Runway and structural support
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Develop a YZS ladle-crane project around the main lifting device, auxiliary task and vessel connection geometry. The four-girder family uses separate main and auxiliary trolley routes; the technical offer defines each selected rating and permitted operating case.

Red heavy overhead crane with upper machinery, walkway and large hanging hooks inside a production hall
Listed rated capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Equipment family | YZS four-girder casting/ladle crane with separate main and auxiliary trolley routes. |
|---|---|
| Family trolley arrangement | Main and auxiliary trolleys on separate routes; selected construction and rail arrangement shown in coordinated drawings. |
| Main lifting interface | Ladle-supporting beam/device, suspension centres, connection dimensions and complete load. |
| Auxiliary task | Separately defined secondary hook task and permitted interaction with the main arrangement. |
| Rating schedule | Independent main/auxiliary ratings and engineered load cases; paired or twin-trolley notation does not establish a combined lifting allowance. |
| Process envelope | Pickup, transport, tipping/pouring, standby and set-down workpoints with full vessel clearance. |
| Thermal/duty basis | Load spectrum, cycle timing, radiant/ambient exposure and selected protective/monitoring functions. |
| Runway and supply | Wheel-reaction cases, support/rail geometry, power feed, site supply and divided installation scope. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.
State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, hoist or trolley, travel drives, controls and specified safety functions. |
| Runway and power feed | Rails, supporting steelwork, power-feed system and the allocation of building interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
The YZS family uses a four-girder casting-crane arrangement with separate main and auxiliary trolley routes. The main lifting device supports the ladle; the secondary arrangement serves a separately defined task in the selected process sequence.
The selected crane requires one coherent schedule of independent ratings, vessel connections and permitted interactions. A paired capacity headline does not establish a combined lift, and a photograph does not select a magnetic attachment or pouring procedure.
ENGINEERING SELECTION
Use the same drawing revision for ladle trunnions or other connections, the lifting beam/device and the process layout. Include suspension centres and all relevant clearances.
Identify complete load cases for the main device and auxiliary task. Define interactions explicitly without summing headline capacities.
Dimension transport and tipping envelopes at every workpoint. Use exposure and cycle data to review shielding, components, controls and maintenance access.
EQUIPMENT AND INTERFACES
Photographs illustrate the archived equipment. The selected technical offer defines the supplied rating and arrangement.



Henan Mine Crane Group
YZS four-girder casting/ladle crane with separate main and auxiliary trolley routes.
Identify support/rail or floor work, power feed, delivery, unloading, installation and commissioning responsibilities.
Compare offers for the same configuration, document revision, quantity, delivery term and site-service scope.
Henan Mine Crane Group
Product and mechanism identities, rated load cases, dimensions, motions and the selected control/protection package.
General arrangement, lifting interface, site envelope and case-based support data matched to the same revision.
Agreed inspection/test plan, applicable equipment documents, operating instructions, service parts and allocated handover responsibilities.
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
No. A selected crane needs independent mechanism ratings and permitted load cases on coordinated drawings. A paired headline does not establish a combined allowable load.
The four-girder YZS family uses separate trolley routes. The selected drawings identify the main ladle-supporting device, auxiliary hook and their useful travel positions.
Its specific lifting or tipping task, load case, useful positions, interaction with the main arrangement and operating procedure.