Industry solutions · Henan Mine Crane Group
Crane solutions built around your process.
Move the loads that keep your business running. We help you match lifting equipment to your production flow, site constraints and operating duty—from steelmaking and manufacturing to energy projects and logistics.

Define the load, route and lifting sequence.
Check headroom, duty, environment and interfaces.
Agree the configuration and acceptance requirements.
Find your application
55 applications.
Find the task that matches yours.
Explore 55 detailed application reports across eight industry groups. Each page explains the specific equipment, operating task and procurement requirements.

Steel & Metallurgy
Handle ladles, billets, coils and furnace materials with equipment selected for heat exposure, production cycles and the way each load is secured.
Explore the solution
Warehousing & Logistics
Move plates, storage loads or containers between receiving, storage and dispatch, with the attachment, positioning and information flow selected for your site.
Explore the solution
Water Conservancy & Power
Plan installation and maintenance lifts for pumps and power equipment, with headroom, lifting points and civil interfaces checked before the crane arrangement is fixed.
Explore the solution
Aerospace
Handle large aerospace assemblies with a lifting arrangement built around approved lifting points, controlled orientation, work-area clearance and the customer's acceptance requirements.
Explore the solution
Industrial Manufacturing
Move fabrications, machinery and tools between production stations with lifting coverage, attachment control and access planned around your factory layout.
Explore the solution
Petroleum & Chemical Processing
Plan carbon-block handling, process transfers and maintenance lifts around material stability, dust, heat and the protection required in each operating area.
Explore the solution
New Energy & New Materials
Move energy equipment and sensitive process materials with lifting arrangements that address load geometry, contamination, positioning and the specified operating environment.
Explore the solution
Construction & Infrastructure
Handle bridge sections and structural assemblies with gantry or workshop lifting planned around component geometry, site supports, working space and construction stages.
Explore the solutionTurn a lifting problem into a specification
Choose around the job.
Then choose the crane.
Capacity is one part of the decision. The right arrangement also depends on what moves, where it travels and how often the operation repeats.
Handle the complete load
Include the material, container, lifting beam and attachment. Confirm dimensions, centre of gravity and the lifting points.
Keep the next stage supplied
Define the pick-up and delivery stations, lifting sequence, duty and required positioning before selecting speeds and controls.
Fit the working space
Check span, useful hook travel, building clearances, runway support and access for installation and maintenance.
Engineer for the environment
Identify heat, corrosion, dust, wind or classified areas, then agree the protection and documentation your project requires.
Start a useful project discussion
Send the process.
We’ll discuss the lifting plan.
Share your layout and operating requirements so the quotation can address equipment selection, controls and the site interfaces that affect installation.
- Load, attachment and lifting points
- Span, lifting height and available headroom
- Pick-up / delivery stations and load route
- Cycles, operating hours and positioning needs
- Environment, local standards and power supply
- Site drawings, installation scope and schedule












