Runway and structural support
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Red double-girder cranes and suspended grab beneath green factory roof trusses. Crane-family reference; confirm the selected rating and layout.
Listed rated capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Capacity enquiry options | Agree the gross suspended load, bridge structure and selected grab arrangement |
|---|---|
| Arrangement | Selected bridge and grab-handling trolley; confirm bridge structure in the technical offer |
| Span reference | 10.5–31.5 m options; confirm selected rated layout |
| Working envelope | Define pit depth, highest material pile, discharge point and clearances |
| Rated suspended load | Include the grab and its contents; agree the rated-load definition |
| Grab selection | Material, bulk density, lump size, moisture and opening method |
| Operating cycle | Required throughput, transfer distance, lifts per hour and shifts |
| Controls & supply | Agree operator position, motion functions and site electrical supply |
| Handled material | Loose bulk density, size, moisture, abrasiveness and filling behaviour. |
| Grab and gross suspended load | Working volume, fill allowance, maximum material payload, grab tare and suspended accessories; confirm the crane rating and load case. |
| Bridge and handling route | Bridge span, runway coverage, pickup depth, hopper opening, discharge height and open-grab clearances. |
| Duty and controls | Material throughput target, cycle and shifts, selected lift/travel speeds, opening/closing mechanism, power and command interface. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.
State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, hoist or trolley, travel drives, controls and specified safety functions. |
| Runway and power feed | Rails, supporting steelwork, power-feed system and the allocation of building interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
Grab Overhead Crane. Confirm the selected bridge structure and rated suspended load in the technical offer. An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. A grab-equipped crane picks up and discharges bulk material with a grab selected for the material and handling cycle. Also specified as a double girder bridge crane, this equipment can be configured for the work area and lifting task. Matching the grab payload and cycle to the crane, stockpile and receiving hopper helps buyers compare a complete material-handling package. Common applications include bulk-material stockpile and hopper loading and process-bin feeding and material transfer. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.
Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.
START WITH THE LOAD
An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. A grab-equipped crane picks up and discharges bulk material with a grab selected for the material and handling cycle. Matching the grab payload and cycle to the crane, stockpile and receiving hopper helps buyers compare a complete material-handling package. Typical applications include bulk-material stockpile and hopper loading, process-bin feeding and material transfer, scrap or recycling handling where the selected grab suits the material. Compare the proposed configuration with the actual load, reach, duty and site dimensions.
Provide material type, loose bulk density, piece size, moisture and abrasiveness. Specify grab working volume, fill allowance and tare mass; confirm the maximum material payload plus grab and suspended accessories against the crane rating.
Map pickup depth, stockpile limits, receiving-hopper opening and discharge height, open-grab envelope and travel route. Provide bridge span, runway length, supporting structure, hook approaches and building clearances.
State target material throughput, lift and travel distances, cycles per hour, shifts and positioning needs. Confirm grab opening/closing mechanism, power and control interface, operator view and quoted scope for crane, grab, power feed, installation and testing.
Saved supplier listing captured 2026-10-13; quantity tiers: 1-4 sets: US$5,800 per set · ≥5 sets: US$4,800 per set. The listing does not establish a current, project-specific or delivered price. Material density, working volume, filling conditions and grab tare determine the required payload and crane gross suspended load. Bridge span, runway coverage and lift height, handling duty, speeds and grab operating mechanism affect the equipment package. Grab power and controls, rope or cable arrangement, wear parts, hopper interfaces and dust or weather requirements change the supplied scope. Runway rails and supports, power supply, transport, erection, commissioning and acceptance tests must be itemized in the current quotation.
SEE THE EQUIPMENT
Review these grab overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.
01 / DOUBLE GIRDER GRAB OVERHEAD CRANE · 01Confirm material density, grab weight, net payload, opening clearance and pickup-to-discharge cycle for the selected equipment. Provide material type, loose bulk density, piece size, moisture and abrasiveness. Specify grab working volume, fill allowance and tare mass; confirm the maximum material payload plus grab and suspended accessories against the crane rating.
02 / DOUBLE GIRDER GRAB OVERHEAD CRANE · 02Confirm material density, grab weight, net payload, opening clearance and pickup-to-discharge cycle for the selected equipment. Map pickup depth, stockpile limits, receiving-hopper opening and discharge height, open-grab envelope and travel route. Provide bridge span, runway length, supporting structure, hook approaches and building clearances.
03 / DOUBLE GIRDER GRAB OVERHEAD CRANE · 03Confirm material density, grab weight, net payload, opening clearance and pickup-to-discharge cycle for the selected equipment. State target material throughput, lift and travel distances, cycles per hour, shifts and positioning needs. Confirm grab opening/closing mechanism, power and control interface, operator view and quoted scope for crane, grab, power feed, installation and testing.
Describe the pickup, closing, hoisting, travelling and discharge sequence. Confirm the selected rope, electric or hydraulic grab mechanism, any radio release, power interface, operator sightlines, motion speeds and limits; do not assume one control arrangement suits every grab.
COMPARE THE COMPLETE PROPOSAL
Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.
Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.
SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE
Provide the layout and operating conditions to compare a grab overhead crane quotation against your actual project.
Discuss your workshopHenan Mine Crane Group
Compare itemized quotations with the same equipment, delivery and site-service boundaries.
Confirm 5, 10, 16 and 20 ton, selected mechanisms, control options and required accessories.
List rail or support work, power supply, clearances and purchaser-provided services.
State transport, unloading, erection, testing, commissioning and service parts included in the offer.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. A grab-equipped crane picks up and discharges bulk material with a grab selected for the material and handling cycle.
Material, grab volume and gross load: Provide material type, loose bulk density, piece size, moisture and abrasiveness. Specify grab working volume, fill allowance and tare mass; confirm the maximum material payload plus grab and suspended accessories against the crane rating. Stockpile, hopper and runway coverage: Map pickup depth, stockpile limits, receiving-hopper opening and discharge height, open-grab envelope and travel route. Provide bridge span, runway length, supporting structure, hook approaches and building clearances. Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.
US$4,800–5,800 per set is the saved supplier-listing reference, captured 2026-10-13. Material density, working volume, filling conditions and grab tare determine the required payload and crane gross suspended load. Bridge span, runway coverage and lift height, handling duty, speeds and grab operating mechanism affect the equipment package. Grab power and controls, rope or cable arrangement, wear parts, hopper interfaces and dust or weather requirements change the supplied scope. Runway rails and supports, power supply, transport, erection, commissioning and acceptance tests must be itemized in the current quotation. Request a current quotation for the selected configuration, quantity, delivery and services.
Confirm how the supplier defines the stated rating. Check the total suspended load, including the grab, material and accessories. Select working volume using the specified material density and filling conditions; grab volume alone does not establish payload.
Provide material and density, required payload or throughput, grab volume and tare, pickup and hopper layout, span, lift and travel distances, duty cycle, power and controls. Itemize the crane, grab, rail or support work, delivery, installation and testing.