Indonesia / Power construction
120t Bridge Cranes for Morowali Power-Plant Construction
Henan Mine Crane Group manufactured two 120t new-type double-girder overhead cranes for a thermal-power project at Tsingshan Industrial Park, Morowali, on Indonesia’s Sulawesi island. Their stated role is supporting construction lifting for three 380MW supercritical coal-fired generating units.

- Equipment
- Two 120t new-type double-girder overhead cranes
- Location
- Tsingshan Industrial Park, Morowali, central Sulawesi, Indonesia
- Plant scope
- Three 380MW generating units
- Generating process
- Supercritical, single-reheat, condensing coal-fired units
- Lifting duty
- Power-plant construction and equipment installation
- Reported stage
- Project manufacture and export delivery described; commissioning unstated
Construction lifting inside an industrial power project
The plant is intended to address electricity demand at Morowali Industrial Park. Its location and generating-unit scope define the project context, while the cranes provide the lifting equipment used during construction. The electrical output of 380MW per generating unit is separate from the 120t rating of each featured crane.
Smooth operation and controlled positioning support equipment installation within the generating-unit works. For a comparable project, identify each major equipment lift, its gross mass and the route from arrival to the final installation position. Include temporary supports and any changes in access as construction advances.
Two bridge cranes with project-specific interfaces
Both cranes use new-type double-girder overhead arrangements rated at 120t. Coordinate the span, hook range, headroom and any auxiliary lifting requirement with the building, runway and equipment installation plan. Check those interfaces before finalising the crane specification.
Include the maximum component envelope as well as its mass. A lift may meet the rated capacity yet still be constrained by hook approach, overhead clearance or access between structures. State any temporary supports or installation stages that change the usable travel route.
An export supply requires defined delivery boundaries
The Indonesian order forms part of Henan Mine Crane Group’s export supply work, which includes batch dispatches and delivery coordination. For a new contract, define factory completion, export packing, delivery, installation and final acceptance as separate milestones with clear responsibilities.
Earlier export cooperation included Pakistan waste-heat power generation, mining in Congo, a Bangladesh power plant and Serbian copper operations. These are separate application references. For the Morowali-style purchase, focus on the power-plant load schedule and the logistics and installation resources available at the actual site.
Build a procurement schedule around the generating-unit works
For a comparable thermal-power project, align crane availability with the equipment arrival and installation programme. Identify any subsequent maintenance duty so it can be considered from the start, while keeping it separate from the construction use actually documented here.
Request a technical schedule covering loads, working range, duty and control functions, plus installation and acceptance responsibilities. Where positioning or automatic functions are important, define the task and required demonstration in the enquiry. This gives the supplier a concrete basis for proposing the appropriate controls.
Application photographs
See the equipment and working context.
Photographs and accompanying illustrations from this application report. Open an image for a larger view.
Application reference: Henan Mine Crane Group official application report. Equipment and operating advice for a new project should be specified against your load, process and site.
Start the equipment discussion
Relevant equipment families.
Compare the equipment family with your operating duty. Final attachments, controls and protection follow the application requirements.
Double-girder overhead cranes
Assess a double-girder bridge arrangement against the plant building and construction route.
View equipment options ↗Winch-trolley overhead cranes
Evaluate hoisting and trolley arrangements around each equipment lift and the required installation duty.
View equipment options ↗Plan a similar application
Build the specification
around your operation.
Provide the generating-unit equipment list and installation sequence for a construction-lifting proposal.
- Major component list with gross masses, dimensions and lifting points
- Plant building sections, runway geometry, hook travel and approach limits
- Arrival, temporary storage and final equipment installation positions
- Construction sequence, required crane availability and future lifting duties
- Site power supply, operating controls and required positioning criteria
- Export delivery terms, installation responsibilities and acceptance documentation
Before you specify
Questions for
your project.
What plant information is needed with the load schedule?
Provide building and runway sections, equipment arrival points and final installation positions. Include construction stages that restrict access or alter the usable route.
How should controlled positioning be specified?
Define the receiving position, required approach movement and permitted load motion. Agree the speed range and demonstration conditions for the proposed crane.
What belongs in an export crane supply scope?
Set out packing, shipment, delivery, installation support, site resources and acceptance responsibilities. Link each milestone to the equipment installation programme.