Overhead cranes / Engineering selection

3.2 ton European Double Girder Overhead Crane

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Equipment reference1601926759467Configured for your project
Technical offer defines final specification
PRODUCT CONFIGURATIONYellow overhead bridge cranes and hanging hooks across a bright workshop.

Yellow overhead bridge cranes and hanging hooks across a bright workshop

Selection at a glance
3.2tonnes

Listed rated capacity

Complete suspended loads
List the goods and every applicable attachment mass in T for each regular task. Identify frequent loads, occasional maximum loads and future process changes separately. Request the selected lifting arrangement and ratings against the complete load schedule; a title value alone does not define the working load.
Movement stages
Describe pickup, lifting, trolley travel, bridge travel and placement as separate operations. Give representative distances, starts, pauses and any approach requirement. Identify which mechanism performs each movement and keep unusual tasks distinct from normal production.
Frequency and operating time
Record lifts per shift, shifts per day, operating days and mechanism operating hours where available. Mark measured records and estimates. Request the supplier selection basis for each mechanism so duty comparisons use the same actual production information.
Selected lifting arrangement
Ask the offer to identify the selected hoisting mechanism, trolley arrangement, ratings and matching drawings. Keep hoist and winch alternatives separately named with their operating conditions.
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

3.2 ton European Double Girder Overhead Crane listed specifications
Complete suspended loadsList the goods and every applicable attachment mass in T for each regular task. Identify frequent loads, occasional maximum loads and future process changes separately. Request the selected lifting arrangement and ratings against the complete load schedule; a title value alone does not define the working load.
Movement stagesDescribe pickup, lifting, trolley travel, bridge travel and placement as separate operations. Give representative distances, starts, pauses and any approach requirement. Identify which mechanism performs each movement and keep unusual tasks distinct from normal production.
Frequency and operating timeRecord lifts per shift, shifts per day, operating days and mechanism operating hours where available. Mark measured records and estimates. Request the supplier selection basis for each mechanism so duty comparisons use the same actual production information.
Selected lifting arrangementAsk the offer to identify the selected hoisting mechanism, trolley arrangement, ratings and matching drawings. Keep hoist and winch alternatives separately named with their operating conditions.
Mechanism duty responseRequest separate crane and mechanism classifications with the underlying load and cycle basis. Compare hoisting, trolley and bridge travel against the same operating schedule and applicable classification standard.
Workshop and power inputsProvide measured runway rail-centre span and useful hook travel in m, local geometry in mm, actual voltage/frequency/phases and relevant exposure. Request selected outlines, reactions and connection records for the named site parties to review.
Selection record and conditionsCompare the selected identities, ratings, duties, speeds, stated operating conditions and open inputs under matching revisions. Ask for a revised response if the task cycle changes. Agree instructions, proposed checks, installation, training and spare scope as explicit included or separately quoted items.
Rated loadComplete suspended load including rigging and attachments; confirm each hook and combined load case.
Span and travelRunway rail-centre span, bridge travel, trolley travel and end approaches.
Useful lifting heightRequired upper and lower hook positions with the load and rigging.
Duty and motion speedsLoad spectrum, lifts per hour, shifts, starting frequency and selected lift/travel speeds.
Runway and powerSupport capacity, wheel reactions, rail geometry, voltage, frequency, phase and power-feed arrangement.

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Runway and structural support

Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.

Hook coverage and useful height

Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.

Duty, power and environment

State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Crane equipmentSelected bridge, hoist or trolley, travel drives, controls and specified safety functions.
Runway and power feedRails, supporting steelwork, power-feed system and the allocation of building interfaces.
Delivery and installationNamed delivery term, unloading, installation work, local labour and access equipment.
Acceptance and handoverInspection and test plan, records, documentation, training, spare parts and warranty terms.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

European Double Girder Overhead Crane. Listed rated load: 3.2 ton. An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. Also specified as a double girder bridge crane, this equipment can be configured for the work area and lifting task. A selected bridge, hoist and runway arrangement can serve pickup and set-down points across the workshop while keeping the floor route available for production. Common applications include machine shops and fabrication bays and equipment assembly and maintenance. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.

Equipment
European Double Girder Overhead Crane
Capacity / selection
3.2 ton
Application
machine shops and fabrication bays
Archived supplier-listing reference
US$14,800–15,000 / set

Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.

START WITH THE LOAD

Choose the Right European Double Girder Overhead Crane

An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. A selected bridge, hoist and runway arrangement can serve pickup and set-down points across the workshop while keeping the floor route available for production. Typical applications include machine shops and fabrication bays, equipment assembly and maintenance, steel and material handling. Compare the proposed configuration with the actual load, reach, duty and site dimensions.

Capacity and lifting duty

Include the load, slings, lifting beams and attachments. State the load spectrum, lifts per hour, shifts and required lifting and travel speeds.

Span, hook height and coverage

Provide runway rail centres, upper and lower hook positions, side and end approaches, workpoints and roof or service obstructions.

Runway, power and supply scope

Share support drawings and site voltage, frequency and phase. Itemize the crane, rails, moving power feed, installation, testing and commissioning.

Saved supplier listing captured 2026-10-13; quantity tiers: 1-2 sets: US$15,000 per set · ≥3 sets: US$14,800 per set. The listing does not establish a current, project-specific or delivered price. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price.

SEE THE EQUIPMENT

European Double Girder Overhead Crane Features

Review these european double girder overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.

Yellow overhead bridge cranes and hanging hooks across a bright workshop.01 / EUROPEAN DOUBLE GIRDER OVERHEAD CRANE · 01

Capacity and lifting duty

Yellow overhead bridge cranes and hanging hooks across a bright workshop.

Yellow overhead bridge spanning a steel-roof workshop with rails and support columns visible.02 / EUROPEAN DOUBLE GIRDER OVERHEAD CRANE · 02

Span, hook height and coverage

Yellow overhead bridge spanning a steel-roof workshop with rails and support columns visible.

Yellow double-girder bridge viewed from below with a side access platform in a workshop.03 / EUROPEAN DOUBLE GIRDER OVERHEAD CRANE · 03

Runway, power and supply scope

Yellow double-girder bridge viewed from below with a side access platform in a workshop.

Choose Crane Controls for the Work Area

Specify pendant, radio remote or cabin control only where listed for this model. Confirm operator sight lines, motion speeds, emergency stops and any backup controller in the quoted scope.

COMPARE THE COMPLETE PROPOSAL

Define your supply package.

Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.

EQUIPMENT PACKAGE

Selected European Double Girder Overhead Crane

  • Rated load or task: 3.2 ton
SITE INTERFACES

Power, support & layout

  • Confirm support, power, clearances and purchaser-provided work in the offer.
  • Separate equipment price, delivery and site services for comparison.
DELIVERY & SERVICE

Order & installation scope

  • State transport, unloading and erection access.
  • List agreed testing, commissioning, manuals and operator handover.
  • Confirm maintenance access, wear parts and service support requested.

Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.

SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE

Specify Your European Double Girder Overhead Crane

Provide the layout and operating conditions to compare a european double girder overhead crane quotation against your actual project.

Discuss your site

Henan Mine Crane Group

European Double Girder Overhead Crane Supply Scope

Compare itemized quotations with the same equipment, delivery and site-service boundaries.

Crane equipment

Confirm 3.2 ton, selected mechanisms, control options and required accessories.

Site interfaces

List rail or support work, power supply, clearances and purchaser-provided services.

Delivery & installation

State transport, unloading, erection, testing, commissioning and service parts included in the offer.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Archived supplier-listing price rangeUS$14,800–15,000per set · MOQ 1 set

Range combines the price tiers shown in the saved listing. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 1-2 setsUS$15,000 / set
  • ≥3 setsUS$14,800 / set

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

What is a european double girder overhead crane?

An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder.

What information is needed to quote a european double girder overhead crane?

Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.

How much does a european double girder overhead crane cost?

US$14,800–15,000 per set is the saved supplier-listing reference, captured 2026-10-13. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price. Request a current quotation for the selected configuration, quantity, delivery and services.

Which capacity should I choose for an overhead crane?

Size the crane from the heaviest complete suspended load, including lifting attachments, and provide the work cycle. The selected structure, hoist and duty must match the project requirements.

What affects an overhead crane quotation?

Capacity, span, lifting height, hoist, duty and controls affect equipment selection. Runway, electrical supply, transport, installation and commissioning depend on the agreed project scope.

3.2 tonOverhead cranes
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…