Skip to products

The Henan Mine Crane Group product range

LH series

Explore lh series. Define the complete lifted load, runway span, useful hook travel and operating cycle. Compare the bridge and hoisting arrangement with your building layout and agree the runway, power and installation scope.

Try a starting point:5 tonneLD seriesGantry crane

LH series

14 products

Yellow bridge cranes above a crowded fabrication workshop5 and 20 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
5 and 20 ton
Model / arrangement
LH
Span / coverage
10.5, 13.5, 16.5, 19.5, 22.5, 25.5, 28.5 or 31.5 m; confirm selected geometry
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder bridge inside a bright hall.5, 10 and 20 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
5, 10 and 20 ton
Model / arrangement
LH
Span / coverage
12-30 m; confirm selected rail centres, trolley approaches and runway length
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder bridge with blue upper machinery and hook in a concrete-walled bay20 and 30 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
20 and 30 ton
Model / arrangement
LH
Span / coverage
10.5-30 m family reference; verify measured rail centres, selected bridge/end-carriage geometry and useful hook approaches
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow heavy double-girder overhead crane marked 400/100t with a suspended test load inside a factory15 and 20 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
15 and 20 ton
Model / arrangement
LH
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder bridge crane above red fabrication equipment.5, 16 and 20 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
5, 16 and 20 ton
Model / arrangement
LH
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder bridge in an assembly hall.10 and 25 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
10 and 25 ton
Model / arrangement
LH
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder bridge with blue upper machinery and hook in a concrete-walled bay8, 12 and 20 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
8, 12 and 20 ton
Model / arrangement
LH
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Electric hoist trolley with green drive units photographed on a red double-girder bridge.5 and 10 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
5 and 10 ton
Model / arrangement
LH
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.

Showing 1–14 of 14 products

Start with the task if you are not sure of the type.

Send what you need to lift, where it moves and your site layout. We can discuss the equipment options and quotation scope.

Discuss your lifting task ↗

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…