Henan Mine Crane Group · News & Insights

Changyuan Expo Brings RMB 2.67 Billion in Procurement Agreements

Original report:

Henan Mine Crane Group announced RMB 2.67 billion in procurement agreements at the April 2025 Changyuan expo, alongside automated gantry-crane demonstrations and tours.

Visitors beside a yellow crane demonstration at an exhibition
Visitors beside a yellow crane demonstration at an exhibition.

Automated gantry technology on display

Henan Mine Crane Group presented a fully automated gantry crane at the 10th China Changyuan International Lifting Equipment Expo, held from 16 to 18 April 2025. The display featured positioning, vision analysis and integrated digital controls.

Announced procurement agreements totalled RMB 2.67 billion. Partners included SEW Transmission Equipment (Wuhan), Nanjing High Accurate Drive Equipment Manufacturing Group, Jiangsu Guomao Reducer, Suzhou Inovance Technology, Tiantie Hot-Rolled Plate, Anyang Iron and Steel and Hebei Yongyang Special Steel.

Around 200 industry visitors toured the intelligent industrial park and China Crane Machinery Museum, adding factory discussions to the exhibition programme.

Evaluate automation as a complete material-handling task

The automated gantry display gives crane buyers an opportunity to discuss how positioning, vision and digital control work together in a real process. Explain how incoming material is identified and how the equipment should respond when a load or storage position differs from the expected condition.

Connect component sourcing with the offered configuration

The expo procurement agreements cover different parts of the crane supply chain, including drives, controls and steel. For a purchase, request the component schedule attached to the actual proposal and clarify which brands or specifications are included.

Discuss proposed alternatives and approval procedures so engineering and purchasing teams understand how component choices will be controlled.

Agree interfaces before the control system is finalised

Identify who supplies the load data, who confirms a destination is ready and which system authorises movement. Discuss communication protocols, network responsibilities and the visibility needed by operators.

Define how exceptions are displayed and resolved.

Give acceptance measurable operating scenarios

For a proposed automated gantry crane, acceptance should address the handling tasks that matter at the site. Agree representative loads, positions and sequences, together with the required observations or measurements.

Include abnormal situations that operators may encounter and the procedure for returning equipment to service. Assign responsibilities for preparing the test area and providing loads.

Arrange time to review the workshop areas and inspection resources relevant to your order, and meet the people coordinating controls and mechanical equipment. Ask how drawing changes are managed across component suppliers and assembly teams.

Customers approaching Henan Mine Crane Group should provide capacity, span, lifting height, site drawings and the intended automation sequence. Include existing drive or control standards, the project country and the personnel available to maintain the system.

Confirm responsibilities for reference points, communication infrastructure, load identification and coordination with adjacent equipment. Identify the data and drawings that the customer must provide before design approval.

Key takeaway

Coordinate structures, materials, drives and controls across the equipment supply chain when developing a crane system.

Discuss your lifting project

Share the load, handling task, site layout and operating conditions for your project. Henan Mine Crane Group can discuss the equipment configuration, interfaces and scope needed for a technical quotation.

Request a project review Explore lifting equipment

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…