Runway and structural support
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Hoist trolley between the bridge girders
Listed rated capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Replacement handling requirements | Describe the work requested from the proposed replacement crane, including goods, attachment, complete suspended mass in T and handling frequency. State runway rail-centre span and useful hook travel in m, with detailed work-position dimensions in mm. Identify any change in the handling task that the supplier must consider. |
|---|---|
| Existing equipment identity and documents | Provide the existing crane, hoist and relevant equipment identities, available nameplates, drawings and document revisions. Identify the origin and date of the records and the site contact who can answer questions. Ask the supplier and appointed reviewers which further information they require for the proposed replacement interfaces. |
| Retained runway and building survey | Identify the runway and building interfaces you want the project team to assess for retention. Supply available drawings and the actual survey references, levels and geometry in mm. Assign the responsible runway and building reviewers and ask them to state the selected new crane information required for their assessment. |
| Selected new crane outline and reactions | Request the proposed crane and trolley outline, wheel arrangement, relevant rail interfaces and reaction information with configuration and drawing references. Ask the supplier to identify any additional site data it needs. Send the selected information to the responsible designers for their review of the proposed retained interfaces. |
| Existing supply and electrical interfaces | Provide the available voltage, phases and frequency and identify the existing supply and connection references. Send the relevant site electrical records and name the responsible reviewer. Ask for the proposed new crane’s incoming requirements, feed and control interfaces and the external electrical work to be assessed by the site parties. |
| Replacement supply and external project work | List the crane equipment the supplier is expected to quote and the existing items proposed for further review. Identify the parties responsible for surveys, design assessment, existing-equipment work and site services. Request their information needs and proposed scope boundaries as part of the replacement project agreement. |
| Review outcomes and equipment changes | Keep the existing-site references, selected new equipment data and assigned review responses in one project record. Identify open information and the party responsible for resolving it. If the task or a retained interface changes, request an updated supplier proposal and the corresponding review from the affected designers or site providers. |
| Hook envelope | Required useful travel, upper and lower hook positions and top approach. |
| Available headroom | Rail elevation, roof beams, services and required equipment clearance. |
| Load and duty | Complete suspended load, load spectrum, cycle and lifts per shift. |
| Hoist arrangement | Selected low-headroom trolley or hoist, wheelbase and service clearance. |
| Runway and power | Rail centres, support loads, power feed, controls and installation boundary. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.
State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, hoist or trolley, travel drives, controls and specified safety functions. |
| Runway and power feed | Rails, supporting steelwork, power-feed system and the allocation of building interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
Low-Headroom Double Girder Overhead Crane. Available rated-load options: 3T complete suspended-load request or 5T complete suspended-load request or 10T complete suspended-load request or 16T complete suspended-load request or 20T complete suspended-load request. A low-headroom overhead crane is configured to increase useful hook travel within the available building height using a selected compact hoist arrangement. Also specified as a double girder bridge crane, this equipment can be configured for the work area and lifting task. Comparing the hook envelope and upper approach against measured roof and runway elevations helps buyers use the available lifting height. Common applications include machine shops and fabrication bays and equipment assembly and maintenance. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.
Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.
START WITH THE LOAD
A low-headroom overhead crane is configured to increase useful hook travel within the available building height using a selected compact hoist arrangement. Comparing the hook envelope and upper approach against measured roof and runway elevations helps buyers use the available lifting height. Typical applications include machine shops and fabrication bays, equipment assembly and maintenance, steel and material handling. Compare the proposed configuration with the actual load, reach, duty and site dimensions.
Provide runway rail elevation, roof and services, maximum equipment envelope and lowest obstructions.
State upper and lower hook positions, load and rigging height, trolley approach and transfer points.
Specify complete suspended mass, working duty, start frequency, selected hoist and motion speeds.
Saved supplier listing captured 2026-10-13; quantity tiers: 最低起订量: 1 set: US$10,500 per set. The listing does not establish a current, project-specific or delivered price. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price.
SEE THE EQUIPMENT
Review these low-headroom double girder overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.
01 / LOW-HEADROOM DOUBLE GIRDER OVERHEAD CRANE · 01Electric hoist trolley photographed from below between two yellow bridge girders inside a workshop. Provide runway rail elevation, roof and services, maximum equipment envelope and lowest obstructions.
02 / LOW-HEADROOM DOUBLE GIRDER OVERHEAD CRANE · 02Red bridge girders with green upper machinery, cable loops and hanging hook gear in an open steel bay. State upper and lower hook positions, load and rigging height, trolley approach and transfer points.
03 / LOW-HEADROOM DOUBLE GIRDER OVERHEAD CRANE · 03Yellow double-girder bridge with blue upper machinery and hanging hooks in a concrete-walled bay. Specify complete suspended mass, working duty, start frequency, selected hoist and motion speeds.
Specify pendant, radio remote or cabin control only where listed for this model. Confirm operator sight lines, motion speeds, emergency stops and any backup controller in the quoted scope.
COMPARE THE COMPLETE PROPOSAL
Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.
Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.
SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE
Provide the layout and operating conditions to compare a low-headroom double girder overhead crane quotation against your actual project.
Discuss your siteHenan Mine Crane Group
Compare itemized quotations with the same equipment, delivery and site-service boundaries.
Confirm 3, 5, 10, 16 and 20 ton, selected mechanisms, control options and required accessories.
List rail or support work, power supply, clearances and purchaser-provided services.
State transport, unloading, erection, testing, commissioning and service parts included in the offer.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
The saved listing provides one price, not a range. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
A low-headroom overhead crane is configured to increase useful hook travel within the available building height using a selected compact hoist arrangement.
Available building height: Provide runway rail elevation, roof and services, maximum equipment envelope and lowest obstructions. Required hook travel: State upper and lower hook positions, load and rigging height, trolley approach and transfer points. Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.
US$10,500 per set is the saved supplier-listing reference, captured 2026-10-13. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price. Request a current quotation for the selected configuration, quantity, delivery and services.
Size the crane from the heaviest complete suspended load, including lifting attachments, and provide the work cycle. The selected structure, hoist and duty must match the project requirements.
Capacity, span, lifting height, hoist, duty and controls affect equipment selection. Runway, electrical supply, transport, installation and commissioning depend on the agreed project scope.