Overhead cranes / Engineering selection

Single Girder Grab Overhead Crane

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Equipment reference1601962797298Configured for your project
Technical offer defines final specification
PRODUCT CONFIGURATIONRed single-girder overhead crane marked 10t with a suspended grab at an outdoor construction site

Red single-girder overhead crane marked 10t with a suspended grab at an outdoor construction site.

Selection at a glance
Configure to requirement

Listed rated capacity

Crane arrangement
Single-girder overhead bridge crane
Lifting arrangement
Project-selected electric hoist and matched grab bucket
Coverage
Runway rail centres, rail elevation, roof services and side/end approaches
Useful lift
Required upper/lower hook positions with rigging
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

Single Girder Grab Overhead Crane listed specifications
Requested rated loadProject selected; include rigging and attachments
Crane arrangementSingle-girder overhead bridge crane
Lifting arrangementProject-selected electric hoist and matched grab bucket
CoverageRunway rail centres, rail elevation, roof services and side/end approaches
Useful liftRequired upper/lower hook positions with rigging
Operating dutyLoad spectrum, lifts per hour, starts, shifts and travel distances
ControlsSelected operator station, speeds, braking and protective functions
Rail and structureProject wheel loads, rail geometry and support checks
Electrical supplySite voltage, frequency, phase, isolation and moving power feed
Order scopeDelivery, erection, testing, commissioning and documents
Handled materialLoose bulk density, size, moisture, abrasiveness and filling behaviour.
Grab and gross suspended loadWorking volume, fill allowance, maximum material payload, grab tare and suspended accessories; confirm the crane rating and load case.

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Runway and structural support

Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.

Hook coverage and useful height

Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.

Duty, power and environment

State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Crane equipmentSelected bridge, hoist or trolley, travel drives, controls and specified safety functions.
Runway and power feedRails, supporting steelwork, power-feed system and the allocation of building interfaces.
Delivery and installationNamed delivery term, unloading, installation work, local labour and access equipment.
Acceptance and handoverInspection and test plan, records, documentation, training, spare parts and warranty terms.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

Single Girder Grab Overhead Crane. An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. A grab-equipped crane picks up and discharges bulk material with a grab selected for the material and handling cycle. Also specified as a single girder bridge crane, this equipment can be configured for the work area and lifting task. Matching the grab payload and cycle to the crane, stockpile and receiving hopper helps buyers compare a complete material-handling package. Common applications include bulk-material stockpile and hopper loading and process-bin feeding and material transfer. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.

Equipment
Single Girder Grab Overhead Crane
Capacity / selection
Select the rated load
Application
bulk-material stockpile and hopper loading
Archived supplier-listing reference
US$3,000 / piece

Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.

START WITH THE LOAD

Choose the Right Single Girder Grab Overhead Crane

An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. A grab-equipped crane picks up and discharges bulk material with a grab selected for the material and handling cycle. Matching the grab payload and cycle to the crane, stockpile and receiving hopper helps buyers compare a complete material-handling package. Typical applications include bulk-material stockpile and hopper loading, process-bin feeding and material transfer, scrap or recycling handling where the selected grab suits the material. Compare the proposed configuration with the actual load, reach, duty and site dimensions.

Material, grab volume and gross load

Provide material type, loose bulk density, piece size, moisture and abrasiveness. Specify grab working volume, fill allowance and tare mass; confirm the maximum material payload plus grab and suspended accessories against the crane rating.

Stockpile, hopper and runway coverage

Map pickup depth, stockpile limits, receiving-hopper opening and discharge height, open-grab envelope and travel route. Provide bridge span, runway length, supporting structure, hook approaches and building clearances.

Handling cycle, control and supply scope

State target material throughput, lift and travel distances, cycles per hour, shifts and positioning needs. Confirm grab opening/closing mechanism, power and control interface, operator view and quoted scope for crane, grab, power feed, installation and testing.

Saved supplier listing captured 2026-10-11; quantity tiers: Minimum order quantity: 1 piece: US$3,000 per piece. The listing does not establish a current, project-specific or delivered price. Material density, working volume, filling conditions and grab tare determine the required payload and crane gross suspended load. Bridge span, runway coverage and lift height, handling duty, speeds and grab operating mechanism affect the equipment package. Grab power and controls, rope or cable arrangement, wear parts, hopper interfaces and dust or weather requirements change the supplied scope. Runway rails and supports, power supply, transport, erection, commissioning and acceptance tests must be itemized in the current quotation.

SEE THE EQUIPMENT

Single Girder Grab Overhead Crane Features

Review these single girder grab overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.

Red single-girder overhead crane marked 10t with a suspended grab at an outdoor construction site01 / SINGLE GIRDER GRAB OVERHEAD CRANE · 01

Material, grab volume and gross load

Red single-girder overhead crane marked 10t with a suspended grab at an outdoor construction site. Include all rigging and attachments, lifting points and the daily operating cycle. Provide material type, loose bulk density, piece size, moisture and abrasiveness. Specify grab working volume, fill allowance and tare mass; confirm the maximum material payload plus grab and suspended accessories against the crane rating.

Red overhead crane with a suspended grab bucket in a tall industrial material bay02 / SINGLE GIRDER GRAB OVERHEAD CRANE · 02

Stockpile, hopper and runway coverage

Red overhead crane with a suspended grab bucket in a tall industrial material bay. Mark the pickup and landing positions, travel route and required hook envelope on a site plan. Map pickup depth, stockpile limits, receiving-hopper opening and discharge height, open-grab envelope and travel route. Provide bridge span, runway length, supporting structure, hook approaches and building clearances.

Orange overhead bridge with green hoist above a suspended white grab bucket in a workshop03 / SINGLE GIRDER GRAB OVERHEAD CRANE · 03

Handling cycle, control and supply scope

Orange overhead bridge with green hoist above a suspended white grab bucket in a workshop. Confirm supports, power, controls, service access and delivery and installation responsibilities. State target material throughput, lift and travel distances, cycles per hour, shifts and positioning needs. Confirm grab opening/closing mechanism, power and control interface, operator view and quoted scope for crane, grab, power feed, installation and testing.

Coordinate Grab Filling, Travel and Discharge

Describe the pickup, closing, hoisting, travelling and discharge sequence. Confirm the selected rope, electric or hydraulic grab mechanism, any radio release, power interface, operator sightlines, motion speeds and limits; do not assume one control arrangement suits every grab.

COMPARE THE COMPLETE PROPOSAL

Define your supply package.

Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.

EQUIPMENT PACKAGE

Selected Single Girder Grab Overhead Crane

  • Rated load or task: confirm for the application
  • Provide material type, loose bulk density, piece size, moisture and abrasiveness. Specify grab working volume, fill allowance and tare mass; confirm the maximum material payload plus grab and suspended accessories against the crane rating.
  • Map pickup depth, stockpile limits, receiving-hopper opening and discharge height, open-grab envelope and travel route. Provide bridge span, runway length, supporting structure, hook approaches and building clearances.
SITE INTERFACES

Power, support & layout

  • State target material throughput, lift and travel distances, cycles per hour, shifts and positioning needs. Confirm grab opening/closing mechanism, power and control interface, operator view and quoted scope for crane, grab, power feed, installation and testing.
  • Confirm support, power, clearances and purchaser-provided work in the offer.
  • Separate equipment price, delivery and site services for comparison.
DELIVERY & SERVICE

Order & installation scope

  • State transport, unloading and erection access.
  • List agreed testing, commissioning, manuals and operator handover.
  • Confirm maintenance access, wear parts and service support requested.

Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.

SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE

Specify Your Single Girder Grab Overhead Crane

Provide the layout and operating conditions to compare a single girder grab overhead crane quotation against your actual project.

Discuss your workshop
01 Material, grab volume and gross load
Provide material type, loose bulk density, piece size, moisture and abrasiveness. Specify grab working volume, fill allowance and tare mass; confirm the maximum material payload plus grab and suspended accessories against the crane rating.
02 Stockpile, hopper and runway coverage
Map pickup depth, stockpile limits, receiving-hopper opening and discharge height, open-grab envelope and travel route. Provide bridge span, runway length, supporting structure, hook approaches and building clearances.
03 Handling cycle, control and supply scope
State target material throughput, lift and travel distances, cycles per hour, shifts and positioning needs. Confirm grab opening/closing mechanism, power and control interface, operator view and quoted scope for crane, grab, power feed, installation and testing.

Henan Mine Crane Group

Single Girder Grab Overhead Crane Supply Scope

Compare itemized quotations with the same equipment, delivery and site-service boundaries.

Crane equipment

Confirm rated capacity, selected mechanisms, control options and required accessories.

Site interfaces

List rail or support work, power supply, clearances and purchaser-provided services.

Delivery & installation

State transport, unloading, erection, testing, commissioning and service parts included in the offer.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Single saved supplier-listing priceUS$3,000per piece · MOQ 1 piece

The saved listing provides one price, not a range. Captured 2026-10-11. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • Minimum order quantity: 1 pieceUS$3,000 / piece

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

What is a single girder grab overhead crane?

An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. A grab-equipped crane picks up and discharges bulk material with a grab selected for the material and handling cycle.

What information is needed to quote a single girder grab overhead crane?

Material, grab volume and gross load: Provide material type, loose bulk density, piece size, moisture and abrasiveness. Specify grab working volume, fill allowance and tare mass; confirm the maximum material payload plus grab and suspended accessories against the crane rating. Stockpile, hopper and runway coverage: Map pickup depth, stockpile limits, receiving-hopper opening and discharge height, open-grab envelope and travel route. Provide bridge span, runway length, supporting structure, hook approaches and building clearances. Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.

How much does a single girder grab overhead crane cost?

US$3,000 per piece is the saved supplier-listing reference, captured 2026-10-11. Material density, working volume, filling conditions and grab tare determine the required payload and crane gross suspended load. Bridge span, runway coverage and lift height, handling duty, speeds and grab operating mechanism affect the equipment package. Grab power and controls, rope or cable arrangement, wear parts, hopper interfaces and dust or weather requirements change the supplied scope. Runway rails and supports, power supply, transport, erection, commissioning and acceptance tests must be itemized in the current quotation. Request a current quotation for the selected configuration, quantity, delivery and services.

Does the crane rating mean the material payload?

Confirm how the supplier defines the stated rating. Check the total suspended load, including the grab, material and accessories. Select working volume using the specified material density and filling conditions; grab volume alone does not establish payload.

What details are needed for a grab crane quotation?

Provide material and density, required payload or throughput, grab volume and tare, pickup and hopper layout, span, lift and travel distances, duty cycle, power and controls. Itemize the crane, grab, rail or support work, delivery, installation and testing.

Configure to requirementOverhead cranes
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…