Winches / Engineering selection

20 ton Class Electric Winch: Rope Layers and Foundation Interfaces

Review the rope-layer schedule, mounting reactions and rope route for a 20T-class winch enquiry. Coordinate the selected equipment with its foundation and site interfaces.

Equipment reference1601866637175Configured for your project
Technical offer defines final specification
WINCH-RANGE REFERENCEBlue electric winch with wound wire-rope drum on a workshop floor

Blue winch with wire rope wound on the drum. Range reference photograph; obtain the selected drum dimensions, rope specification and working-layer schedule.

Selection at a glance
20T class

Catalogue enquiry class; rated rope force to be specified

Family
JM / JK winch
Pull basis
Working drum layer
Rope route
Exit and lead sheave
Mounting
Base and anchorage
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

20 ton Class Electric Winch: Rope Layers and Foundation Interfaces listed specifications
Catalogue class20T enquiry class; selected rated rope force and reference layer specified
Drive familyJM / JK electric drum winch; selected motor and reducer stated in the offer
Speed options10 or 22 m/min listed options; actual pull and speed schedule defined by working layer
Rope working rangeRope diameter, construction, length, usable storage and retained wraps agreed
Rope leadWinding direction, rope exit and lead-sheave geometry shown on the layout
Mounting interfaceBase dimensions, fixing details and selected mounting reactions provided
Braking and controlsStopping, holding, power-loss response, guarding and operator controls defined
Electrical supplyVoltage, phase, frequency, motor duty and starting or inverter arrangement confirmed
Operating conditionsNormal and maximum rope force, starts, running time, rest periods and environment supplied

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Task and working range

Identify lifting or pulling, normal and maximum required rope force with units, movement, load route and any reeving. Provide the required operating cycle and line speed.

Layout and support information

Show mounting level, base area, fixing locations, rope exit and lead sheave. Obtain selected mounting reactions and winding limits to coordinate the support and anchorage design.

Access, power and controls

Allow access to the drum, drive, brake and rope route. State site power, exposure and operator position, and agree guarding, stopping, holding and control functions for the intended duty.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Winch and ropeSelected drum, drive, brake, controls, guards, rope and terminations itemised in the equipment schedule.
Foundation and rope routeSupports, anchorage, fixing hardware, guides and sheaves allocated to named parties using the agreed interface drawing.
Installation and site servicesTransport, unloading, access, installation work, power feed and purchaser-provided equipment stated separately.
Acceptance and handoverPerformance schedule, drawings, test plan, records, manuals, training, spare parts and warranty terms agreed.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Trace the rope movement and working layers, then check the winch base, lead sheave, selected reactions and available access against the same installation layout.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

For a 20T-class winch enquiry, review the working rope layers and installation interfaces together. Ask for the selected pull and speed schedule, usable rope storage, mounting reactions and winding limits. The catalogue class does not define the rated force at each layer or approve a lifting duty; the equipment schedule and installation drawing must identify the intended task.

Enquiry class
20T catalogue class; selected rope force stated separately
Performance basis
Working layers, rope travel and operating cycle
Installation interface
Rope exit, lead sheave, base and anchorage

Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.

CONNECT PERFORMANCE TO THE LAYOUT

Match rope layers to the installation

The drum schedule and site drawing should describe the same working range. Compare the rope paid out at each workpoint with the selected pull, speed and winding limits before reviewing the supports.

Working layers

Identify the lowest and highest working layers. Request pull and line speed for those conditions, with rope diameter, usable storage and retained wraps stated in the schedule.

Rope exit and lead sheave

Show the drum orientation, direction of winding and first sheave on the layout. Obtain the selected permissible lead geometry and check it against the available space.

Reactions and support design

Request base dimensions, fixing details and mounting reactions for the specified load cases. Coordinate these with the support and anchorage design, access and installation sequence.

READ THE PHOTO CONTEXT

Winch assemblies from the range

These photographs illustrate visible assemblies. They do not establish a selected rating, foundation design or the configuration included in your order.

Blue electric winch with wound wire-rope drum on a workshop floor01 / RANGE REFERENCE

Wound drum

Blue winch with wire rope wound on the drum. Range reference photograph; obtain the selected drum dimensions, rope specification and working-layer schedule.

Blue winch with pale ventilated covers and a red brake assembly in a workshop02 / RANGE REFERENCE

Covers and brake assembly

Pale ventilated covers and a red brake assembly on a blue winch. Range reference photograph; show guarding, access and the selected brake arrangement on the installation documents.

Blue electric winch with wound drum, gearbox and red brake assembly on wooden supports03 / RANGE REFERENCE

Drive and temporary supports

Winch drum, blue gearbox and red brake assembly on wooden supports. Range reference photograph; these blocks do not specify the operating foundation, anchors or mounting reactions.

DEFINE THE INTERFACES

Allocate the winch and site work

Use the Supply scope tab to assign the winch, rope, sheaves, supports, anchors, power feed and installation. Keep each responsibility explicit so a quoted equipment package is not mistaken for a completed foundation or installed system.

COORDINATE THE DRAWINGS

Use one reference layout

Mark the winch base, fixing locations, mounting level, rope exit, lead sheave and load route. Include obstructions and maintenance access. Compare supplier interface dimensions and selected reactions with the support design before fixing the installation details.

Discuss your mounting layout

KEEP THE BASIS TRACEABLE

Review the schedule with the mounting drawing

The handover package should identify the selected pull and speed by working layer, rope specification, operating limits, controls and braking functions. Agree inspection and testing records, installation responsibilities, manuals, training, spares and warranty terms in the offer.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Archived supplier-listing price rangeUS$2,880–2,900per set · MOQ 1 set

Range combines the price tiers shown in the saved listing. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 1-2 setsUS$2,900 / set
  • ≥3 setsUS$2,880 / set

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Mark the winch base, mounting level, fixing points, rope exit, first sheave and load route. Add working rope travel, storage needs, clearances and the selected mounting reactions.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

Does the 20T class define the pull at every drum layer?

No. Ask for rated rope force with units and its reference layer, plus the permitted pull and speed across the working layers. Identify the intended duty separately, especially any lifting or suspended-load task.

What should the mounting drawing include?

Show the base, fixing locations, mounting level, rope exit, first lead sheave, load route, obstructions and access. Obtain the selected reactions and winding limits for coordination with the support and anchorage design.

Is maximum lifting height the same as usable rope storage?

No. Define the working movement, reeving and required rope length separately. The selected drum arrangement must state usable storage, working layers and retained wraps for that task.

What does the saved US$2,880–2,900 range cover?

It is the supplier-listing reference captured 2026-10-12: US$2,900 per set for 1–2 sets and US$2,880 per set for at least 3 sets. Request a current offer itemising the selected equipment, rope, interfaces, delivery and installation services.

Are the foundation and anchors included with the winch?

Only where the agreed offer includes them. Allocate the winch base, anchors, supporting structure, civil work, rope-route components and installation responsibilities explicitly, using the selected reactions and interface dimensions.

20T classWinches
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…