Overhead cranes / Engineering selection

YZS Four-Girder Ladle Overhead Crane

Develop a YZS ladle-crane project around the main lifting device, auxiliary task and vessel connection geometry. The four-girder family uses separate main and auxiliary trolley routes; the technical offer defines each selected rating and permitted operating case.

Equipment reference1601927401553Configured for your project
Technical offer defines final specification
PRODUCT CONFIGURATIONRed heavy overhead crane with upper machinery, walkway and large hanging hooks inside a production hall.

Red heavy overhead crane with upper machinery, walkway and large hanging hooks inside a production hall

Selection at a glance
Project-selected main / auxiliary ratings

Listed rated capacity

Equipment family
YZS four-girder casting/ladle crane with separate main and auxiliary trolley routes.
Family trolley arrangement
Main and auxiliary trolleys on separate routes; selected construction and rail arrangement shown in coordinated drawings.
Main lifting interface
Ladle-supporting beam/device, suspension centres, connection dimensions and complete load.
Auxiliary task
Separately defined secondary hook task and permitted interaction with the main arrangement.
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

YZS Four-Girder Ladle Overhead Crane listed specifications
Equipment familyYZS four-girder casting/ladle crane with separate main and auxiliary trolley routes.
Family trolley arrangementMain and auxiliary trolleys on separate routes; selected construction and rail arrangement shown in coordinated drawings.
Main lifting interfaceLadle-supporting beam/device, suspension centres, connection dimensions and complete load.
Auxiliary taskSeparately defined secondary hook task and permitted interaction with the main arrangement.
Rating scheduleIndependent main/auxiliary ratings and engineered load cases; paired or twin-trolley notation does not establish a combined lifting allowance.
Process envelopePickup, transport, tipping/pouring, standby and set-down workpoints with full vessel clearance.
Thermal/duty basisLoad spectrum, cycle timing, radiant/ambient exposure and selected protective/monitoring functions.
Runway and supplyWheel-reaction cases, support/rail geometry, power feed, site supply and divided installation scope.

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Runway and structural support

Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.

Hook coverage and useful height

Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.

Duty, power and environment

State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Crane equipmentSelected bridge, hoist or trolley, travel drives, controls and specified safety functions.
Runway and power feedRails, supporting steelwork, power-feed system and the allocation of building interfaces.
Delivery and installationNamed delivery term, unloading, installation work, local labour and access equipment.
Acceptance and handoverInspection and test plan, records, documentation, training, spare parts and warranty terms.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

YZS Four-Girder Ladle Overhead Crane

The YZS family uses a four-girder casting-crane arrangement with separate main and auxiliary trolley routes. The main lifting device supports the ladle; the secondary arrangement serves a separately defined task in the selected process sequence.

The selected crane requires one coherent schedule of independent ratings, vessel connections and permitted interactions. A paired capacity headline does not establish a combined lift, and a photograph does not select a magnetic attachment or pouring procedure.

ENGINEERING SELECTION

Separate trolley duties and ladle connections

Define the vessel connection

Use the same drawing revision for ladle trunnions or other connections, the lifting beam/device and the process layout. Include suspension centres and all relevant clearances.

Keep trolley duties separate

Identify complete load cases for the main device and auxiliary task. Define interactions explicitly without summing headline capacities.

Review the full hot route

Dimension transport and tipping envelopes at every workpoint. Use exposure and cycle data to review shielding, components, controls and maintenance access.

EQUIPMENT AND INTERFACES

YZS Four-Girder Ladle Overhead Crane selection details

Photographs illustrate the archived equipment. The selected technical offer defines the supplied rating and arrangement.

Red heavy overhead crane with upper machinery, walkway and large hanging hooks inside a production hall.
Red overhead crane with hanging hook groups inside a steel-roof industrial hall.
Red overhead crane with hanging hook blocks in an outdoor factory yard.

Henan Mine Crane Group

Compare the equipment and site package

Selected equipment

YZS four-girder casting/ladle crane with separate main and auxiliary trolley routes.

Site boundaries

Identify support/rail or floor work, power feed, delivery, unloading, installation and commissioning responsibilities.

Current quotation

Compare offers for the same configuration, document revision, quantity, delivery term and site-service scope.

Henan Mine Crane Group

Agree the technical and handover documents

Technical schedule

Product and mechanism identities, rated load cases, dimensions, motions and the selected control/protection package.

Coordinated drawings

General arrangement, lifting interface, site envelope and case-based support data matched to the same revision.

Acceptance and handover

Agreed inspection/test plan, applicable equipment documents, operating instructions, service parts and allocated handover responsibilities.

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

Does 150+150 t mean this page offers a 300 t ladle lift?

No. A selected crane needs independent mechanism ratings and permitted load cases on coordinated drawings. A paired headline does not establish a combined allowable load.

How are the main and auxiliary trolleys arranged?

The four-girder YZS family uses separate trolley routes. The selected drawings identify the main ladle-supporting device, auxiliary hook and their useful travel positions.

What should be agreed for the auxiliary hook?

Its specific lifting or tipping task, load case, useful positions, interaction with the main arrangement and operating procedure.

Project-selected main / auxiliary ratingsOverhead cranes
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…