Travel path and supporting surface
Provide the yard layout, travel route, rail or floor arrangement and ground or foundation information. Confirm wheel loads and support requirements for the selected configuration.
Review the lifted load, working coverage and yard interfaces together with the selected rail-mounted, portable, semi-gantry or rubber-tyred arrangement.

Orange grab gantry over a material-storage lane
Listed rated capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Rated load | Specify grab tare, material bulk density, bucket volume and the complete suspended operating load. |
|---|---|
| Grab payload | Density x filled volume, plus grab tare |
| Span | Provide surveyed support or rail-centre dimensions and the required working coverage. |
| Lift | Multiple values 5-25 m; select stockpile clearance |
| Hoist | Electric winch trolley described; verify reeving and duty |
| Controls | Cab or radio options listed |
| Outdoor protection | Wind restraints, drainage and coating to specify |
| Handled material | Loose bulk density, size, moisture, abrasiveness and filling behaviour. |
| Grab and gross suspended load | Working volume, fill allowance, maximum material payload, grab tare and suspended accessories; confirm the crane rating and load case. |
| Gantry and handling route | Span or rail gauge, ground-rail travel, pickup depth, hopper opening, discharge height and open-grab clearances. |
| Duty and controls | Material throughput target, cycle and shifts, selected lift/travel speeds, opening/closing mechanism, power and command interface. |
| Site and supply scope | Wheel reactions, ground support, outdoor conditions, power feed, grab, rails, foundations, erection and agreed tests. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide the yard layout, travel route, rail or floor arrangement and ground or foundation information. Confirm wheel loads and support requirements for the selected configuration.
Show the required span, leg clearance, overhang if applicable, hook approaches and upper and lower hook positions. Identify vehicle routes and nearby structures.
Declare wind, temperature, corrosion and exposure where applicable. Confirm power delivery, travel restrictions and the operating cycle in the technical offer.
| Work package | Agree in the quotation |
|---|---|
| Gantry equipment | Selected bridge, legs, hoist or trolley, travel arrangement, controls and specified safety functions. |
| Travel support and utilities | Rails or suitable supporting surface, foundations where applicable, power feed and site interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Review the lifted load, working coverage and yard interfaces together with the selected rail-mounted, portable, semi-gantry or rubber-tyred arrangement.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
Double Girder Grab Gantry Crane. Selection basis: Specify required rated load. A gantry crane carries a bridge and hoist on legs that travel on the specified ground rails or wheel path. A grab-equipped crane picks up and discharges bulk material with a grab selected for the material and handling cycle. Also specified as a gantry crane, this equipment can be configured for the work area and lifting task. Matching the grab payload and cycle to the crane, stockpile and receiving hopper helps buyers compare a complete material-handling package. Common applications include bulk-material stockpile and hopper loading and process-bin feeding and material transfer. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.
Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.
START WITH THE LOAD
A gantry crane carries a bridge and hoist on legs that travel on the specified ground rails or wheel path. A grab-equipped crane picks up and discharges bulk material with a grab selected for the material and handling cycle. Matching the grab payload and cycle to the crane, stockpile and receiving hopper helps buyers compare a complete material-handling package. Typical applications include bulk-material stockpile and hopper loading, process-bin feeding and material transfer, scrap or recycling handling where the selected grab suits the material. Compare the proposed configuration with the actual load, reach, duty and site dimensions.
Provide material type, loose bulk density, piece size, moisture and abrasiveness. Specify grab working volume, fill allowance and tare mass; confirm the maximum material payload plus grab and suspended accessories against the crane rating.
Map pickup depth, stockpile limits, receiving-hopper opening and discharge height, open-grab envelope and travel route. Provide gantry span or rail gauge, ground-rail length, wheel-load support and outdoor exposure.
State target material throughput, lift and travel distances, cycles per hour, shifts and positioning needs. Confirm grab opening/closing mechanism, power and control interface, operator view and quoted scope for crane, grab, power feed, installation and testing.
Saved supplier listing captured 2026-10-12; quantity tiers: 最低起订量: 1 piece: US$6,000 per piece. The listing does not establish a current, project-specific or delivered price. Material density, working volume, filling conditions and grab tare determine the required payload and crane gross suspended load. Gantry span, rail gauge, lift height and travel route, handling duty, speeds and grab operating mechanism affect the equipment package. Grab power and controls, rope or cable arrangement, wear parts, hopper interfaces and dust or weather requirements change the supplied scope. Ground rails, foundations, power supply, transport, erection, commissioning and acceptance tests must be itemized in the current quotation.
SEE THE EQUIPMENT
Review these double girder grab gantry crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.
01 / DOUBLE GIRDER GRAB GANTRY CRANE · 01Orange grab gantry over a material-storage lane. Provide bulk density, particle size, storage conditions and throughput. Include grab, suspension and contents in the selected load cases and agree the grab operating cycle. Provide material type, loose bulk density, piece size, moisture and abrasiveness. Specify grab working volume, fill allowance and tare mass; confirm the maximum material payload plus grab and suspended accessories against the crane rating.
02 / DOUBLE GIRDER GRAB GANTRY CRANE · 02Red gantry beside bulk-handling vehicles. Give stockpile, hopper, vehicle and discharge geometry. Check the selected open-grab envelope, useful lifting travel, trolley approaches and crane travel route. Map pickup depth, stockpile limits, receiving-hopper opening and discharge height, open-grab envelope and travel route. Provide gantry span or rail gauge, ground-rail length, wheel-load support and outdoor exposure.
03 / DOUBLE GIRDER GRAB GANTRY CRANE · 03Yellow grab gantry beside a receiving hopper. Specify cycles per hour, motion speeds, power supply, controls and environmental exposure. Obtain selected support reactions, rail requirements, service access and functional acceptance checks. State target material throughput, lift and travel distances, cycles per hour, shifts and positioning needs. Confirm grab opening/closing mechanism, power and control interface, operator view and quoted scope for crane, grab, power feed, installation and testing.
Describe the pickup, closing, hoisting, travelling and discharge sequence. Confirm the selected rope, electric or hydraulic grab mechanism, any radio release, power interface, operator sightlines, motion speeds and limits; do not assume one control arrangement suits every grab.
COMPARE THE COMPLETE PROPOSAL
Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.
Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.
SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE
Provide the layout and operating conditions to compare a double girder grab gantry crane quotation against your actual project.
Discuss your workshopHenan Mine Crane Group
Compare itemized quotations with the same equipment, delivery and site-service boundaries.
Confirm the required rating, selected mechanisms, control options and required accessories.
List rail or support work, power supply, clearances and purchaser-provided services.
State transport, unloading, erection, testing, commissioning and service parts included in the offer.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
The saved listing provides one price, not a range. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark the travel path, working width, leg clearance, hook positions and load route. Include ground, rail or floor information and site access.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
A gantry crane carries a bridge and hoist on legs that travel on the specified ground rails or wheel path. A grab-equipped crane picks up and discharges bulk material with a grab selected for the material and handling cycle.
Material, grab volume and gross load: Provide material type, loose bulk density, piece size, moisture and abrasiveness. Specify grab working volume, fill allowance and tare mass; confirm the maximum material payload plus grab and suspended accessories against the crane rating. Yard, hopper and rail route: Map pickup depth, stockpile limits, receiving-hopper opening and discharge height, open-grab envelope and travel route. Provide gantry span or rail gauge, ground-rail length, wheel-load support and outdoor exposure. Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.
US$6,000 per piece is the saved supplier-listing reference, captured 2026-10-12. Material density, working volume, filling conditions and grab tare determine the required payload and crane gross suspended load. Gantry span, rail gauge, lift height and travel route, handling duty, speeds and grab operating mechanism affect the equipment package. Grab power and controls, rope or cable arrangement, wear parts, hopper interfaces and dust or weather requirements change the supplied scope. Ground rails, foundations, power supply, transport, erection, commissioning and acceptance tests must be itemized in the current quotation. Request a current quotation for the selected configuration, quantity, delivery and services.
Confirm how the supplier defines the stated rating. Check the total suspended load, including the grab, material and accessories. Select working volume using the specified material density and filling conditions; grab volume alone does not establish payload.
Provide material and density, required payload or throughput, grab volume and tare, pickup and hopper layout, span, lift and travel distances, duty cycle, power and controls. Itemize the crane, grab, rail or support work, delivery, installation and testing.