Load path and rope arrangement
Describe whether the duty is lifting or pulling. Provide reeving, sheave positions, line angles, required rope length and the load cases over the full route.
Select a motor-driven drum winch by required line pull, working rope length, drum layer and duty. Pulling and suspended lifting are different applications; the selected brake, reeving and controls need to match the task.

Blue electric winch assemblies with wire-rope drums, motors and control equipment in a workshop.
Listed load / pulling requirement
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Equipment family | JM / JK electric motor, reduction gearing and wire-rope drum. |
|---|---|
| Force rating | State line pull in kN and the reference drum layer; distinguish force from the mass of a suspended load. |
| Speed rating | Line speed at the stated drum layer, paired with the selected line pull and drive. |
| Rope selection | Wire-rope diameter, construction, length, reeving and compatible drum/sheave geometry. |
| Usable rope storage | Working travel plus reeving and retained wraps; quote usable storage rather than only nominal drum capacity. |
| Brake and application | Pulling, positioning or engineered lifting duty, with the selected holding/stopping arrangement. |
| Mounting and rope lead | Base/fixing layout, foundation reactions, rope exit direction and lead-sheave position. |
| Electrical and cycle | Voltage, phase, frequency, starting method, starts per hour and load/time cycle. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Describe whether the duty is lifting or pulling. Provide reeving, sheave positions, line angles, required rope length and the load cases over the full route.
Provide the installation layout, supporting structure and available space. Confirm mounting reactions, drum access, guarding and drive requirements.
State operating cycle, line speed, starts, hold requirements, power supply and control method. Agree the applicable braking and protection functions in the technical offer.
| Work package | Agree in the quotation |
|---|---|
| Winch equipment | Selected drum, rope storage, drive, braking arrangement and controls as specified. |
| Installation interfaces | Supports, anchorage, rope route, sheaves or reeving equipment and power supply. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Define the lifting or pulling task, line force, rope length, speed and mounting interfaces before selecting the winch arrangement.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
A drum winch develops tension in a wire rope. Its line pull should be stated at a defined rope layer because the effective drum radius changes as the rope builds up. The required working travel, retained wraps and reeving allowance also affect usable rope capacity.
JM / JK identifies a winch family, not one universal lifting rating. The application determines whether the package is for horizontal pulling, inclined positioning or an engineered suspended-lifting system. A technical schedule should pair line pull, speed, rope layer, brake arrangement and foundation loads.
ENGINEERING SELECTION
For unit comparison only, 10 kN is approximately 1.02 tonne-force under standard gravity. It does not describe a 10 t lifting appliance.
Show the load, any slope or resistance, reeving, sheaves and rope lead. Mechanical advantage introduces additional rope travel and losses that belong in the system assessment.
Record the needed working travel and minimum retained wraps. As the drum fills, review the resulting line speed, available pull and rope fleet geometry.
EQUIPMENT AND INTERFACES
Photographs illustrate the archived equipment. The selected technical offer defines the supplied rating and arrangement.



Henan Mine Crane Group
JM / JK electric motor, reduction gearing and wire-rope drum.
Identify support/rail or floor work, power feed, delivery, unloading, installation and commissioning responsibilities.
Compare offers for the same configuration, document revision, quantity, delivery term and site-service scope.
Henan Mine Crane Group
Product and mechanism identities, rated load cases, dimensions, motions and the selected control/protection package.
General arrangement, lifting interface, site envelope and case-based support data matched to the same revision.
Agreed inspection/test plan, applicable equipment documents, operating instructions, service parts and allocated handover responsibilities.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-11. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Show the complete load path, rope route, sheaves, mounting arrangement, line angles and required rope storage. Identify lifting or pulling duty.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
No. 10 kN is approximately 1.02 tonne-force under standard gravity. A suspended-lifting system needs its own rated arrangement and design basis.
The effective drum radius changes with rope build-up. Line pull and line speed therefore need a defined reference layer.
No. Marine exposure, mounting, control and any required classification need to be specified for the particular service.