Home / Buyer resources / Quality & inspection

01 / Technical assurance

Know what will be checked before your crane leaves the factory.

A quotation is easier to trust when the inspection and acceptance scope is written down. Define the checks that match your crane, operating risk and project specification before placing an order.

What the buyer needs to resolve

A generic “quality checked” line cannot tell your team which dimensions, functions or records will be available at handover.

01 / Decision point

Start with an agreed inspection plan

Ask the supplier to identify the applicable drawings, selected components, fabrication stages and inspection hold points. Your purchase specification should say which checks are routine, which require your witness and which reports you need for site acceptance.

  • Approved general arrangement and equipment schedule
  • Applicable design standard and duty classification
  • Inspection and test plan with responsibilities and witness notice
02 / Decision point

Check the dimensions and build that matter

Review bridge and trolley interfaces, runway dimensions, hook approaches, clearances and installation tolerances against your building drawings. Henan Mine Crane Group shows coordinate-measuring equipment in its inspection centre; ask which measurement records apply to your ordered equipment.

  • Critical dimensions and fit-up records
  • Weld, coating and component documentation where specified
  • Electrical and control-cabinet checks
03 / Decision point

Agree functional and load-test criteria

Define how hoisting, travel, braking, limits, emergency stops and any special attachments will be demonstrated. State the test loads, procedures, acceptance limits and witness arrangements required by the contract and relevant regulations.

  • Named functions and safety devices to demonstrate
  • Factory versus site test boundaries
  • Signed results and corrective-action closure
04 / Decision point

Make the handover auditable

Before shipment, confirm the final document set, drawing revisions, certificates and any open items. Decide who signs acceptance and how a non-conformity affects dispatch.

  • Final inspection and test records
  • As-built drawings, manuals and electrical diagrams
  • Punch list, concessions and approval to ship
Coordinate-measuring equipment in the Henan Mine Crane Group inspection centre
An inspection-centre example; confirm the actual inspection scope for your crane.

Before you approve the order

Ask for a project-specific inspection and test plan as part of the offer; confirm test criteria and the records you will receive before the purchase order.

Ask for records that identify your ordered crane

An inspection record is useful when it can be traced to the ordered equipment and an agreed acceptance criterion. Define the document register with the supplier before production. Mark which records are required for review, witnessing, dispatch release and site handover.

Identify the object and revision

Each applicable record should identify the order, crane or component, drawing revision, inspection date and responsible inspector. Match the final equipment and component schedule to the delivered configuration.

State what was checked

Name the measured dimension or demonstrated function, the procedure and acceptance limit, the actual result and the measuring or test equipment where required. A generic “passed” stamp does not describe the agreed check.

Close deviations visibly

List non-conformities, agreed corrective actions, reinspection evidence and any approved concession. Name the party authorised to accept the result and release shipment. Keep unresolved items visible in the handover register.

Review certificates against their exact scope: the issuing body, identified product or component, applicable standard and covered configuration. A component document or a certificate for another model does not establish that the complete ordered crane meets every destination requirement. Set the required conformity documents for the project country in the purchase specification.

Keep factory and site evidence separate in the register. Factory checks address the agreed factory scope; erection, site wiring, runway interfaces and site tests still need the records specified for installation and local acceptance. Agree the test procedure and loads for each stage instead of copying an arbitrary percentage into the order.

Continue your purchase planning

Review related topics and include the relevant questions in your enquiry.

Discuss the scope with our team.

Tell us your project country and lifting task. Share the drawings and requirements available now; the final technical and commercial scope should be confirmed in the offer.

Request a crane quotation →

These checklists are procurement guidance. Equipment, services, tests and warranties are subject to the agreed contract and local requirements.