Runway and structural support
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Close view of a black hoist motor, cable and adjacent components on a workshop floor
Listed rated capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Lifting brief and selected hoist identity | Describe the goods, attachment, complete suspended load in T and expected handling pattern. Give runway rail-centre span and useful hook travel in m, with detailed work-space dimensions in mm. Request the selected hoist and trolley identities and the document references to use for the maintenance-access and service discussion. |
|---|---|
| Manufacturer maintenance information | Ask for the applicable manufacturer maintenance information for the selected hoist and trolley. Request identification of the service points, access requirements and equipment-specific resources that your maintenance team must review. Agree the document language, revision and delivery stage needed for the purchaser and appointed service provider. |
| Existing workshop access and available space | Provide the available workshop drawings, existing walkway or platform information and the space around the intended crane equipment in mm. Identify the site contact and building or access-system reviewer. Ask the supplier to show its selected equipment access requirements against those references and identify the information still required. |
| Service and component-removal envelopes | Request the selected manufacturer’s service-space and component-removal requirements, with relevant envelopes and reference dimensions in mm. Ask for the identities and masses in T of components relevant to the proposed service scope where needed by the appointed reviewers. Identify the external space, support resources and documents required for their planning. |
| Maintenance organisation and site resources | Describe the purchaser’s maintenance organisation, available personnel, appointed service providers and existing resources. Ask which resources the supplier’s selected equipment requires and which services it proposes to quote. Assign the coordination of equipment, building/access interfaces and external maintenance support to named responsible parties. |
| Electrical and building interfaces for service review | Request the selected electrical drawings, equipment connection information and applicable maintenance instructions for the quoted package. Identify the responsible site electrical and building parties and the information they need to review the interfaces. Include any proposed permanent access provisions and their design and supply responsibilities in the scope discussion. |
| Quoted service provisions and handover documents | Agree the equipment information, manufacturer documents and maintenance-related resources included in the order. Identify any separately quoted parts, tools, familiarisation or support services and their providers. Where the hoist or access arrangement changes, request revised service-space information and an updated responsibility and document schedule for the selected package. |
| Hook envelope | Required useful travel, upper and lower hook positions and top approach. |
| Available headroom | Rail elevation, roof beams, services and required equipment clearance. |
| Load and duty | Complete suspended load, load spectrum, cycle and lifts per shift. |
| Hoist arrangement | Selected low-headroom trolley or hoist, wheelbase and service clearance. |
| Runway and power | Rail centres, support loads, power feed, controls and installation boundary. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.
State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, hoist or trolley, travel drives, controls and specified safety functions. |
| Runway and power feed | Rails, supporting steelwork, power-feed system and the allocation of building interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
Low-Headroom Double Girder Overhead Crane. Available rated-load options: 3T complete suspended-load request or 5T complete suspended-load request or 10T complete suspended-load request or 16T complete suspended-load request or 20T complete suspended-load request. A low-headroom overhead crane is configured to increase useful hook travel within the available building height using a selected compact hoist arrangement. Also specified as a double girder bridge crane, this equipment can be configured for the work area and lifting task. Comparing the hook envelope and upper approach against measured roof and runway elevations helps buyers use the available lifting height. Common applications include machine shops and fabrication bays and equipment assembly and maintenance. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.
Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.
START WITH THE LOAD
A low-headroom overhead crane is configured to increase useful hook travel within the available building height using a selected compact hoist arrangement. Comparing the hook envelope and upper approach against measured roof and runway elevations helps buyers use the available lifting height. Typical applications include machine shops and fabrication bays, equipment assembly and maintenance, steel and material handling. Compare the proposed configuration with the actual load, reach, duty and site dimensions.
Provide runway rail elevation, roof and services, maximum equipment envelope and lowest obstructions.
State upper and lower hook positions, load and rigging height, trolley approach and transfer points.
Specify complete suspended mass, working duty, start frequency, selected hoist and motion speeds.
Saved supplier listing captured 2026-10-13; quantity tiers: 最低起订量: 1 set: US$10,500 per set. The listing does not establish a current, project-specific or delivered price. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price.
SEE THE EQUIPMENT
Review these low-headroom double girder overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.
01 / LOW-HEADROOM DOUBLE GIRDER OVERHEAD CRANE · 01Close view of a black hoist motor, cable and adjacent components on a workshop floor. Provide runway rail elevation, roof and services, maximum equipment envelope and lowest obstructions.
02 / LOW-HEADROOM DOUBLE GIRDER OVERHEAD CRANE · 02Close view of a black electric motor and its metal identification plate. State upper and lower hook positions, load and rigging height, trolley approach and transfer points.
03 / LOW-HEADROOM DOUBLE GIRDER OVERHEAD CRANE · 03Close view of a hoist wire-rope drum, frame and black motor housing. Specify complete suspended mass, working duty, start frequency, selected hoist and motion speeds.
Specify pendant, radio remote or cabin control only where listed for this model. Confirm operator sight lines, motion speeds, emergency stops and any backup controller in the quoted scope.
COMPARE THE COMPLETE PROPOSAL
Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.
Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.
SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE
Provide the layout and operating conditions to compare a low-headroom double girder overhead crane quotation against your actual project.
Discuss your siteHenan Mine Crane Group
Compare itemized quotations with the same equipment, delivery and site-service boundaries.
Confirm 3, 5, 10, 16 and 20 ton, selected mechanisms, control options and required accessories.
List rail or support work, power supply, clearances and purchaser-provided services.
State transport, unloading, erection, testing, commissioning and service parts included in the offer.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
The saved listing provides one price, not a range. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
A low-headroom overhead crane is configured to increase useful hook travel within the available building height using a selected compact hoist arrangement.
Available building height: Provide runway rail elevation, roof and services, maximum equipment envelope and lowest obstructions. Required hook travel: State upper and lower hook positions, load and rigging height, trolley approach and transfer points. Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.
US$10,500 per set is the saved supplier-listing reference, captured 2026-10-13. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price. Request a current quotation for the selected configuration, quantity, delivery and services.
Size the crane from the heaviest complete suspended load, including lifting attachments, and provide the work cycle. The selected structure, hoist and duty must match the project requirements.
Capacity, span, lifting height, hoist, duty and controls affect equipment selection. Runway, electrical supply, transport, installation and commissioning depend on the agreed project scope.