Henan Mine Crane Group · News & Insights
Projects, people and progress.
Explore crane deliveries, manufacturing developments, technical cooperation and the people behind our equipment.
61 articles

Henan Mine Crane Group Supports Xinjiang CHP Project with Controlled Lifting
Henan Mine Crane Group supplied cranes for Jimsar’s 2 × 350 MW cogeneration project, with variable-frequency controls and protection tailored to heat and dust.
Read story →
Custom Cranes Integrate Carbon Handling and Aluminium Processes
Henan Mine Crane Group developed suction, anode stacking and pot-tending cranes for a Baotou aluminium producer, with adjustable clamps and automated handling.
Read story →
400-Tonne Intelligent Overhead Crane Ships to Jiangguo
Henan Mine Crane Group dispatched a 400-tonne intelligent double-girder crane for Jiangguo on December 15, 2025 as part of a coordinated heavy-lifting equipment package.
Read story →
Automated Rizhao Steel Plate Line Extends Henan Mine Crane Group Handling Scope
Henan Mine Crane Group supplied Shandong Steel Rizhao with automated plate handling, laser splitting, marking and finished-plate storage for shipbuilding and offshore steel.
Read story →
Baosteel Project Crane Batches Pass Expert Inspection
Crane batches from Henan Mine Crane Group passed expert A inspection for a Baosteel project in late 2025, meeting the project’s inspection-outline requirements.
Read story →
Hainan Commercial Launch Site Cranes Approved for Dispatch
Henan Mine Crane Group’s first crane batch for the Hainan commercial space launch site passed factory release review for lifting and transferring aerospace equipment.
Read story →
Baosteel Zhanjiang Gantry Crane A-Inspection Combines Controls and Documentation
Henan Mine Crane Group’s gantry crane for Baosteel Zhanjiang passed A-inspection after manufacture finished two months early, with PLC controls and condition monitoring.
Read story →
42t Automated Container Cranes Begin Trial Operation in Russia
Henan Mine Crane Group’s Russian order included seven 42t container gantry cranes; four entered trial operation with A8 duty and a design temperature of -40°C.
Read story →
108 Henan Mine Crane Group Units Prepare Yancheng Port Warehouse for Phased Upgrades
Henan Mine Crane Group supplied 108 crane units and sets for a Yancheng Port warehouse, reserving interfaces for later remote monitoring, fault alerts and scheduling.
Read story →
280-Tonne Foundry Crane Completes 14 Years at Steelworks
Henan Mine Crane Group's 280-tonne four-girder foundry crane remained in service at a Chinese steelworks in July 2025, fourteen years after its 2011 commissioning.
Read story →
Baowu Steelworks Cranes Pass Factory A-Inspection
Henan Mine Crane Group’s slab-clamp and electromagnetic beam cranes passed Baowu factory A-inspection with PLC control, anti-sway and redundant inverters.
Read story →
Henan Mine Crane Group Ships Crane Batch for International Projects
Henan Mine Crane Group dispatched cranes from its intelligent industrial park on June 25, 2025, supplying overseas projects with equipment and technical guidance.
Read story →











