Overhead cranes / Engineering selection

Foundry Ladle Overhead Crane

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Equipment reference1601726964389Configured for your project
Technical offer defines final specification
PRODUCT CONFIGURATIONYellow multi-girder bridge viewed from below.

Yellow multi-girder bridge viewed from below

Selection at a glance
125 and 32 ton

Listed rated capacity

Requested crane and inspection basis
Request 125T main and 32T auxiliary as separate ratings, with complete hook loads and the task of each in T. Obtain the matched mechanism, duty and outline schedules. Use the agreed equipment and technical revision when defining the factory inspection scope.
Factory inspection items and criteria
Ask the supplier to propose inspections and checks for the selected order, identifying the applicable basis, method, conditions and required records. Agree the items and acceptance criteria with the responsible purchaser reviewers. Include any required test setup in that selected inspection plan.
Notice and witness arrangements
Identify the items requiring purchaser attendance, remote observation or supplier records. Agree notice periods, location, access and responsible contacts. Specify the proposed video or photographic evidence and how it will be linked to the equipment and inspection item.
Equipment identity and results
Request a record of the crane or component identifier, applicable drawing revision, agreed inspection item, method and actual conditions. Name the attendee and responsible signatories. Retain the recorded result and supporting evidence against the equipment that will be supplied.
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

Foundry Ladle Overhead Crane listed specifications
Requested crane and inspection basisRequest 125T main and 32T auxiliary as separate ratings, with complete hook loads and the task of each in T. Obtain the matched mechanism, duty and outline schedules. Use the agreed equipment and technical revision when defining the factory inspection scope.
Factory inspection items and criteriaAsk the supplier to propose inspections and checks for the selected order, identifying the applicable basis, method, conditions and required records. Agree the items and acceptance criteria with the responsible purchaser reviewers. Include any required test setup in that selected inspection plan.
Notice and witness arrangementsIdentify the items requiring purchaser attendance, remote observation or supplier records. Agree notice periods, location, access and responsible contacts. Specify the proposed video or photographic evidence and how it will be linked to the equipment and inspection item.
Equipment identity and resultsRequest a record of the crane or component identifier, applicable drawing revision, agreed inspection item, method and actual conditions. Name the attendee and responsible signatories. Retain the recorded result and supporting evidence against the equipment that will be supplied.
Findings and follow-up actionsAgree how findings, discrepancies and missing evidence will be recorded and assigned. Identify the response required, responsible provider and review needed to close each action. Keep the documented disposition available for the relevant inspection and dispatch decision.
Documents for dispatch reviewList the selected schedules, current drawings, manuals, inspection evidence, parts information and loose-item records required for dispatch review. Assign a provider and revision to each document. Specify the certificates and warranty terms applicable to the ordered package and identify any outstanding items.
Factory-to-site completion scopeProvide the process information, span and useful hook travel in m, with detailed interfaces in mm. Agree which factory records accompany the shipment and which installation and commissioning checks remain at site. Name the parties responsible for verifying those remaining interfaces.
Hook ratingsComplete ladle and contents load, rigging and each hook's independent and combined load case.
Ladle routePickup, transport, pour and set-down workpoints, hook approaches and vessel envelope.
DutyCycle timing, load spectrum, operating shifts and selected crane mechanism classification.
Thermal conditionsAmbient temperature, radiant exposure, shielding and specified protection for the actual route.
Controls and site fitOperator location, speeds, limits, runway reactions, support data, power and installation scope.

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Runway and structural support

Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.

Hook coverage and useful height

Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.

Duty, power and environment

State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Crane equipmentSelected bridge, hoist or trolley, travel drives, controls and specified safety functions.
Runway and power feedRails, supporting steelwork, power-feed system and the allocation of building interfaces.
Delivery and installationNamed delivery term, unloading, installation work, local labour and access equipment.
Acceptance and handoverInspection and test plan, records, documentation, training, spare parts and warranty terms.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

Foundry Ladle Overhead Crane. Main / auxiliary hook ratings: 125T main / 32T auxiliary load request. A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement. Also specified as a bridge crane, this equipment can be configured for the work area and lifting task. Defining vessel mass, hook duties, process route and thermal exposure helps buyers compare a crane offer against the actual casting cycle. Common applications include ladle transfer between furnace and casting stations and foundry charging and tapping operations. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.

Equipment
Foundry Ladle Overhead Crane
Capacity / selection
125T main / 32T auxiliary load request
Application
ladle transfer between furnace and casting stations
Archived supplier-listing reference
US$36,800–37,000 / set

Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.

START WITH THE LOAD

Choose the Right Foundry Ladle Overhead Crane

A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement. Defining vessel mass, hook duties, process route and thermal exposure helps buyers compare a crane offer against the actual casting cycle. Typical applications include ladle transfer between furnace and casting stations, foundry charging and tapping operations, tundish or casting-line service. Compare the proposed configuration with the actual load, reach, duty and site dimensions.

Ladle, contents and hook duties

State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.

Process route and clearance

Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.

Duty, heat and controls

Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.

Saved supplier listing captured 2026-10-13; quantity tiers: 1-2 sets: US$37,000 per set · ≥3 sets: US$36,800 per set. The listing does not establish a current, project-specific or delivered price. Main and auxiliary hook duties, vessel load, span and process clearances determine the crane configuration. Crane classification, selected hoist or trolley, speeds and controls affect the mechanisms. Thermal protection, power, rails, support structure and installation are project-dependent. Transport, process testing, commissioning and scope boundaries must be confirmed in the current offer.

SEE THE EQUIPMENT

Foundry Ladle Overhead Crane Features

Review these foundry ladle overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.

Yellow multi-girder bridge viewed from below.01 / FOUNDRY LADLE OVERHEAD CRANE · 01

Ladle, contents and hook duties

Yellow multi-girder bridge viewed from below. State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.

Orange foundry overhead crane with hanging hook gear viewed from a plant walkway.02 / FOUNDRY LADLE OVERHEAD CRANE · 02

Process route and clearance

Orange foundry overhead crane with hanging hook gear viewed from a plant walkway. Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.

Red foundry overhead crane with upper walkway and hook gear in a steel plant.03 / FOUNDRY LADLE OVERHEAD CRANE · 03

Duty, heat and controls

Red foundry overhead crane with upper walkway and hook gear in a steel plant. Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.

Coordinate Ladle Motions and Process Stops

Specify pickup, transfer, pouring and standby positions, main and auxiliary hook functions, movement speeds and operator view. Confirm heat exposure, limits and agreed operating sequence for the selected crane.

COMPARE THE COMPLETE PROPOSAL

Define your supply package.

Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.

EQUIPMENT PACKAGE

Selected Foundry Ladle Overhead Crane

  • Rated load or task: 125 and 32 ton
  • State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.
  • Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.
SITE INTERFACES

Power, support & layout

  • Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.
  • Confirm support, power, clearances and purchaser-provided work in the offer.
  • Separate equipment price, delivery and site services for comparison.
DELIVERY & SERVICE

Order & installation scope

  • State transport, unloading and erection access.
  • List agreed testing, commissioning, manuals and operator handover.
  • Confirm maintenance access, wear parts and service support requested.

Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.

SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE

Specify Your Foundry Ladle Overhead Crane

Provide the layout and operating conditions to compare a foundry ladle overhead crane quotation against your actual project.

Discuss your site
01 Ladle, contents and hook duties
State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.
02 Process route and clearance
Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.
03 Duty, heat and controls
Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.

Henan Mine Crane Group

Foundry Ladle Overhead Crane Supply Scope

Compare itemized quotations with the same equipment, delivery and site-service boundaries.

Crane equipment

Confirm 125 and 32 ton, selected mechanisms, control options and required accessories.

Site interfaces

List rail or support work, power supply, clearances and purchaser-provided services.

Delivery & installation

State transport, unloading, erection, testing, commissioning and service parts included in the offer.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Archived supplier-listing price rangeUS$36,800–37,000per set · MOQ 1 set

Range combines the price tiers shown in the saved listing. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 1-2 setsUS$37,000 / set
  • ≥3 setsUS$36,800 / set

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

What is a foundry ladle overhead crane?

A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement.

What information is needed to quote a foundry ladle overhead crane?

Ladle, contents and hook duties: State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases. Process route and clearance: Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones. Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.

How much does a foundry ladle overhead crane cost?

US$36,800–37,000 per set is the saved supplier-listing reference, captured 2026-10-13. Main and auxiliary hook duties, vessel load, span and process clearances determine the crane configuration. Crane classification, selected hoist or trolley, speeds and controls affect the mechanisms. Thermal protection, power, rails, support structure and installation are project-dependent. Transport, process testing, commissioning and scope boundaries must be confirmed in the current offer. Request a current quotation for the selected configuration, quantity, delivery and services.

What load is used to select a ladle crane?

Provide ladle tare, maximum contents, lifting attachments and the permitted main and auxiliary hook load cases. Confirm the required rating and process sequence in the technical offer.

What affects a foundry ladle crane quotation?

Hook duties, span, clearance, duty cycle, thermal conditions, drives, controls, support structure, rail and installation scope affect the project price.

125 and 32 tonOverhead cranes
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…