Overhead cranes / Engineering selection

European Double Girder Overhead Crane

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Equipment reference1601709233749Configured for your project
Technical offer defines final specification
PRODUCT CONFIGURATIONYellow double-girder overhead cranes marked 32+32t along a steel-framed workshop.

Yellow double-girder overhead cranes marked 32+32t along a steel-framed workshop

Selection at a glance
40, 80, 100 and 50 ton

Listed rated capacity

Workpoints and workshop survey
Mark actual pickup/placement points, runway references, roof members and adjacent equipment. Give local offsets and goods/attachment geometry in mm. Identify the survey datum and revision so selected outlines and useful hook positions can be compared against the same workshop information.
Selected electric hoist and trolley
Request the actual electric-hoist and trolley models, selected ratings, suspension/mounting arrangement and matching drawings. Keep proposed traditional and compact alternatives separately identified. A European title or a low-headroom description does not choose the supplied hoist or establish installed clearances.
Useful hook space and approaches
Provide required useful hook travel in m and workpoint levels/load envelopes in mm. Request selected upper/lower hook extremes, depth and approach dimensions with the overall outline. Distinguish hook travel and load clearance from crane height; nominal lifting height alone does not establish usable space at every workpoint.
Service-space requirements
Ask for the selected hoist/trolley service envelopes, component-access needs and relevant equipment/document references. Identify surrounding obstructions and the proposed site access provisions. The supplier and responsible site parties should coordinate these records; a walkway shown in a photograph is not an agreed access design or work method.
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

European Double Girder Overhead Crane listed specifications
Workpoints and workshop surveyMark actual pickup/placement points, runway references, roof members and adjacent equipment. Give local offsets and goods/attachment geometry in mm. Identify the survey datum and revision so selected outlines and useful hook positions can be compared against the same workshop information.
Selected electric hoist and trolleyRequest the actual electric-hoist and trolley models, selected ratings, suspension/mounting arrangement and matching drawings. Keep proposed traditional and compact alternatives separately identified. A European title or a low-headroom description does not choose the supplied hoist or establish installed clearances.
Useful hook space and approachesProvide required useful hook travel in m and workpoint levels/load envelopes in mm. Request selected upper/lower hook extremes, depth and approach dimensions with the overall outline. Distinguish hook travel and load clearance from crane height; nominal lifting height alone does not establish usable space at every workpoint.
Service-space requirementsAsk for the selected hoist/trolley service envelopes, component-access needs and relevant equipment/document references. Identify surrounding obstructions and the proposed site access provisions. The supplier and responsible site parties should coordinate these records; a walkway shown in a photograph is not an agreed access design or work method.
Complete loads and operating cycleList goods and suspended attachment masses in T, frequency, representative movements and shifts. Describe unusual tasks separately. Request selected crane/hoist ratings, duty and speeds for that operating record; broad capacity and application lists do not establish suitability for every workshop process.
Runway, reactions and power interfacesGive measured runway rail-centre span, support/survey records and actual incoming voltage, frequency and phases. Request selected wheel reactions, outlines and connection/service interfaces. Low self-weight wording does not establish that an existing light workshop or runway can accept the proposed equipment.
Coordinated access and document packageCompare selected hoist/trolley identities, useful-space response and service interfaces under matching revisions. Agree providers for site access, runway/support review, power and installation work. Request instructions, spare references, proposed checks and any training/support as explicitly included or quoted items.
Rated loadComplete suspended load including rigging and attachments; confirm each hook and combined load case.
Span and travelRunway rail-centre span, bridge travel, trolley travel and end approaches.
Useful lifting heightRequired upper and lower hook positions with the load and rigging.
Duty and motion speedsLoad spectrum, lifts per hour, shifts, starting frequency and selected lift/travel speeds.
Runway and powerSupport capacity, wheel reactions, rail geometry, voltage, frequency, phase and power-feed arrangement.

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Runway and structural support

Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.

Hook coverage and useful height

Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.

Duty, power and environment

State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Crane equipmentSelected bridge, hoist or trolley, travel drives, controls and specified safety functions.
Runway and power feedRails, supporting steelwork, power-feed system and the allocation of building interfaces.
Delivery and installationNamed delivery term, unloading, installation work, local labour and access equipment.
Acceptance and handoverInspection and test plan, records, documentation, training, spare parts and warranty terms.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

European Double Girder Overhead Crane. Listed rated load: 40, 80, 100 and 50 ton. An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. Also specified as a double girder bridge crane, this equipment can be configured for the work area and lifting task. A selected bridge, hoist and runway arrangement can serve pickup and set-down points across the workshop while keeping the floor route available for production. Common applications include machine shops and fabrication bays and equipment assembly and maintenance. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.

Equipment
European Double Girder Overhead Crane
Capacity / selection
40, 80, 100 and 50 ton
Application
machine shops and fabrication bays
Archived supplier-listing reference
US$9,000–9,560 / set

Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.

START WITH THE LOAD

Choose the Right European Double Girder Overhead Crane

An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. A selected bridge, hoist and runway arrangement can serve pickup and set-down points across the workshop while keeping the floor route available for production. Typical applications include machine shops and fabrication bays, equipment assembly and maintenance, steel and material handling. Compare the proposed configuration with the actual load, reach, duty and site dimensions.

Capacity and lifting duty

Include the load, slings, lifting beams and attachments. State the load spectrum, lifts per hour, shifts and required lifting and travel speeds.

Span, hook height and coverage

Provide runway rail centres, upper and lower hook positions, side and end approaches, workpoints and roof or service obstructions.

Runway, power and supply scope

Share support drawings and site voltage, frequency and phase. Itemize the crane, rails, moving power feed, installation, testing and commissioning.

Saved supplier listing captured 2026-10-13; quantity tiers: 1-4 sets: US$9,560 per set · 5-9 sets: US$9,300 per set · ≥10 sets: US$9,000 per set. The listing does not establish a current, project-specific or delivered price. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price.

SEE THE EQUIPMENT

European Double Girder Overhead Crane Features

Review these european double girder overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.

Yellow double-girder overhead cranes marked 32+32t along a steel-framed workshop.01 / EUROPEAN DOUBLE GIRDER OVERHEAD CRANE · 01

Capacity and lifting duty

Yellow double-girder overhead cranes marked 32+32t along a steel-framed workshop.

Yellow bridge girders and trolley viewed from below.02 / EUROPEAN DOUBLE GIRDER OVERHEAD CRANE · 02

Span, hook height and coverage

Yellow bridge girders and trolley viewed from below.

Upward view between yellow double girders showing hoist assemblies and rope paths.03 / EUROPEAN DOUBLE GIRDER OVERHEAD CRANE · 03

Runway, power and supply scope

Upward view between yellow double girders showing hoist assemblies and rope paths.

Choose Crane Controls for the Work Area

Specify pendant, radio remote or cabin control only where listed for this model. Confirm operator sight lines, motion speeds, emergency stops and any backup controller in the quoted scope.

COMPARE THE COMPLETE PROPOSAL

Define your supply package.

Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.

EQUIPMENT PACKAGE

Selected European Double Girder Overhead Crane

  • Rated load or task: 40, 80, 100 and 50 ton
SITE INTERFACES

Power, support & layout

  • Confirm support, power, clearances and purchaser-provided work in the offer.
  • Separate equipment price, delivery and site services for comparison.
DELIVERY & SERVICE

Order & installation scope

  • State transport, unloading and erection access.
  • List agreed testing, commissioning, manuals and operator handover.
  • Confirm maintenance access, wear parts and service support requested.

Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.

SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE

Specify Your European Double Girder Overhead Crane

Provide the layout and operating conditions to compare a european double girder overhead crane quotation against your actual project.

Discuss your site

Henan Mine Crane Group

European Double Girder Overhead Crane Supply Scope

Compare itemized quotations with the same equipment, delivery and site-service boundaries.

Crane equipment

Confirm 40, 80, 100 and 50 ton, selected mechanisms, control options and required accessories.

Site interfaces

List rail or support work, power supply, clearances and purchaser-provided services.

Delivery & installation

State transport, unloading, erection, testing, commissioning and service parts included in the offer.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Archived supplier-listing price rangeUS$9,000–9,560per set · MOQ 1 set

Range combines the price tiers shown in the saved listing. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 1-4 setsUS$9,560 / set
  • 5-9 setsUS$9,300 / set
  • ≥10 setsUS$9,000 / set

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

What is a european double girder overhead crane?

An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder.

What information is needed to quote a european double girder overhead crane?

Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.

How much does a european double girder overhead crane cost?

US$9,000–9,560 per set is the saved supplier-listing reference, captured 2026-10-13. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price. Request a current quotation for the selected configuration, quantity, delivery and services.

Which capacity should I choose for an overhead crane?

Size the crane from the heaviest complete suspended load, including lifting attachments, and provide the work cycle. The selected structure, hoist and duty must match the project requirements.

What affects an overhead crane quotation?

Capacity, span, lifting height, hoist, duty and controls affect equipment selection. Runway, electrical supply, transport, installation and commissioning depend on the agreed project scope.

40, 80, 100 and 50 tonOverhead cranes
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…