Henan Mine Crane Group · News & Insights
Henan Mine Crane Group Starts 21,000-Square-Metre Office Building Project
Original report:
Henan Mine Crane Group broke ground on December 22, 2023 for a 21,000-square-metre administrative and business reception building beside the crane museum.
Construction start at the intelligent manufacturing park
Henan Mine Crane Group founder Cui Peijun announced the start of construction on December 22, 2023. Vice president Ren Haitao and contractor representative Li Wei addressed the ceremony, chaired by general manager Feng Shuangyang.
Planned offices and business reception facilities
The design provides 13 above-ground floors and one basement parking level beside the crane machinery museum. Total floor area is 21,000 square metres, including an 18,884-square-metre main building and a 2,116-square-metre annex.
Intended functions include administration and business reception.
Key takeaway
The construction project was planned to add administrative and visitor reception space to the intelligent manufacturing park.
Discuss your lifting project
Share the load, handling task, site layout and operating conditions for your project. Henan Mine Crane Group can discuss the equipment configuration, interfaces and scope needed for a technical quotation.
Request a project review Explore lifting equipment











