Runway and structural support
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Review furnace feeding as a complete load route, from pickup through the furnace interface to return or set-down. Match the selected hook arrangement to the charge container, opening method and required clearance.

Bridge cranes along a production hall
Listed rated capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Process basis | Furnace charging/feeding; identify the charge material, vessel and intended operating sequence. |
|---|---|
| Complete lifting load | Charge container tare, contents and suspended attachments for each lift state. |
| Secondary task | Container opening, tipping or other auxiliary handling defined independently where required. |
| Furnace interface | Opening geometry, approach, hook levels and full container envelope throughout the operation. |
| Route and standby | Pickup, travel, furnace delivery, return, standby and emergency set-down positions. |
| Duty/exposure | Charging cycles, starts, shifts, radiant heat, short exposure events and dust. |
| Selected crane package | Lifting devices, motion/control schedule, braking, limiting and thermal provisions for the stated task. |
| Site/scope interfaces | Runway reactions, rail/support geometry, power feed, access, installation and acceptance allocation. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.
State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, hoist or trolley, travel drives, controls and specified safety functions. |
| Runway and power feed | Rails, supporting steelwork, power-feed system and the allocation of building interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
Review furnace feeding as a complete load route, from pickup through the furnace interface to return or set-down. Match the selected hook arrangement to the charge container, opening method and required clearance.
Furnace charging can involve solid charge containers, an opening or tipping task, or a separately specified hot-metal process. These duties need to be identified explicitly because their lifting interfaces, load states and thermal exposure differ.
Useful hook coverage must include the complete container envelope at the furnace interface. Pickup and return positions, the opening/tipping movement and the available standby or emergency set-down area should be reviewed on the same route drawing.
ENGINEERING SELECTION
Review furnace feeding as a complete load route, from pickup through the furnace interface to return or set-down. Match the selected hook arrangement to the charge container, opening method and required clearance.
Record tare, contents, lifting points and any lid or opening device. Separate the main suspended load from a secondary opening or tipping task.
Show the opening, approach direction, required hook positions and the clearance of the full container through the operating sequence.
Include the empty return move, waiting positions and emergency set-down space. Review thermal exposure and process timing along the complete cycle.
EQUIPMENT AND INTERFACES
Photographs illustrate the archived equipment. The selected technical offer defines the supplied rating and arrangement.

Record tare, contents, lifting points and any lid or opening device. Separate the main suspended load from a secondary opening or tipping task.

Show the opening, approach direction, required hook positions and the clearance of the full container through the operating sequence.

Include the empty return move, waiting positions and emergency set-down space. Review thermal exposure and process timing along the complete cycle.
Henan Mine Crane Group
Furnace charging/feeding; identify the charge material, vessel and intended operating sequence.
Identify support/rail or floor work, power feed, delivery, unloading, installation and commissioning responsibilities.
Compare offers for the same configuration, document revision, quantity, delivery term and site-service scope.
Henan Mine Crane Group
Record tare, contents, lifting points and any lid or opening device. Separate the main suspended load from a secondary opening or tipping task.
Show the opening, approach direction, required hook positions and the clearance of the full container through the operating sequence.
Include the empty return move, waiting positions and emergency set-down space. Review thermal exposure and process timing along the complete cycle.
Henan Mine Crane Group
Product and mechanism identities, rated load cases, dimensions, motions and the selected control/protection package.
General arrangement, lifting interface, site envelope and case-based support data matched to the same revision.
Agreed inspection/test plan, applicable equipment documents, operating instructions, service parts and allocated handover responsibilities.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
No. Identify whether the task involves solid charge containers, hot materials or molten metal. The selected crane package must match the actual service.
No. Define the auxiliary opening, tipping or handling task and its separate rated load case and permitted interaction.
It can involve different orientations, opening devices and clearances. It belongs in the same envelope and operating-sequence review.