Henan Mine Crane Group · News & Insights
Crane Forum Focuses on Automated Attachments and Warehouse Systems
Original report:
More than 700 people joined Henan Mine Crane Group’s fifth crane forum on 25 January 2025 to discuss automated attachments, stacker cranes, standards and new markets.
Technical and sales teams discuss new applications
Henan Mine Crane Group’s fifth crane-development summit forum brought more than 700 specialists, leaders, technical staff, managers and sales representatives to the intelligent industrial park on 25 January 2025. Dr Xu Lei spoke on automatic lifting attachments for intelligent cranes.
Li Xin of Beijing Materials Handling Research Institute presented aisle stacker cranes for automated high-bay storage. Wang Jisheng, Lu Nianli, Cheng Wenming, Lan Peng, Lei Qingqiu and Zhao Dingyuan joined discussions covering market development, product research, digitalisation, crane standards and electric hoists.
The lifting attachment defines the real handling task
For buyers considering intelligent cranes, the attachment is often the point where the machine meets the production process. Provide dimensions, weight variation, lifting-point information and the orientation required at the destination so engineers can review the full movement.
Describe storage needs before choosing a warehouse machine
Begin with the stored unit: dimensions, maximum load, handling base and any variability across products. Share the aisle layout, storage heights and expected flow between receiving, storage and dispatch.
Explain which operations must occur at the same time.
Give automation a clear information flow
Identify where each movement request originates, how the load is identified and which system confirms that the destination is available. Discuss responsibility for communication with warehouse or production software.
Establish what operators will see when the normal sequence cannot continue and how they should recover the operation. These interfaces should be recorded before the control arrangement is approved.
Plan verification around representative operations
Select representative loads, pickup positions and destinations with the engineering team. Include the information exchange and operator response needed for exceptions.
Define the customer's site preparations, test materials and attendance requirements. Identify the business priorities, such as organising storage movements or reducing manual attachment tasks, without assuming one configuration suits every site.
Ask for a proposal that connects the equipment, attachments, controls and customer interfaces in a complete operating sequence. Bring maintenance representatives into the review of the proposed attachment and storage equipment.
Discuss access, inspection points, component replacement and the information needed to order spares. State the project requirements, operating duty, site power and approval expectations in the enquiry.
Ask the supplier to explain the proposed lifting mechanism and its relationship with the duty cycle. For equipment working near an existing installation, share any preferred operating conventions or component requirements so compatibility can be reviewed early.
Key takeaway
Consider lifting attachments, storage equipment, standards and operating requirements together when developing warehouse automation.
Discuss your lifting project
Share the load, handling task, site layout and operating conditions for your project. Henan Mine Crane Group can discuss the equipment configuration, interfaces and scope needed for a technical quotation.
Request a project review Explore lifting equipment











