Overhead cranes / Engineering selection

Foundry Ladle Overhead Crane

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Equipment reference1601938699377Configured for your project
Technical offer defines final specification
PRODUCT CONFIGURATIONRed heavy bridge crane beneath a steel roof.

Red heavy bridge crane beneath a steel roof

Selection at a glance
100 and 32 ton

Listed rated capacity

Ladle and complete suspension load
Provide the metal and vessel masses in T and identify the lifting beam, tackle and any other suspended items separately. State the complete load for the proposed main-hook task and the ladle condition at pickup and landing. Attach vessel and suspension drawings, including the centre of gravity and any variation during the intended operation.
Trunnion, beam and contact interfaces
Give trunnion spacing, bearing/contact dimensions and lifting-beam connection details in mm. Identify who supplies and verifies the ladle, beam, attachments and replaceable contact parts. Request the selected suspension drawing and the applicable inspection and acceptance requirements so each contact and load-transfer interface has an assigned owner.
Separate main and auxiliary tasks
Use 100T main and 32T auxiliary as separate capacity requests. Describe the load, contact point and motion required from the auxiliary hook, including any proposed engagement with the ladle. Do not add the hook ratings. Any task involving both mechanisms, including proposed tipping or pouring, needs specific engineering review and agreed operating instructions.
Main and auxiliary trolley rail arrangement
A YZS family arrangement uses outer bridge rails for the main trolley and inner rails for the auxiliary trolley. Ask the supplier to identify the actual arrangement proposed for the requested capacities, including trolley envelopes, hook relationships and interference checks. Review any operation involving both mechanisms with the selected design and operating instructions.
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

Foundry Ladle Overhead Crane listed specifications
Ladle and complete suspension loadProvide the metal and vessel masses in T and identify the lifting beam, tackle and any other suspended items separately. State the complete load for the proposed main-hook task and the ladle condition at pickup and landing. Attach vessel and suspension drawings, including the centre of gravity and any variation during the intended operation.
Trunnion, beam and contact interfacesGive trunnion spacing, bearing/contact dimensions and lifting-beam connection details in mm. Identify who supplies and verifies the ladle, beam, attachments and replaceable contact parts. Request the selected suspension drawing and the applicable inspection and acceptance requirements so each contact and load-transfer interface has an assigned owner.
Separate main and auxiliary tasksUse 100T main and 32T auxiliary as separate capacity requests. Describe the load, contact point and motion required from the auxiliary hook, including any proposed engagement with the ladle. Do not add the hook ratings. Any task involving both mechanisms, including proposed tipping or pouring, needs specific engineering review and agreed operating instructions.
Main and auxiliary trolley rail arrangementA YZS family arrangement uses outer bridge rails for the main trolley and inner rails for the auxiliary trolley. Ask the supplier to identify the actual arrangement proposed for the requested capacities, including trolley envelopes, hook relationships and interference checks. Review any operation involving both mechanisms with the selected design and operating instructions.
Capacity, material and duty scheduleRequest a matched 100T main / 32T auxiliary schedule showing separate hook ratings, selected construction, duty and crane outline. If Q355B is required, include the grade in the purchase specification and request the proposed material and traceability records. Tie the drawing and material requirements to the offered package.
Process exposure and site interfacesDescribe the actual radiant heat, dust, operating cycle and time near the ladle, together with the pickup, transfer and landing locations. Give runway rail-centre span and useful hook travel in m, and suspension/contact dimensions in mm. Request selected support actions, thermal provisions, access and electrical scope for review against the process and building.
Suspension review and purchase responsibilitiesInclude the selected main/auxiliary schedule, ladle/beam connection drawings and proposed trolley rail layout in the technical offer. Allocate vessel, attachment, site support, protection and operating-procedure responsibilities. Agree inspection, task assessment, commissioning conditions and handover records with the relevant parties before the intended ladle operation is approved.
Hook ratingsComplete ladle and contents load, rigging and each hook's independent and combined load case.
Ladle routePickup, transport, pour and set-down workpoints, hook approaches and vessel envelope.
DutyCycle timing, load spectrum, operating shifts and selected crane mechanism classification.
Thermal conditionsAmbient temperature, radiant exposure, shielding and specified protection for the actual route.
Controls and site fitOperator location, speeds, limits, runway reactions, support data, power and installation scope.

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Runway and structural support

Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.

Hook coverage and useful height

Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.

Duty, power and environment

State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Crane equipmentSelected bridge, hoist or trolley, travel drives, controls and specified safety functions.
Runway and power feedRails, supporting steelwork, power-feed system and the allocation of building interfaces.
Delivery and installationNamed delivery term, unloading, installation work, local labour and access equipment.
Acceptance and handoverInspection and test plan, records, documentation, training, spare parts and warranty terms.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

Foundry Ladle Overhead Crane. Main / auxiliary hook ratings: 100T main / 32T auxiliary request — separate hook tasks. A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement. Also specified as a bridge crane, this equipment can be configured for the work area and lifting task. Defining vessel mass, hook duties, process route and thermal exposure helps buyers compare a crane offer against the actual casting cycle. Common applications include ladle transfer between furnace and casting stations and foundry charging and tapping operations. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.

Equipment
Foundry Ladle Overhead Crane
Capacity / selection
100T main / 32T auxiliary request — separate hook tasks
Application
ladle transfer between furnace and casting stations
Archived supplier-listing reference
US$98,650–125,630 / set

Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.

START WITH THE LOAD

Choose the Right Foundry Ladle Overhead Crane

A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement. Defining vessel mass, hook duties, process route and thermal exposure helps buyers compare a crane offer against the actual casting cycle. Typical applications include ladle transfer between furnace and casting stations, foundry charging and tapping operations, tundish or casting-line service. Compare the proposed configuration with the actual load, reach, duty and site dimensions.

Ladle, contents and hook duties

State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.

Process route and clearance

Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.

Duty, heat and controls

Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.

Saved supplier listing captured 2026-10-12; quantity tiers: 1-4 sets: US$125,630 per set · ≥5 sets: US$98,650 per set. The listing does not establish a current, project-specific or delivered price. Main and auxiliary hook duties, vessel load, span and process clearances determine the crane configuration. Crane classification, selected hoist or trolley, speeds and controls affect the mechanisms. Thermal protection, power, rails, support structure and installation are project-dependent. Transport, process testing, commissioning and scope boundaries must be confirmed in the current offer.

SEE THE EQUIPMENT

Foundry Ladle Overhead Crane Features

Review these foundry ladle overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.

Red heavy bridge crane beneath a steel roof.01 / FOUNDRY LADLE OVERHEAD CRANE · 01

Ladle, contents and hook duties

Red heavy bridge crane beneath a steel roof. State hot-metal, vessel and rigging masses for each process stage. Assign the main and auxiliary hook tasks and agree every permitted lifting and tipping load case. State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.

Red heavy bridge beneath a tall workshop roof.02 / FOUNDRY LADLE OVERHEAD CRANE · 02

Process route and clearance

Red heavy bridge beneath a tall workshop roof. Provide furnace and pouring-station geometry, vessel suspension details, pickup levels and thermal exposure. Check hook approaches, useful lifting travel and the clearance needed for tipping. Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.

Red foundry bridge crane during outdoor assembly.03 / FOUNDRY LADLE OVERHEAD CRANE · 03

Duty, heat and controls

Red foundry bridge crane during outdoor assembly. Specify duty, control positions, heat protection, brake and limit functions and service access. Obtain the selected wheel loads, runway requirements and commissioning and acceptance scope. Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.

Coordinate Ladle Motions and Process Stops

Specify pickup, transfer, pouring and standby positions, main and auxiliary hook functions, movement speeds and operator view. Confirm heat exposure, limits and agreed operating sequence for the selected crane.

COMPARE THE COMPLETE PROPOSAL

Define your supply package.

Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.

EQUIPMENT PACKAGE

Selected Foundry Ladle Overhead Crane

  • Rated load or task: 100 and 32 ton
  • State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.
  • Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.
SITE INTERFACES

Power, support & layout

  • Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.
  • Confirm support, power, clearances and purchaser-provided work in the offer.
  • Separate equipment price, delivery and site services for comparison.
DELIVERY & SERVICE

Order & installation scope

  • State transport, unloading and erection access.
  • List agreed testing, commissioning, manuals and operator handover.
  • Confirm maintenance access, wear parts and service support requested.

Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.

SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE

Specify Your Foundry Ladle Overhead Crane

Provide the layout and operating conditions to compare a foundry ladle overhead crane quotation against your actual project.

Discuss your site
01 Ladle, contents and hook duties
State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases.
02 Process route and clearance
Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones.
03 Duty, heat and controls
Provide cycle frequency, load spectrum, ambient and radiant heat, operator sightlines, selected motions and acceptance requirements.

Henan Mine Crane Group

Foundry Ladle Overhead Crane Supply Scope

Compare itemized quotations with the same equipment, delivery and site-service boundaries.

Crane equipment

Confirm 100 and 32 ton, selected mechanisms, control options and required accessories.

Site interfaces

List rail or support work, power supply, clearances and purchaser-provided services.

Delivery & installation

State transport, unloading, erection, testing, commissioning and service parts included in the offer.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Archived supplier-listing price rangeUS$98,650–125,630per set · MOQ 1 set

Range combines the price tiers shown in the saved listing. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 1-4 setsUS$125,630 / set
  • ≥5 setsUS$98,650 / set

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

What is a foundry ladle overhead crane?

A foundry or ladle overhead crane transfers a ladle or hot-metal vessel through a steelmaking or casting bay using its selected hook arrangement.

What information is needed to quote a foundry ladle overhead crane?

Ladle, contents and hook duties: State vessel tare, maximum contents, lifting beam and attachments. Separate main and auxiliary hook ratings and permitted combined load cases. Process route and clearance: Mark pickup, transfer, pouring and standby positions, required hook levels, ladle tilt envelope and no-go zones. Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.

How much does a foundry ladle overhead crane cost?

US$98,650–125,630 per set is the saved supplier-listing reference, captured 2026-10-12. Main and auxiliary hook duties, vessel load, span and process clearances determine the crane configuration. Crane classification, selected hoist or trolley, speeds and controls affect the mechanisms. Thermal protection, power, rails, support structure and installation are project-dependent. Transport, process testing, commissioning and scope boundaries must be confirmed in the current offer. Request a current quotation for the selected configuration, quantity, delivery and services.

What load is used to select a ladle crane?

Provide ladle tare, maximum contents, lifting attachments and the permitted main and auxiliary hook load cases. Confirm the required rating and process sequence in the technical offer.

What affects a foundry ladle crane quotation?

Hook duties, span, clearance, duty cycle, thermal conditions, drives, controls, support structure, rail and installation scope affect the project price.

100 and 32 tonOverhead cranes
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.