Henan Mine Crane Group · News & Insights

Rescue Training Crane Coordinates Helicopter Cabin Simulation

Original report:

Henan Mine Crane Group's emergency rescue crane links path planning, positioning and coordinated cabin movements for simulated helicopter rescue training conditions.

White and blue overhead crane marked 20 tonnes inside a bright production hall
White and blue overhead crane marked 20 tonnes inside a bright production hall.

Specialised crane for emergency rescue training

Henan Mine Crane Group developed the crane for a national emergency rescue training application. The company's report dated 2 May 2024 said the equipment had featured during vice premier Zhang Guoqing's recent visit to regional emergency response facilities in Hubei and in Hubei television coverage.

Automatic route planning, position detection and obstacle avoidance support operation within the training facility. The simulated cabin and test controls coordinate bridge travel, trolley movement and rotation to change the helicopter cockpit's attitude under simulated storm, overturning and accelerated pitching conditions.

Define the boundary between crane and training controls

Identify which party supplies each control element and how commands and status information pass between them. Explain the operating sequence and the conditions required before a movement starts.

The training-system team should join the review while these interfaces are being developed.

Review route planning within the actual facility

Automatic paths, position detection and obstacle avoidance need a clear view of the working area. Provide the facility layout and identify nearby structures, equipment and any changing conditions relevant to operation.

Ask how the proposed arrangement evaluates the intended movements and what information operators receive. The customer should also explain the representative training sequences it wants to review.

Key takeaway

Develop the required motion envelope, cabin interfaces and protective functions jointly with the simulation facility designer.

Discuss your lifting project

Share the load, handling task, site layout and operating conditions for your project. Henan Mine Crane Group can discuss the equipment configuration, interfaces and scope needed for a technical quotation.

Request a project review Explore lifting equipment

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…