Runway and structural support
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Red double-girder bridge and green upper machinery in an open steel-framed bay
Listed rated capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Complete goods and attachment brief | State goods mass, dimensions, lifting points and attachment identity for every task. Give the complete suspended load in T, including lifting accessories. Describe pickup, transfer and placement conditions so the supplier can propose the relevant hoisting and connection arrangement. |
|---|---|
| Required hoisting arrangement | Describe the intended lifting function and ask the supplier to identify the proposed hoist/trolley or other selected package. Request its equipment drawing, model and rating. Keep alternatives clearly named; a general bridge reference does not define one universal hoisting mechanism. |
| Attachment supply boundary | Identify any existing attachment and its connection, power, control or site requirements. Ask whether a proposed attachment is included, optional or purchaser-provided. Obtain the selected arrangement and applicable operating conditions rather than assuming a special lifting attachment is included. |
| Rating and operating conditions | Request one selected crane rating and any distinct hook or mechanism ratings against the complete task brief. Separate hook tasks and permitted modes must be stated explicitly. Do not add paired values or assume joint operation, magnetic handling suitability or a particular 30T configuration. |
| Useful height and coverage | Provide rail-centre span and required useful hook travel in m, pickup/placement levels, goods envelope and attachment depth in mm. Request the selected hook/connection levels, approaches and upper envelope. Review the complete lifting arrangement with measured site obstructions. |
| Cycle, controls and site power | Describe load distribution, frequency, movements, positioning needs and operating hours. Provide voltage/frequency and relevant site conditions. Ask for selected crane/mechanism duty, operating devices and connection requirements; the task brief must determine the actual proposal. |
| Order configuration record | Require a coordinated equipment list, hoisting/attachment boundaries, selected rating and site outline under matching revisions. Record deviations, unanswered items and responsible reviewers. Agree checks, instructions and requested services explicitly in the offer before ordering. |
| Hook envelope | Required useful travel, upper and lower hook positions and top approach. |
| Available headroom | Rail elevation, roof beams, services and required equipment clearance. |
| Load and duty | Complete suspended load, load spectrum, cycle and lifts per shift. |
| Hoist arrangement | Selected low-headroom trolley or hoist, wheelbase and service clearance. |
| Runway and power | Rail centres, support loads, power feed, controls and installation boundary. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.
State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, hoist or trolley, travel drives, controls and specified safety functions. |
| Runway and power feed | Rails, supporting steelwork, power-feed system and the allocation of building interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
Low-Headroom Double Girder Overhead Crane. Listed rated load: 30 ton. A low-headroom overhead crane is configured to increase useful hook travel within the available building height using a selected compact hoist arrangement. Also specified as a double girder bridge crane, this equipment can be configured for the work area and lifting task. Comparing the hook envelope and upper approach against measured roof and runway elevations helps buyers use the available lifting height. Common applications include machine shops and fabrication bays and equipment assembly and maintenance. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.
Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.
START WITH THE LOAD
A low-headroom overhead crane is configured to increase useful hook travel within the available building height using a selected compact hoist arrangement. Comparing the hook envelope and upper approach against measured roof and runway elevations helps buyers use the available lifting height. Typical applications include machine shops and fabrication bays, equipment assembly and maintenance, steel and material handling. Compare the proposed configuration with the actual load, reach, duty and site dimensions.
Provide runway rail elevation, roof and services, maximum equipment envelope and lowest obstructions.
State upper and lower hook positions, load and rigging height, trolley approach and transfer points.
Specify complete suspended mass, working duty, start frequency, selected hoist and motion speeds.
Saved supplier listing captured 2026-10-13; quantity tiers: 最低起订量: 1 set: US$10,500 per set. The listing does not establish a current, project-specific or delivered price. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price.
SEE THE EQUIPMENT
Review these low-headroom double girder overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.
01 / LOW-HEADROOM DOUBLE GIRDER OVERHEAD CRANE · 01Red double-girder bridge and green upper machinery in an open steel-framed bay. Provide runway rail elevation, roof and services, maximum equipment envelope and lowest obstructions.
02 / LOW-HEADROOM DOUBLE GIRDER OVERHEAD CRANE · 02Electric hoist trolley with green drive units photographed on a red double-girder bridge. State upper and lower hook positions, load and rigging height, trolley approach and transfer points.
03 / LOW-HEADROOM DOUBLE GIRDER OVERHEAD CRANE · 03Yellow hoist bridge crane inside an assembly hall. Specify complete suspended mass, working duty, start frequency, selected hoist and motion speeds.
Specify pendant, radio remote or cabin control only where listed for this model. Confirm operator sight lines, motion speeds, emergency stops and any backup controller in the quoted scope.
COMPARE THE COMPLETE PROPOSAL
Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.
Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.
SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE
Provide the layout and operating conditions to compare a low-headroom double girder overhead crane quotation against your actual project.
Discuss your siteHenan Mine Crane Group
Compare itemized quotations with the same equipment, delivery and site-service boundaries.
Confirm 30 ton, selected mechanisms, control options and required accessories.
List rail or support work, power supply, clearances and purchaser-provided services.
State transport, unloading, erection, testing, commissioning and service parts included in the offer.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
The saved listing provides one price, not a range. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
A low-headroom overhead crane is configured to increase useful hook travel within the available building height using a selected compact hoist arrangement.
Available building height: Provide runway rail elevation, roof and services, maximum equipment envelope and lowest obstructions. Required hook travel: State upper and lower hook positions, load and rigging height, trolley approach and transfer points. Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.
US$10,500 per set is the saved supplier-listing reference, captured 2026-10-13. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price. Request a current quotation for the selected configuration, quantity, delivery and services.
Size the crane from the heaviest complete suspended load, including lifting attachments, and provide the work cycle. The selected structure, hoist and duty must match the project requirements.
Capacity, span, lifting height, hoist, duty and controls affect equipment selection. Runway, electrical supply, transport, installation and commissioning depend on the agreed project scope.