Runway and structural support
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Review a 20t single-girder crane with an A5 duty option, wire-rope hoist and frequency-controlled travel against your workshop load, cycle and layout.

Compact hoist below a yellow single girder. Series reference photograph; confirm the selected 20t hoist, headroom and approaches on the project drawing.
Enquiry capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Capacity requirement | 20t; state the complete lifted load and attachment masses |
|---|---|
| Bridge arrangement | Single-girder overhead travelling crane |
| Duty option | A5; selected classification reviewed against the load spectrum and work cycle |
| Hoist | Electric wire-rope hoist; selected unit and lifting speeds agreed |
| Bridge and trolley travel | Frequency-controlled travel; selected speed ranges and acceleration agreed |
| Span and hook envelope | Rail centres, useful hook levels and approaches defined on the project drawing |
| Operator controls | Pendant or radio-control arrangement specified in the offer |
| Listed supply reference | Three-phase 380 V, 50 Hz; confirm the actual site voltage, frequency and phase |
| Runway interface | Selected wheel reactions, rail profile, supports and clearances reviewed |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.
State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, hoist or trolley, travel drives, controls and specified safety functions. |
| Runway and power feed | Rails, supporting steelwork, power-feed system and the allocation of building interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Check pickup and landing points for the real load and rigging envelope. Match the selected duty and motions to daily handling, then review the runway reactions and available structural support.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
This 20t single-girder enquiry combines a wire-rope hoist with frequency-controlled travel and an A5 duty option. Check the complete lifted load, daily handling cycle and workshop geometry together: capacity alone does not establish the duty classification, hook coverage or runway reactions. Compare the selected configuration on a project drawing before agreeing the equipment and site-work scope.
Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.
REVIEW THE 20t TASK
A maximum load describes only part of the job. Explain how often the crane lifts near that load, how far the hoist and bridge travel, and how many hours the equipment works each shift.
List typical and maximum lifted loads, attachment masses and handling frequency. Ask the technical offer to state the rated-load basis and the classification used for the crane and its mechanisms.
Describe the pickup, landing and alignment tasks. Agree lifting speeds, travel speed ranges and acceleration for the selected hoist and drives rather than choosing them from capacity alone.
Show rail centres, required hook levels, side and end approaches, obstructions and workpoints. Obtain wheel reactions for the selected span and arrangement so the runway supports can be reviewed.
READ THE PHOTO CONTEXT
These photographs illustrate hoist and workshop arrangements. Readable markings show different ratings; the selected 20t equipment is defined by its technical offer and configuration drawing.
01 / SERIES REFERENCECompact hoist below a yellow single girder. Series reference photograph; confirm the selected 20t hoist, headroom and approaches on the project drawing.
02 / SERIES REFERENCESingle-girder cranes beneath grey roof beams; the upper girder is marked 3t. Series reference photograph, not evidence of the requested 20t configuration.
03 / SERIES REFERENCEYellow single-girder cranes in a workshop; the near girder is marked 10t and a rear girder 2t. Use this as a layout reference, not proof of a 20t crane.
Identify the pendant or radio-control arrangement, operator sight lines, required motion speeds and emergency-stop functions. List the selected control equipment and any backup controller in the offer.
COMPARE THE QUOTATION
Compare the selected bridge, hoist, drives and controls first. Use the Supply scope tab to allocate rails, power feed, transport, unloading, erection and commissioning, with exclusions visible before comparing totals.
CHECK THE DRAWING
Mark the load route and useful hook positions against columns, machines, roof members and services. Review the selected hoist headroom and approaches; overall building height does not establish usable lifting height.
Discuss your workshopAGREE THE HANDOVER
Agree the configuration drawing, rated-load basis, duty classification, inspection and test plan, document list and operator handover. Retain the selected component schedule and parts references for later maintenance enquiries.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark rail centres and length, rail-top level, useful hook levels and approaches, load and rigging dimensions, workpoints and obstructions. Include support drawings and site voltage, frequency and phase.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
No. Provide typical and maximum loads, attachment masses, handling frequency, travel distances and working shifts. The selected crane and mechanism classifications must be checked against that work cycle.
Provide runway rail centres and length, rail-top level, upper and lower useful hook positions, side and end approaches, load and rigging dimensions, and roof or service obstructions. Include available support drawings.
Ask the offer to identify the controlled motions, speed ranges, acceleration and selected hoist lifting speeds. Frequency-controlled travel does not by itself establish a particular hoist speed or a complete drive specification.
It is the archived supplier-listing reference captured 2026-10-12: US$6,000 per set for 1–2 sets and US$5,400 per set for at least 3 sets. Request a current itemized quotation for the selected capacity, span, hoist, duty, quantity, delivery and site services.
They are crane-series references. The second photograph has an upper girder marked 3t, and the third shows 10t and 2t girders. Confirm the ordered 20t configuration using the project drawing, equipment schedule and technical offer.