Henan Mine Crane Group · News & Insights
Automatic Grab Crane Starts Waste-to-Energy Plant Duty
Original report:
Henan Mine Crane Group commissioned a grab crane for waste-to-energy handling, combining fixed-point grabbing, weight-based cycles and variable-frequency control.
Fixed-point grabbing and weight-based operating cycles
Henan Mine Crane Group reported commissioning an automatic grab crane for a waste incineration power project in December 2025. Its control functions combine fixed-point grabbing and weight-based cyclic work to organise repeated material movements.
Variable-frequency drives and absolute encoders support positioning, with the company describing millimetre-level control. Anti-sway control is integrated with the operating sequence to help manage suspended grab movement.
Control choices and protection for bulk handling
Operators can select manual operation, wireless remote control or fixed-point unloading. The crane also reserves an interface for further automation as the plant’s process develops.
PLC and variable-frequency control coordinate starting, stopping and speed adjustment. Nine protection functions include short-circuit protection, overload protection and lifting limits.
Define the waste-handling cycle and the load
Waste-to-energy handling depends on the material as well as the crane. Include the complete suspended mass and the cycle the equipment is expected to repeat.
Fixed-point grabbing and weight-based cycles can then be discussed in relation to the plant's material flow rather than as isolated automation features. Henan Mine Crane Group can review the proposed control sequence with the customer and identify the information needed at each step.
Where the plant uses different operating conditions during normal production and maintenance, describe both.
Agree the transition between operating modes
Buyers should ask how a mode is selected, who has authority to control the crane and how a partly completed cycle is handled when the mode changes. Review visibility around the pickup and unloading areas, together with the need for operator information and access restrictions.
Key takeaway
Set out waste characteristics, feed locations, weight targets and required operating modes when specifying a grab crane.
Discuss your lifting project
Share the load, handling task, site layout and operating conditions for your project. Henan Mine Crane Group can discuss the equipment configuration, interfaces and scope needed for a technical quotation.
Request a project review Explore lifting equipment











