Water conservancy / Underground pump station

125t Bridge Cranes for Underground Pump-Station Lifting

Henan Mine Crane Group manufactured several bridge cranes, including equipment rated at 125t, for lifting equipment in an underground pump station at an unnamed national water-conservancy project. The configuration combines coordinated lifting points with controlled low-speed hoisting and detailed operating diagnostics.

Bridge crane inside an underground pump-station cavern
Bridge crane inside an underground pump-station cavern.
Application
Underground pump-station unit lifting
Equipment
Several bridge cranes, including equipment rated at 125t
Project
Unnamed national key water-conservancy project
Electrical control
PLC and VFD communication control
Hoisting
Four-quadrant operation and synchronized lifting points
Diagnostics
Coordinates, operating/protection/fault signals, alarms and records

Underground pump-station units define the lift

The cranes serve underground pump-station unit lifting at a national water-conservancy project. The 125t rating identifies equipment within a wider supply of bridge-crane types. For a comparable installation, match each crane to the unit it handles, the available station space and the required lifting route.

For a comparable purchase, identify the complete pump-station unit and its lifting arrangement. Include attached equipment and rigging in the gross load. Underground access, runway geometry and the route to the installation position need to be considered together so the required hook positions are achievable.

Coordinated motion and load balance

PLC and variable-frequency drives communicate across the crane control system. Multiple lifting points are synchronized with automatic balancing. This supports an underground pump-station unit in a controlled orientation while it is raised or moved toward its installation position.

Define the number and spacing of lifting points, the expected load distribution and the permitted difference in movement. Set acceptance criteria from the component and installation procedure. Include any changes in support conditions during pickup, travel and final approach.

Four-quadrant hoisting for controlled low-speed work

The hoisting mechanism operates in four quadrants, with speed regulation, high starting torque and substantial torque at low speed. Those characteristics are relevant when heavy station equipment must approach a seat or alignment position under control.

Request the proposed speed range and explain each critical stage of the lift. Include pickup from supports, raising through restricted sections, final approach and lowering. Agree the operating parameters and the conditions under which they will be demonstrated with the actual lifting arrangement.

Diagnostics that support acceptance and operation

The integrated detection system displays three-dimensional coordinates, operating signals, protection signals and fault information. Diagnostic, alarm, recording, printing and communication functions are reported. These functions can help operators and maintenance personnel understand what condition interrupted a movement.

Specify the display language, event information and records required at handover, and identify any plant system that must receive signals. Agree factory checks and installed functional tests around the pump-station lift. The project also received CCTV news coverage; the purchasing focus remains the equipment functions and their acceptance.

Application reference: Henan Mine Crane Group official application report. Equipment and operating advice for a new project should be specified against your load, process and site.

Start the equipment discussion

Relevant equipment families.

Compare the equipment family with your operating duty. Final attachments, controls and protection follow the application requirements.

Double-girder overhead cranes

Assess station runway geometry and the required coordinated lifting arrangement.

View equipment options ↗

Winch-trolley overhead cranes

Evaluate winch-trolley hoisting around the gross load, low-speed duty and multi-point control requirements.

View equipment options ↗

Plan a similar application

Build the specification
around your operation.

Provide the underground station sections and unit-lifting procedure for a coordinated assessment of load, access and controls.

  1. Pump-station unit drawings, total lifted mass and rigging details
  2. Lifting-point locations, load distribution and permitted unit tilt
  3. Underground layout, runway level, access openings and hook elevations
  4. Pickup, travel, installation and future removal procedures
  5. Required low-speed control, synchronization and acceptance tolerances
  6. Diagnostic displays, printed records, plant communications and test scope

Before you specify

Questions for
your project.

What information is needed for an underground station lift?

Provide the unit drawing, lifting points, station sections and the route through access openings. Include the attachment, rigging and final installation position.

How can diagnostics support the lifting operation?

Coordinates and operating, protection and fault signals help operators understand equipment status. Specify the alarms, event records and plant communications your operating team needs.

How should multi-point movement be accepted?

Agree the load distribution, allowed movement difference and representative lift sequence. Use the actual component interface or an agreed test arrangement to demonstrate the requirement.