Henan Mine Crane Group · News & Insights

Automated Metallurgical Cranes Enter Ulanqab Ferrochrome Service

Original report:

Henan Mine Crane Group supplied automated cranes to a ferrochrome project in Ulanqab, integrating remote central control, hopper feeding, anti-sway and monitoring.

Red overhead crane lifting equipment inside a tall industrial hall
Red overhead crane lifting equipment inside a tall industrial hall.

Automatic handling for ferrochrome production

Henan Mine Crane Group developed several automated metallurgical cranes for a ferrochrome project in Ulanqab, Inner Mongolia. The January 2025 announcement confirmed that the equipment had entered service.

Remote central controls manage hooking, unhooking and feeding operations. The system locates hoppers and transfers raw materials, supported by anti-sway functions and positioning algorithms.

Protective systems monitor operating status and provide information for lifecycle management.

Describe the metallurgical feeding cycle

Buyers considering automated feeding should map the movements from raw-material pickup to the receiving process. Identify the hopper arrangement, material condition and operating sequence, together with the load range and working environment.

Explain which tasks need to run automatically and how the plant coordinates them with other equipment.

Review the attachment and hopper interfaces

Automatic hooking requires a defined relationship between the crane and the item it engages. Provide drawings or photographs of the hoppers and explain how they are presented for pickup.

Discuss the conditions that confirm engagement and the sequence used before movement begins. The customer's maintenance and operating teams should join the review where attachment access or equipment condition affects the process.

Give central control a clear operating boundary

Remote central operation needs a shared description of task initiation, status information and operator intervention. Identify who requests a feeding movement, which plant signals are involved and what happens when a receiving position is unavailable.

Ask the supplier to explain the proposed controls and the information available to operators. Recovery from an interrupted sequence should also be discussed within the agreed application.

Set acceptance around representative material movements

Agree the load conditions, destinations and sequence to be demonstrated, together with the method for recording the result. Monitoring information should also be explained in terms the maintenance team can use, with the expected documents identified before handover.

The plant’s operating team should identify the material-handling situations that require particular attention during commissioning. Discuss them with the crane supplier and the personnel responsible for the connected process.

Key takeaway

Map hopper positions, load and material properties, operating cycles and remote-control responsibilities before defining the automation scope.

Discuss your lifting project

Share the load, handling task, site layout and operating conditions for your project. Henan Mine Crane Group can discuss the equipment configuration, interfaces and scope needed for a technical quotation.

Request a project review Explore lifting equipment

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…