Henan Mine Crane Group · News & Insights

500-Tonne Overhead Crane Handles Nuclear-Sector Components

Original report:

Henan Mine Crane Group's 500-tonne overhead crane entered service for large nuclear-sector components, combining coordinated hooks, PLC control and anti-sway functions.

Red heavy-duty overhead crane viewed from below inside a workshop
Red heavy-duty overhead crane viewed from below inside a workshop.

Heavy component handling at Guoshi Heavy Industry

Henan Mine Crane Group's February 2025 update describes a 500-tonne overhead crane in service for large components associated with the nuclear power sector. The related manufacturer, Guoshi Heavy Industry, operates in Qiqihar's Fularji Economic Development Zone.

The high-strength steel structure was developed using finite element analysis. Variable-frequency drives, PLC control and IoT data transmission support human-machine interfaces and coordinated main, secondary and auxiliary hooks.

Anti-sway algorithms monitor load movement and adjust hook travel, alongside multiple protective devices. Established in August 2010, Guoshi Heavy Industry provides manufacturing services for China First Heavy Industries projects in nuclear power, hydrogenation, energy and offshore wind.

Begin with the complete heavy-component lift

Energy-sector component handling requires a clear description of the load and the lifting arrangement. Provide the component mass, dimensions, centre of gravity and attachments, together with the path through the workshop.

Identify any rotation or positioning operation that involves more than one hook.

Agree how the hooks will work together

Main, secondary and auxiliary hooks can support different stages of a handling task, so the customer should describe their intended roles. Ask the technical team to explain the offered operating modes, the information presented through the interface and the conditions governing coordinated movement.

The lifting plan and attachment arrangement need to be reviewed alongside those controls.

Connect structural analysis with order documentation

The installed crane combines a high-strength steel structure with engineering work using finite element analysis. Buyers can ask how the proposed load cases and duty requirements are reflected in the engineering review for their equipment.

Identify the project standards and the technical documents required by the customer's approval process.

Key takeaway

Specify hook coordination, component lifting points, handling sequences and acceptance conditions for large manufacturing loads.

Discuss your lifting project

Share the load, handling task, site layout and operating conditions for your project. Henan Mine Crane Group can discuss the equipment configuration, interfaces and scope needed for a technical quotation.

Request a project review Explore lifting equipment

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…