Runway and structural support
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Move machines and fabricated assemblies across a workshop bay using an electric wire-rope hoist, trolley and single-girder bridge. Start with the complete suspended mass and required hook positions, then match the bridge and runway to the handling cycle.

Yellow single-girder overhead bridges spanning a bright industrial workshop. Crane-family reference; confirm the selected rating and layout.
Listed rated capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Initial load choices | 10 t or 16 t; select one complete crane and hoist configuration. |
|---|---|
| Lifting mechanism | Electric wire-rope hoist with electric trolley. |
| Bridge-travel reference | The supplier listing describes an inverter travel range of 2–20 m/min; the selected speed schedule is part of the technical offer. |
| Control alternatives | Ground pendant, radio or cabin arrangement, with the selected command and stopping functions specified. |
| Span basis | Distance between runway rail centres, in m; the bridge, end carriages and wheel reactions follow the selected layout. |
| Useful lifting height | Highest and lowest required hook positions, including lifting attachments and roof-service clearances. |
| Duty and protection | Load spectrum, starts, travel distance and shifts determine the mechanism schedule and selected overload/limit functions. |
| Electrical interface | State site voltage, frequency and phase; match the motor, controls and moving power feed to the same supply. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.
State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, hoist or trolley, travel drives, controls and specified safety functions. |
| Runway and power feed | Rails, supporting steelwork, power-feed system and the allocation of building interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
A 10 t or 16 t rating refers to the selected crane and lifting arrangement. The purchase load includes the handled item and the suspended lifting gear. The product is intended for workshop material handling with vertical lifting, trolley travel and bridge travel.
Useful lift and working coverage should be measured at the hook. Rail-centre span, side approach and end approach describe different dimensions. A compact hoist can improve the usable hook envelope, but its headroom, wheel reactions and service space still belong in the coordinated layout.
ENGINEERING SELECTION
Add the item, lifting beam, sling and other suspended attachment masses before comparing the 10 t and 16 t choices. A 9.4 t item with 0.8 t of rigging creates a 10.2 t suspended load, above a 10 t rating.
Mark pickup and landing points and measure the runway rail centres. Check both trolley-side approaches and bridge end approaches rather than treating building width as working coverage.
Frequent positioning calls for a useful low-speed setting and suitable braking. Compare lifting, trolley and bridge speeds individually, together with starts and operating shifts.
EQUIPMENT AND INTERFACES
Photographs illustrate the archived equipment. The selected technical offer defines the supplied rating and arrangement.



Henan Mine Crane Group
10 t or 16 t; select one complete crane and hoist configuration.
Identify support/rail or floor work, power feed, delivery, unloading, installation and commissioning responsibilities.
Compare offers for the same configuration, document revision, quantity, delivery term and site-service scope.
Henan Mine Crane Group
Product and mechanism identities, rated load cases, dimensions, motions and the selected control/protection package.
General arrangement, lifting interface, site envelope and case-based support data matched to the same revision.
Agreed inspection/test plan, applicable equipment documents, operating instructions, service parts and allocated handover responsibilities.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-11. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
The suspended lifting beam, slings and attachments also contribute to the lifting load. Compare the complete load with the selected rated arrangement.
Span is measured between the centres of the two runway rails. Building width and hook coverage are separate dimensions.
No. It is the bridge-travel reference described in the supplier listing. Lifting and trolley speeds are scheduled separately for the selected configuration.