning.
Its trapezoidal main girder is supported by an I-shaped rigid leg and an A-shaped flexible leg. Operators and maintenance personnel can reach the cabin and upper girder by stairs or lift inside the rigid leg.
Multi-hook coordination and shipyard protection
Hoisting mechanisms include rope arrangement devices to help prevent ropes leaving their grooves. Travel mechanisms provide automatic or manual skew correction, while PLC and variable-frequency controls coordinate multiple hooks.
Safety monitoring, electronic travel collision protection, wind protection and fire alarms support operation. Henan Mine Crane Group also specifies millimetre-level positioning for coordinated lifting and assembly work.
Engineer the complete section-handling sequence
Include the complete mass, centre-of-gravity information, lifting points, rigging and the intended turning sequence. Henan Mine Crane Group can review the proposed hook arrangement against those load cases and the yard layout.
Define coordinated motion and skew management
Multiple hooks and a wide travel arrangement need a clear operating description. Ask how coordinated movements are selected, what the operator observes and which actions are required if the load or travel condition changes.
Discuss automatic and manual skew correction in relation to the rail arrangement and the customer's maintenance responsibilities. Positioning should be specified at the point relevant to section assembly, with the load condition and acceptance method agreed.
Key takeaway
Define hull-section turning procedures, hook load combinations and wind limits around your shipyard’s layout and production sequence.
Discuss your lifting project
Share the load, handling task, site layout and operating conditions for your project. Henan Mine Crane Group can discuss the equipment configuration, interfaces and scope needed for a technical quotation.
Request a project review Explore lifting equipment