Power equipment / Warehouse automation

Automated Crane Handling for Power-Cable Warehouses

Henan Mine Crane Group manufactured two automated cranes for an unnamed national power-sector project, serving the handling of power cables used in box-type substations. The reported configuration connects physical material movement with warehouse and workshop information, rather than treating lifting as an isolated operation.

Overhead crane above power-cable material reels
Overhead crane above power-cable material reels.
Supply scope
Two custom automated cranes
Application
Power-cable materials for box-type substations
Motion control
VFD and PLC, hoist encoder and Gray-bus travel positioning
Recognition
3D scanning and visual detection
System interface
Central server, WCS scheduling and WMS warehouse management
Reported stage
Custom manufacture and configuration described; commissioning date not stated

A cable-material route connecting storage and production

The application connects power warehouse and workshop operations. Cable materials are identified, collected, carried along the intended route and placed at the next station while their movement remains traceable. For box-substation cable production, the handling specification should start with the actual material form, package dimensions and production/inventory plan.

For procurement, identify which movements belong to the crane and which remain with receiving vehicles, racks or production machines. The interface should describe where each transfer starts and ends, how a station signals readiness and who releases the material for the next step.

Position information at the hoist and both travel axes

The electrical system combines variable-frequency drives with PLC control. An encoder is fitted to the hoisting mechanism, while the bridge and trolley use Gray-bus positioning. These position references support coordinated movement and repeatable station transfers. Define the required final load position and acceptance conditions for each station.

Three-dimensional scanning and vision are also reported. Their functions include material recognition, locating the load, automatic gripping and obstacle avoidance during travel. Anti-sway is included in the documented configuration. A new specification should define the actual load appearance, allowed pickup variation and obstructions, so acceptance can be demonstrated under representative conditions.

Automatic pickup linked to warehouse dispatch

The intelligent lifting attachment incorporates detection switches. Automatic operation covers the handling sequence without routine manual intervention, combining attachment feedback with movement control. For a new installation, define the normal cycle alongside access control, maintenance isolation and the authorised exception-recovery procedure.

A dedicated server in the central control room supports a warehouse control system, or WCS, and a warehouse management system, or WMS. Material movements are recorded, with information tracing and query functions. Buyers should specify the material identifier, order status and completion confirmation exchanged with their existing systems, including how records are reconciled if communication is interrupted.

Define the automated cycle before choosing the crane

Start the enquiry with a route and a sequence diagram. State the pickup and set-down geometry, the load including its lifting interface, the operating shifts and the expected material variations. The two-crane supply is a specific project configuration, so another warehouse may require a different equipment count and control arrangement.

Arrange acceptance around complete tasks: recognise the right material, confirm attachment engagement, move along the permitted route, arrive at the assigned station and return a meaningful completion record. Include a controlled recovery process for failed recognition or pickup. Agree these operating conditions with the warehouse and production teams before finalising the equipment specification.

Application reference: Henan Mine Crane Group official application report. Equipment and operating advice for a new project should be specified against your load, process and site.

Start the equipment discussion

Relevant equipment families.

Compare the equipment family with your operating duty. Final attachments, controls and protection follow the application requirements.

Double-girder overhead cranes

Evaluate a bridge arrangement around the cable-material route, duty and automation interfaces.

View equipment options ↗

Electric wire-rope hoists

Compare hoisting arrangements only after load, attachment feedback and automatic positioning requirements are defined.

View equipment options ↗

Plan a similar application

Build the specification
around your operation.

Send your cable-material route and information-system requirements so the mechanical handling and warehouse controls can be assessed together.

  1. Cable material forms, dimensions, gross weights and lifting interfaces
  2. Warehouse and workshop layouts with every pickup and set-down station
  3. Material identifiers, recognition conditions and permitted pickup variation
  4. Cycles per shift, simultaneous requests and required dispatch priorities
  5. Existing WMS/WCS interfaces, message definitions and data-retention needs
  6. Access controls, exception recovery and complete-cycle acceptance criteria

Before you specify

Questions for
your project.

What load information is needed for cable-material handling?

Provide the heaviest complete package, its dimensions and lifting interface, plus the attachment mass. Include material variations so the pickup method and crane duty can be assessed.

How does the crane connect to warehouse dispatch?

The configuration combines recognition, automatic attachment functions and position control with WCS/WMS movement records. Define the dispatch, readiness and completion messages required by your existing software.

How should difficult pickup conditions be addressed?

Provide representative packages and explain variations in position, appearance or support. Agree detection, failed-pickup handling and an authorised recovery sequence for the proposed system.

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…