Original report:

Henan Mine Crane Group's 160-tonne Meishan foundry crane passed February–March 2022 inspection covering material records, dimensional checks and energised no-load trials.

Visitors standing beside a large yellow crane assembly
Visitors standing beside a large yellow crane assembly.

160-tonne Meishan foundry crane passes the February–March review

Henan Mine Crane Group’s 160-tonne metallurgical foundry overhead crane passed project A-inspection between 28 February and 4 March 2022. The team included Shanghai Meishan Iron and Steel, China 20th Metallurgical Group, Ouye Industrial Products, Shanghai Baosteel Engineering Consulting and Dalian Baoxin Lifting Technology.

Inspectors reviewed self-inspection records and material reports, measured trolley and bridge structures and checked assembly. Energised no-load operation was completed, with the equipment meeting the contract technical agreement and A inspection outline.

Henan Mine Crane Group's major projects office coordinated process, technical, quality assurance, production and workshop staff to support the inspection and provide the required manufacturing information.

Key takeaway

Set the inspection outline, material documentation, dimensional checks and operating tests before manufacturing begins.

Discuss your lifting project

Share the load, handling task, site layout and operating conditions for your project. Henan Mine Crane Group can discuss the equipment configuration, interfaces and scope needed for a technical quotation.

Request a project review Explore lifting equipment

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…