Overhead cranes / Engineering selection

LDC Single Girder Overhead Crane: VFD Motion Schedule

Specify variable-frequency drive requirements separately for hoisting, trolley and bridge travel. Link each motion to the load, workpoints, operating cycle and site electrical supply.

Equipment reference1601805369300Configured for your project
Technical offer defines final specification
CRANE-FAMILY REFERENCECompact hoist and trolley beneath a yellow single girder, with hanging ropes and cables

Upward view of a compact hoist and trolley beneath a yellow girder. Family reference photograph; specify the selected hoist rating, speed range and drive arrangement in the motion schedule.

Selection at a glance
1, 2, 3, 5, 10, 16 and 20 ton

Listed family options; selected configuration to be agreed

Arrangement
LDC single girder / box beam
Drive scope
Hoist, trolley and bridge separately
Workpoints
Span, travel and hook positions
Offer basis
Motion and duty schedule
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

LDC Single Girder Overhead Crane: VFD Motion Schedule listed specifications
Rating options1 / 2 / 3 / 5 / 10 / 16 / 20 t listed; select from complete suspended load
Bridge arrangementLDC single-girder box-beam family; selected bridge and hoist arrangement agreed
Span reference10.5–31.5 m listed; selected span and hook coverage defined by project drawing
Hook travelRequired upper/lower hook positions, rigging allowance and obstructions supplied
Duty basisA5 listed for crane family; structure and mechanism classes verified against load cycle
Hoisting scheduleSelected hoist rating, speeds, drive method, brakes and limits specified separately
Travel scheduleTrolley and bridge speeds, drive method, acceleration, stopping and limits stated for each motion
Electrical and controlsSite voltage, phases, frequency, operator controls and feed responsibilities agreed
Handover packageSelected drive references, wiring, parameter backup, manuals and commissioning scope agreed

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Load route and hook positions

Show the complete suspended load, lifting attachments, pickup and set-down points, required upper/lower hook positions, side/end approaches and obstructions. Use these workpoints to define the motion requirements.

Operating cycle and control functions

State load spectrum, lifts per hour, starts, working shifts, travel distances and required speeds. Agree the proposed drive method, acceleration, stopping, limits and operator functions for each motion; list structure and mechanism duty separately.

Runway and electrical interface

Provide rail/support drawings, rail-top level and site voltage, phases and frequency. Request the selected wheel reactions and interface dimensions. Allocate the moving feed, isolation, cable route, installation and operating environment.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Crane and motion drivesSelected bridge, hoist, trolley and travel drives, controls and agreed safety functions itemized.
Runway and electrical feedRails, supports, moving power feed, isolation, cable routes and connection responsibilities allocated.
Delivery and site servicesDelivery term, unloading, erection, electrical work, commissioning and purchaser inputs listed.
Documents and handoverSelected drive schedule, wiring, parameter backup, agreed inspection/test records, manuals and spares identified.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Map the pickup and set-down positions, travel distances and operating cycle before selecting speeds and control functions for each motion.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

For an LDC single-girder crane enquiry, define hoisting, trolley travel and bridge travel separately. State the load, workpoints, operating cycle and required speeds, then compare how each motion is driven and controlled. A motion schedule makes the proposed variable-frequency drive scope, operator functions and electrical interfaces clear before ordering.

Equipment family
LDC single-girder box-beam overhead crane
Selection focus
Separate hoisting, trolley and bridge drive requirements
Offer comparison
One motion schedule linked to the layout and operating cycle

Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.

SPECIFY EACH MOTION

Make the drive scope visible in the offer

A reference to VFD control does not identify which motions use it. Ask for a separate line for hoisting, trolley travel and bridge travel, with the proposed drive method and operating requirements for each.

Hoisting

State the complete suspended load, hook travel, required lifting and positioning speeds, load spectrum and starts. Ask the supplier to identify the hoist motor, drive method, braking arrangement and limits for that duty.

Trolley travel

Show the pickup and set-down positions across the bay, side approaches and obstructions. Specify the travel and positioning speeds and ask for acceleration, stopping and end-limit functions in the selected proposal.

Bridge travel

Provide the runway travel length, rail and support arrangement, stops and workpoints. Ask how the travel drives are coordinated and how the moving electrical feed interfaces with the building supply.

READ THE ARRANGEMENT

Hoist, workshop and moving-service references

These photographs show family equipment arrangements. They do not identify an inverter model or prove that all motions use variable-frequency control.

Compact hoist and trolley beneath a yellow single girder, with hanging ropes and cables01 / FAMILY REFERENCE

Hoist and trolley arrangement

Upward view of a compact hoist and trolley beneath a yellow girder. Family reference photograph; specify the selected hoist rating, speed range and drive arrangement in the motion schedule.

Rows of yellow single-girder bridges above machinery in a steel-roof workshop02 / FAMILY REFERENCE

Bridge travel through the workshop

Workshop overview with several yellow bridges and machine tools. Family reference photograph; use the project layout to define bridge travel, hook coverage and the power-feed route.

Upward view of a yellow single girder, compact hoist and trailing service cables03 / FAMILY REFERENCE

Cable route and access

Girder and hoist viewed from below with trailing cables and a hanging hook. Family reference photograph; confirm the selected trolley envelope, cable arrangement and maintenance access.

DEFINE THE ELECTRICAL BOUNDARY

Allocate the control panel and site connections

Identify the selected drives, panel, operator controls, moving feed, isolation and connection work. State site voltage, phases, frequency, cable route and operating environment. Separate equipment supply from installation, commissioning and any purchaser-provided electrical work; the Supply scope tab gives the allocation checklist.

SET THE WORKPOINTS

Match the motion schedule to the building layout

Mark rail centres and rail-top levels, required upper and lower hook positions, side and end approaches, machines, columns and service obstructions. Provide runway and support drawings for review of the selected wheel reactions and interface dimensions.

Discuss your motion and layout requirements

AGREE THE HANDOVER

Request documents for the selected drive package

List the agreed equipment and drive schedule, wiring diagrams, parameter backup, operating instructions, maintenance information and spare-part references. Define factory and site checks, commissioning responsibilities and operator handover in the order documents. Any positioning or stopping acceptance criteria need their own agreed method and conditions.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Archived supplier-listing price rangeUS$7,000–7,300per set · MOQ 1 set

Range combines the price tiers shown in the saved listing. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 1 setUS$7,300 / set
  • ≥2 setsUS$7,000 / set

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Mark the runway, span, hook positions, travel distances, columns and obstructions. Add the load cycle, required speeds, site electrical supply and proposed feed route; identify the requested motion-control functions.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

Does VFD control apply to every crane motion?

The term alone does not define the scope. Ask the supplier to state the drive method separately for hoisting, trolley travel and bridge travel, with the selected motor, controller and operating functions for each.

What belongs in a crane motion schedule?

List the required load and workpoints, motion travel, speed range, operating cycle, proposed drive method, acceleration, braking, limits and operator controls. Link the schedule to the equipment drawing and agree any acceptance criteria.

How should lifting and positioning speeds be selected?

Start with the load, hook travel, positioning task, lifts per hour and working shifts. Have the supplier identify speeds for the selected rated hoist and duty; several listed speed variants do not establish one configuration.

Which electrical details should the quotation identify?

State site voltage, phases, frequency and operating environment. Allocate the panel, selected drives, operator controls, isolation, moving feed, cable routes, connection work and commissioning. Request the wiring and parameter backup included in the handover.

Is US$7,000–7,300 the installed price of the selected crane?

The supplier-listing reference captured 2026-10-13 shows US$7,300 for one set and US$7,000 per set for at least two sets. It does not establish a current or installed project price. Request an itemized offer for the selected load, dimensions, drive package, delivery and site services.

1, 2, 3, 5, 10, 16 and 20 tonOverhead cranes
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…