Runway and structural support
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Plan tundish lifting and service movements around the vessel’s actual load states, lifting frame and caster workpoints. Separate empty-vessel service from hot-process handling when defining the crane and protection package.

Red heavy bridge along a steelworks bay
Listed rated capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Application basis | Tundish and continuous-casting process handling; define the exact lifted item and process state. |
|---|---|
| Load states | Empty vessel, refractory/lining, covers or fixtures, contents and the suspended lifting frame as applicable. |
| Lifting interface | Connection centres, lifting frame/hook geometry, centre of gravity and allowable vessel orientation. |
| Caster workpoints | Pickup, preheat, caster transfer, service and emergency set-down positions. |
| Useful envelope | Hook extremes, approach dimensions, lifting-frame height and complete tundish clearance envelope. |
| Duty and exposure | Process timing, lifts, starts, heat sources, exposure duration and maintenance conditions. |
| Selected mechanisms | Main/auxiliary arrangement, motions, braking, limiting and controls matched to the nominated tasks. |
| Site scope | Wheel-reaction cases, runway/power interfaces, access and commissioning responsibilities. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.
State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, hoist or trolley, travel drives, controls and specified safety functions. |
| Runway and power feed | Rails, supporting steelwork, power-feed system and the allocation of building interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
Plan tundish lifting and service movements around the vessel’s actual load states, lifting frame and caster workpoints. Separate empty-vessel service from hot-process handling when defining the crane and protection package.
Tundish handling is defined by the vessel state and the route through the casting area. Empty maintenance lifting, a lined vessel with covers and a vessel carrying hot contents impose different suspended masses and operating conditions. The lifting frame and its connection dimensions are part of the same assessment.
A continuous-casting location does not by itself establish a molten-metal crane rating or a universal heat limit. The technical offer should identify the intended load cases, useful hook envelope, thermal provisions and operating sequence for this installation.
ENGINEERING SELECTION
Plan tundish lifting and service movements around the vessel’s actual load states, lifting frame and caster workpoints. Separate empty-vessel service from hot-process handling when defining the crane and protection package.
Record vessel, lining, cover, contents and lifting-frame masses for the actual moves. Identify which states involve hot metal.
Dimension transfer cars, preheating and service positions, overhead obstacles and emergency set-down space on the same layout.
Compare hooks, lifting frame, upper/lower positions and centre of gravity. Confirm the selected motion/control and protection package for those tasks.
EQUIPMENT AND INTERFACES
Photographs illustrate the archived equipment. The selected technical offer defines the supplied rating and arrangement.

Record vessel, lining, cover, contents and lifting-frame masses for the actual moves. Identify which states involve hot metal.

Dimension transfer cars, preheating and service positions, overhead obstacles and emergency set-down space on the same layout.

Compare hooks, lifting frame, upper/lower positions and centre of gravity. Confirm the selected motion/control and protection package for those tasks.
Henan Mine Crane Group
Tundish and continuous-casting process handling; define the exact lifted item and process state.
Identify support/rail or floor work, power feed, delivery, unloading, installation and commissioning responsibilities.
Compare offers for the same configuration, document revision, quantity, delivery term and site-service scope.
Henan Mine Crane Group
Record vessel, lining, cover, contents and lifting-frame masses for the actual moves. Identify which states involve hot metal.
Dimension transfer cars, preheating and service positions, overhead obstacles and emergency set-down space on the same layout.
Compare hooks, lifting frame, upper/lower positions and centre of gravity. Confirm the selected motion/control and protection package for those tasks.
Henan Mine Crane Group
Product and mechanism identities, rated load cases, dimensions, motions and the selected control/protection package.
General arrangement, lifting interface, site envelope and case-based support data matched to the same revision.
Agreed inspection/test plan, applicable equipment documents, operating instructions, service parts and allocated handover responsibilities.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
No. The complete suspended mass, centre of gravity, thermal exposure and permitted sequence can differ. They need separate load cases.
Connection centres, attachment heights, hook positions, overall envelope and the vessel/load geometry needed to review the intended orientation.
No. Hot-process service also requires review of duty, heat exposure, lifting interface, controls and the selected protective arrangement.