Water Conservancy & Power · Applications
Water Conservancy & Power crane applications.
Installing a pump or generating unit begins with the complete lifting route: from the receiving point to the assembly position and future maintenance area. We can assess overhead or gantry arrangements around component weights, restricted headroom and the control needed to align large equipment during installation and service.

Find a comparable handling task
Explore the specific
equipment and process.
Each application explains its own equipment, working conditions and project stage, with practical inputs for planning a similar purchase.
7 detailed application reports

Automated Crane Handling for Power-Cable Warehouses
Two custom automated cranes move box-substation power-cable materials between warehouse and workshop operations. Load recognition, controlled pickup and dispatch records form one handling sequence.
Explore this application
600t Low-Headroom Bridge Crane for Pumped-Storage Construction
The 600t bridge crane forms part of a wider equipment package for an unnamed pumped-storage station. Its configuration combines low headroom and synchronized hooks, with factory preassembly supporting the project quality plan.
Explore this application
Crane Package for Offshore-Wind Final Assembly
Dozens of crane units support heavy-workpiece handling at an unnamed offshore-wind turbine final-assembly base. Coordinated hooks and high-lift hoisting are the specific configuration focus.
Explore this application
125t Bridge Cranes for Underground Pump-Station Lifting
Several bridge cranes, including 125t equipment, were manufactured for an unnamed national water-conservancy project. Coordinated lifting and controlled low-speed movement support underground pump-station unit installation.
Explore this application
500t Twin-Trolley Crane for Offshore-Wind Equipment
The 500t twin-trolley crane was reported installed and operating at an unnamed offshore-wind project. It is one featured configuration within 43 crane units supplied for phase one.
Explore this application
120t Bridge Cranes for Morowali Power-Plant Construction
Two 120t double-girder overhead cranes were manufactured for a thermal-power construction project in Indonesia. The application serves three 380MW generating units at Morowali’s Tsingshan Industrial Park.
Explore this application
Large-Span Cranes for Windey Turbine Production and Assembly
A batch of new-type large-span cranes serves Windey wind-turbine main-machine production and assembly. The reported installation approach combines modular design with plug-connected wiring.