Runway and building review
Provide rail-centre span, rail-top levels, support drawings and clearances. Obtain the selected wheel reactions, rail/fixing details and end approaches for review against the building arrangement.
Compare a 20 ton European single-girder crane offer with its runway, electrical feed, delivery and installation responsibilities. Use one drawing and duty schedule to define the order boundary.

Yellow girder visibly marked 20t above a workshop aisle. Crane-family reference photograph; the selected crane, span and building interface are defined in the project offer.
Listed capacity; selected arrangement to be agreed
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Load basis | 20 ton enquiry; complete suspended load and lifting attachments specified |
|---|---|
| Bridge arrangement | European single-girder box type; selected section, end connection and hoist agreed |
| Span and coverage | Rail-centre span, travel limits and side/end approaches on the selected drawing |
| Useful hook travel | Required upper/lower hook positions, rigging allowance and obstructions supplied |
| Duty and speeds | Load spectrum, cycles, shifts and speeds supplied; structure/mechanism classes stated separately |
| Controls | Ground or radio control and functions specified for the selected package |
| Electrical feed | Site voltage, phases, frequency, isolation and moving-feed responsibilities agreed |
| Runway support | Rail/support scope, wheel reactions and fixing interfaces coordinated |
| Order boundary | Equipment, delivery, installation, commissioning and acceptance inclusions itemized |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide rail-centre span, rail-top levels, support drawings and clearances. Obtain the selected wheel reactions, rail/fixing details and end approaches for review against the building arrangement.
Show load dimensions, lifting attachments, pickup and set-down positions, hook travel and obstructions. State lifts per hour, load spectrum, shifts and required speeds; agree structure and mechanism classes separately.
State voltage, phases, frequency, operator positions and the proposed feed route. Allocate isolation, connection work, erection access, local services and the agreed environmental conditions.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, end carriages, hoist, drives, controls and agreed safety functions itemized. |
| Runway and electrical feed | Rails, supports, fixings, power feed, isolation and building-interface responsibilities allocated. |
| Delivery and site work | Delivery term, unloading, erection access, labour, connection and commissioning listed separately. |
| Acceptance and handover | Agreed drawings, inspection/test records, manuals, training, spares and warranty terms identified. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Trace the load route and hook workpoints, then identify the crane, building and site-service interfaces needed for the job.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
For a 20 ton European single-girder crane enquiry, compare the bridge and hoist package with the runway, electrical feed and site work it needs. An itemized offer should connect the selected load, span, hook positions and operating duty to a clear allocation of equipment, installation and acceptance responsibilities.
Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.
COMPARE THE SAME SCOPE
A bridge-and-hoist price may exclude the runway, moving power feed or installation. Ask each bidder to identify inclusions, exclusions and the party responsible for each interface before comparing totals.
Schedule the bridge, end carriages, hoist, travel drives, controls and agreed safety functions against the load and duty. Identify lifting attachments and any spare or backup control equipment separately.
Allocate rails, supporting steelwork, fixing details, electrical feed and isolation. Request wheel reactions and interface dimensions for the selected crane so the building design can be reviewed against the same arrangement.
State the delivery term, unloading, erection access, local labour, connection work and commissioning responsibilities. Identify what the purchaser must provide and which activities require a separate quotation.
READ THE EQUIPMENT VIEWS
Use these family photographs to discuss the equipment arrangement. They do not establish the dimensions, duty class or complete supply scope of the ordered crane.
01 / FAMILY REFERENCEYellow girder visibly marked 20t above a workshop aisle. Crane-family reference photograph; the selected crane, span and building interface are defined in the project offer.
02 / FAMILY REFERENCEFront view of a compact hoist beneath a yellow girder, with suspended ropes and trailing cables. Family reference photograph; request the selected hoist envelope, hook positions and moving-service arrangement.
03 / FAMILY REFERENCEUnderside view of the hoist and trolley with ropes and cables below a yellow girder. Family reference photograph; the ordered hoist rating, controls and access provisions require their own schedule.
MAKE EXCLUSIONS VISIBLE
The Supply scope tab provides a compact allocation checklist. For each package, name the designer, supplier and installer, and identify required purchaser inputs. Keep crane equipment, runway and power feed, delivery, site work and acceptance records as separate priced or explicitly included items.
SET THE DRAWING BASIS
Mark rail centres and rail-top levels, required hook workpoints, roof and service obstructions, columns and installation access. State the upper and lower hook positions and rigging allowance rather than using building height as useful hook travel.
Discuss your crane and site scopeAGREE THE HANDOVER
List the agreed arrangement drawings, equipment schedule, inspection and test plan, records, manuals and operator handover. Allocate factory and site activities, required witnesses, local responsibilities, spare parts and warranty terms in the order documents.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark rail centres and rail-top levels, upper/lower hook positions, rigging allowance, columns and obstructions. Include support drawings, electrical feed and erection access; allocate the associated supply and installation work.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
An equipment schedule for the selected bridge, end carriages, hoist, drives, controls and agreed safety functions, plus explicit inclusions and exclusions for runway, electrical feed, delivery, installation and acceptance. Compare offers against the same drawing and operating duty.
Inclusion depends on the agreed order. Name the party responsible for rails, supports and fixings, and request the selected wheel reactions and interface dimensions for the building review.
Provide rail-centre span, rail-top levels, required upper and lower hook positions, side and end approaches, obstructions and installation access. Hook travel and building height are different measurements.
Describe the load spectrum, lifts per hour, shifts, travel distances and required speeds. Ask for structure and mechanism classes separately, with the selected control functions and site electrical supply stated in the equipment schedule.
The supplier-listing reference captured 2026-10-13 shows US$5,600 per set for 1–4 sets, US$5,200 for 5–9 sets and US$4,600 for at least 10 sets. It does not establish a current project or installed price. Request an itemized quotation for the selected equipment and site services.