Overhead cranes / Engineering selection

Metallurgical Overhead Crane

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Equipment reference1601831253532Configured for your project
Technical offer defines final specification
PRODUCT CONFIGURATIONYellow double-girder crane and hanging hook viewed from below beside a runway

Yellow double-girder crane and hanging hook viewed from below beside a runway. Crane-family reference; confirm the selected rating and layout.

Selection at a glance
5, 10, 16, 3.2 and 20 ton

Listed rated capacity

Hook-rating options
5T / 10T / 16T main + 3.2T auxiliary / 20T main + 5T auxiliary
Arrangement
Double girder bridge with a specified insulated lifting path
Span reference
10.5–31.5 m; confirm the selected rated layout
Hook levels
Specify each hook position, lifting attachment and process clearance
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

Metallurgical Overhead Crane listed specifications
Hook-rating options5T / 10T / 16T main + 3.2T auxiliary / 20T main + 5T auxiliary
ArrangementDouble girder bridge with a specified insulated lifting path
Span reference10.5–31.5 m; confirm the selected rated layout
Hook levelsSpecify each hook position, lifting attachment and process clearance
Duty selectionA6 reference; agree crane and mechanism duties from the actual cycle
Insulation scheduleSelected isolation points, electrical withstand and inspection criteria
Process conditionsContact voltage, load temperature, radiant heat, moisture and conductive dust
Controls & supplyCab or radio selection; site electrical supply and insulation interfaces by agreement
Hook ratingsComplete ladle and contents load, rigging and each hook's independent and combined load case.
Ladle routePickup, transport, pour and set-down workpoints, hook approaches and vessel envelope.
DutyCycle timing, load spectrum, operating shifts and selected crane mechanism classification.
Thermal conditionsAmbient temperature, radiant exposure, shielding and specified protection for the actual route.

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Runway and structural support

Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.

Hook coverage and useful height

Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.

Duty, power and environment

State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Crane equipmentSelected bridge, hoist or trolley, travel drives, controls and specified safety functions.
Runway and power feedRails, supporting steelwork, power-feed system and the allocation of building interfaces.
Delivery and installationNamed delivery term, unloading, installation work, local labour and access equipment.
Acceptance and handoverInspection and test plan, records, documentation, training, spare parts and warranty terms.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

Metallurgical Overhead Crane. Available rated-load options: 5T or 10T or 16T / 3.2T or 20T / 5T. A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement. Also specified as a bridge crane, this equipment can be configured for the work area and lifting task. Defining vessel mass, hook duties, process route and thermal exposure helps buyers compare a crane offer against the actual casting cycle. Common applications include ladle transfer between furnace and casting stations and foundry charging and tapping operations. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.

Equipment
Metallurgical Overhead Crane
Capacity / selection
5T or 10T or 16T / 3.2T or 20T / 5T
Application
ladle transfer between furnace and casting stations
Archived supplier-listing reference
US$12,300–15,400 / set

Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.

START WITH THE LOAD

Choose the Right Metallurgical Overhead Crane

A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement. Defining vessel mass, hook duties, process route and thermal exposure helps buyers compare a crane offer against the actual casting cycle. Typical applications include ladle transfer between furnace and casting stations, foundry charging and tapping operations, tundish or casting-line service. Compare the proposed configuration with the actual load, reach, duty and site dimensions.

Ladle, contents and hook duties

State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.

Process route and clearance

Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.

Duty, heat and controls

Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.

Saved supplier listing captured 2026-10-13; quantity tiers: 1-2 sets: US$15,400 per set · ≥3 sets: US$12,300 per set. The listing does not establish a current, project-specific or delivered price. Main and auxiliary hook duties, vessel load, span and process clearances determine the crane configuration. Crane classification, selected hoist or trolley, speeds and controls affect the mechanisms. Thermal protection, power, rails, support structure and installation are project-dependent. Transport, process testing, commissioning and scope boundaries must be confirmed in the current offer.

SEE THE EQUIPMENT

Metallurgical Overhead Crane Features

Review these metallurgical overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.

Yellow double-girder crane and hanging hook viewed from below beside a runway01 / METALLURGICAL OVERHEAD CRANE · 01

Ladle, contents and hook duties

Compare the selected upper and lower hook positions, rigging allowance and side approaches with the pickup and landing points. State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.

Yellow and orange double-girder overhead bridges with guardrails beneath a steel roof02 / METALLURGICAL OVERHEAD CRANE · 02

Process route and clearance

Compare the selected upper and lower hook positions, rigging allowance and side approaches with the pickup and landing points. Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.

Yellow double-girder bridges above a long industrial aisle03 / METALLURGICAL OVERHEAD CRANE · 03

Duty, heat and controls

Confirm rail centres, required hook coverage, building clearances and wheel reactions for the selected load, span and operating cycle. Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.

Coordinate Ladle Motions and Process Stops

Specify pickup, transfer, pouring and standby positions, main and auxiliary hook functions, movement speeds and operator view. Confirm heat exposure, limits and agreed operating sequence for the selected crane.

COMPARE THE COMPLETE PROPOSAL

Define your supply package.

Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.

EQUIPMENT PACKAGE

Selected Metallurgical Overhead Crane

  • Rated load or task: 5, 10, 16, 3.2 and 20 ton
  • State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.
  • Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.
SITE INTERFACES

Power, support & layout

  • Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.
  • Confirm support, power, clearances and purchaser-provided work in the offer.
  • Separate equipment price, delivery and site services for comparison.
DELIVERY & SERVICE

Order & installation scope

  • State transport, unloading and erection access.
  • List agreed testing, commissioning, manuals and operator handover.
  • Confirm maintenance access, wear parts and service support requested.

Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.

SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE

Specify Your Metallurgical Overhead Crane

Provide the layout and operating conditions to compare a metallurgical overhead crane quotation against your actual project.

Discuss your workshop
01 Ladle, contents and hook duties
State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.
02 Process route and clearance
Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.
03 Duty, heat and controls
Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.

Henan Mine Crane Group

Metallurgical Overhead Crane Supply Scope

Compare itemized quotations with the same equipment, delivery and site-service boundaries.

Crane equipment

Confirm 5, 10, 16, 3.2 and 20 ton, selected mechanisms, control options and required accessories.

Site interfaces

List rail or support work, power supply, clearances and purchaser-provided services.

Delivery & installation

State transport, unloading, erection, testing, commissioning and service parts included in the offer.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Archived supplier-listing price rangeUS$12,300–15,400per set · MOQ 1 set

Range combines the price tiers shown in the saved listing. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 1-2 setsUS$15,400 / set
  • ≥3 setsUS$12,300 / set

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

What is a metallurgical overhead crane?

A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement.

What information is needed to quote a metallurgical overhead crane?

Ladle, contents and hook duties: State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases. Process route and clearance: Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones. Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.

How much does a metallurgical overhead crane cost?

US$12,300–15,400 per set is the saved supplier-listing reference, captured 2026-10-13. Main and auxiliary hook duties, vessel load, span and process clearances determine the crane configuration. Crane classification, selected hoist or trolley, speeds and controls affect the mechanisms. Thermal protection, power, rails, support structure and installation are project-dependent. Transport, process testing, commissioning and scope boundaries must be confirmed in the current offer. Request a current quotation for the selected configuration, quantity, delivery and services.

What load is used to select a ladle crane?

Provide ladle tare, maximum contents, lifting attachments and the permitted main and auxiliary hook load cases. Confirm the required rating and process sequence in the technical offer.

What affects a foundry ladle crane quotation?

Hook duties, span, clearance, duty cycle, thermal conditions, drives, controls, support structure, rail and installation scope affect the project price.

5, 10, 16, 3.2 and 20 tonOverhead cranes
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…