Runway and structural support
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Red foundry bridge inside a steelmaking bay
Listed rated capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Ladle and main-lift cases | Provide ladle and contents masses, lifting beam/suspension masses, trunnion or other connection drawings, centre of gravity and process load states. Identify the governing complete main-lift case and required handling positions. |
|---|---|
| Auxiliary and pouring operations | Describe each auxiliary load, connection, movement and its relationship to the main lift. Any coordinated pouring or turning operation needs explicit selected load cases, permitted positions and commands; separate hook or trolley ratings do not create an additive capacity. |
| Process and runway geometry | Map furnace, refining, ladle-car and other required stations from a common datum. Show runway centres/levels, useful main and auxiliary hook positions, connection approaches, ladle envelopes and clearances through each process step. |
| Thermal and environmental brief | State material/process temperatures, radiant exposure locations and duration, ambient conditions, dust and splash exposure. Request the selected thermal measures, equipment locations, access and inspection arrangements against that brief without assuming a temperature limit or shielding package. |
| Duty, commands and recovery | Describe loaded/empty sequences, dwell periods, cycles, starts and operating hours. Agree selected crane/mechanism duty, drives, controls, operator view and the required limit, stop, fault and recovery behaviour for the intended process. |
| Support, installation and service | Obtain selected wheel spacing and governing runway/support reaction cases. Allocate structural and rail checks, supply routing, erection resources and hot-zone access, including a practical route for inspection and major-component replacement. |
| Selected package and acceptance | Document the selected bridge/trolley configuration, lifting beam/hooks, electrical equipment and thermal measures with responsibility boundaries. Agree process-interface and functional/load checks, permitted operating cases, inspection records and handover documents for the application. |
| Hook ratings | Complete ladle and contents load, rigging and each hook's independent and combined load case. |
| Ladle route | Pickup, transport, pour and set-down workpoints, hook approaches and vessel envelope. |
| Duty | Cycle timing, load spectrum, operating shifts and selected crane mechanism classification. |
| Thermal conditions | Ambient temperature, radiant exposure, shielding and specified protection for the actual route. |
| Controls and site fit | Operator location, speeds, limits, runway reactions, support data, power and installation scope. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.
State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, hoist or trolley, travel drives, controls and specified safety functions. |
| Runway and power feed | Rails, supporting steelwork, power-feed system and the allocation of building interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
Foundry Ladle Overhead Crane. Available rated-load options: 100T main-lift request; complete ladle-load and auxiliary tasks to agree or 160T main-lift request; complete ladle-load and auxiliary tasks to agree or 200T main-lift request; complete ladle-load and auxiliary tasks to agree. A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement. Also specified as a bridge crane, this equipment can be configured for the work area and lifting task. Defining vessel mass, hook duties, process route and thermal exposure helps buyers compare a crane offer against the actual casting cycle. Common applications include ladle transfer between furnace and casting stations and foundry charging and tapping operations. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.
Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.
START WITH THE LOAD
A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement. Defining vessel mass, hook duties, process route and thermal exposure helps buyers compare a crane offer against the actual casting cycle. Typical applications include ladle transfer between furnace and casting stations, foundry charging and tapping operations, tundish or casting-line service. Compare the proposed configuration with the actual load, reach, duty and site dimensions.
State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.
Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.
Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.
Saved supplier listing captured 2026-10-12; quantity tiers: 1-4 sets: US$213,659 per set · ≥5 sets: US$196,584 per set. The listing does not establish a current, project-specific or delivered price. Main and auxiliary hook duties, vessel load, span and process clearances determine the crane configuration. Crane classification, selected hoist or trolley, speeds and controls affect the mechanisms. Thermal protection, power, rails, support structure and installation are project-dependent. Transport, process testing, commissioning and scope boundaries must be confirmed in the current offer.
SEE THE EQUIPMENT
Review these foundry ladle overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.
01 / FOUNDRY LADLE OVERHEAD CRANE · 01Red foundry bridge inside a steelmaking bay. State hot-metal, vessel and rigging masses for each process stage. Assign the main and auxiliary hook tasks and agree every permitted lifting and tipping load case. State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.
02 / FOUNDRY LADLE OVERHEAD CRANE · 02Red heavy bridge crane during outdoor assembly. Provide furnace and pouring-station geometry, vessel suspension details, pickup levels and thermal exposure. Check hook approaches, useful lifting travel and the clearance needed for tipping. Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.
03 / FOUNDRY LADLE OVERHEAD CRANE · 03Red foundry bridge crane above a steelworks process aisle. Specify duty, control positions, heat protection, brake and limit functions and service access. Obtain the selected wheel loads, runway requirements and commissioning and acceptance scope. Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.
Specify pickup, transfer, pouring and standby positions, main and auxiliary hook functions, movement speeds and operator view. Confirm heat exposure, limits and agreed operating sequence for the selected crane.
COMPARE THE COMPLETE PROPOSAL
Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.
Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.
SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE
Provide the layout and operating conditions to compare a foundry ladle overhead crane quotation against your actual project.
Discuss your workshopHenan Mine Crane Group
Compare itemized quotations with the same equipment, delivery and site-service boundaries.
Confirm 100, 160 and 200 ton, selected mechanisms, control options and required accessories.
List rail or support work, power supply, clearances and purchaser-provided services.
State transport, unloading, erection, testing, commissioning and service parts included in the offer.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement.
Ladle, contents and hook duties: State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases. Process route and clearance: Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones. Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.
US$196,584–213,659 per set is the saved supplier-listing reference, captured 2026-10-12. Main and auxiliary hook duties, vessel load, span and process clearances determine the crane configuration. Crane classification, selected hoist or trolley, speeds and controls affect the mechanisms. Thermal protection, power, rails, support structure and installation are project-dependent. Transport, process testing, commissioning and scope boundaries must be confirmed in the current offer. Request a current quotation for the selected configuration, quantity, delivery and services.
Provide ladle tare, maximum contents, lifting attachments and the permitted main and auxiliary hook load cases. Confirm the required rating and process sequence in the technical offer.
Hook duties, span, clearance, duty cycle, thermal conditions, drives, controls, support structure, rail and installation scope affect the project price.