04 / Operational readiness
Make the handover usable for the people who will run the crane.
Training should match the supplied controls and the real lifting task. Define who needs instruction, what must be demonstrated and which records your operations team will receive.
What the buyer needs to resolve
A manual handed over at the end of commissioning does not establish that operators and maintainers understand the equipment at their site.
Identify the trainees and roles
Separate operator, rigger, supervisor and maintenance needs. Confirm language, attendee numbers, site access and local certification requirements. Your employer remains responsible for authorising competent personnel under local rules.
- Operator and maintenance groups
- Training language and attendance plan
- Local competency and authorisation requirements
Cover the actual equipment
Walk through the supplied pendant, radio or cabin controls; rated capacities; duty limitations; travel zones; hook and attachment interfaces; alarms and limit devices. Use site-specific load routes in exercises.
- Selected control functions and limits
- Load charts, rigging and attachment rules
- Working-area hazards and exclusion zones
Practice routine and abnormal conditions
Define pre-use checks, safe shutdown, fault reporting and emergency response. Maintenance instruction should cover isolation, inspection points and the difference between operator checks and qualified maintenance work.
- Daily visual and functional checks
- Emergency stop and recovery procedure
- Lockout and maintenance handoff
Record a useful handover
Agree whether training is in the supply scope, who delivers it and when. Keep the agenda, attendance, manuals and any practical demonstration record with the commissioning documents.
- Training scope and trainer responsibility
- Attendance and demonstration record
- Manuals and follow-up questions channel
Before you approve the order
Ask the supplier to identify the training scope and handover documents in the offer, then align them with your site safety and competency programme.
Continue your purchase planning
Review related topics and include the relevant questions in your enquiry.
Discuss the scope with our team.
Tell us your project country and lifting task. Share the drawings and requirements available now; the final technical and commercial scope should be confirmed in the offer.
Request a crane quotation →These checklists are procurement guidance. Equipment, services, tests and warranties are subject to the agreed contract and local requirements.












