Winches / Engineering selection

20 ton Class Electric Winch: Rope, Drum and Brake Selection

Coordinate rope force, usable drum storage and braking functions for a 20T-class electric winch enquiry. Define the rope route and operating cycle before comparing the package.

Equipment reference1601866553593Configured for your project
Technical offer defines final specification
WINCH-RANGE REFERENCEBlue electric winch with wound wire-rope drum, drive motor and red brake linkage

Blue winch with a wound rope drum, drive motor and red brake linkage on a steel base. Range reference photograph; rope force, storage and permitted use depend on the selected equipment.

Selection at a glance
20T class

Catalogue enquiry class; rated rope force to be specified

Family
JM / JK winch
Rope basis
Specified rope and lead
Drum basis
Usable winding layers
Brake basis
Load case and cycle
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

20 ton Class Electric Winch: Rope, Drum and Brake Selection listed specifications
Catalogue class20T enquiry class; selected rated rope force and reference layer specified
Drive familyJM / JK electric drum winch; selected motor, reducer and controls stated
Working rope forceRequired and permitted rope force scheduled by layer, load direction and reeving
Rope specificationDiameter, construction, length and termination matched to drum, sheaves and duty
Drum storageUsable winding layers, retained wraps and storage for the specified rope agreed
Braking functionsStopping, holding, any lowering and response to power loss defined for the load case
Speed and cycleLoaded and return speeds, starts, stops, reversals and running periods supplied
Mounting and accessBase reactions, anchors, rope lead, guarding and service envelope coordinated
Power supplyVoltage, phases, frequency, starting arrangement and operator controls confirmed

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Load path and reeving

Show lifting or pulling duty, load direction, normal and maximum rope force with units, sheaves and workpoints. State load movement separately from the total rope required.

Drum, lead and supports

Provide drum orientation, rope exit and first-sheave position. Obtain the permitted lead geometry, storage and retained wraps, mounting reactions and fixing details for the selected equipment.

Braking, power and access

Describe starts, stops, reversals, holding periods and any lowering. State the electrical supply and operator position, and coordinate guarding, brake inspection and component-removal space.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Selected winch packageDrum, motor, reducer, brake, controls and guarding itemised against the agreed duty.
Rope-route interfacesRope, terminations, sheaves, guides, support structures, anchorage and power feed allocated.
Delivery and installationTransport, unloading, installation access, local services and commissioning responsibilities stated separately.
Acceptance and handoverAgreed drawings, inspection and test records, manuals, training, spares and warranty terms.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Review the full rope route, winding range and load direction. Match drum storage and stopping and holding duties to the movement and operating cycle.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

Specify a 20T-class electric winch as a coordinated rope, drum, drive and braking package. Start with the required rope force and working layers, then define useful travel, rope storage and stopping and holding duties. The catalogue class alone does not establish an allowable suspended load or the selected brake capacity.

Catalogue class
20T enquiry class; rated rope force and reference layer stated separately
Selection focus
Compatible rope, usable drum storage and braking functions
Drive family
JM / JK; selected motor, reducer and controls defined in the offer

Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.

SELECT THE COMPLETE ROPE SYSTEM

Match rope, drum and brake to the load case

Compare the proposed components as one system. State whether the task is pulling or lifting, the rope force with units, the load direction and the working layers before reviewing individual component ratings.

Rope specification and lead

Request rope diameter, construction, termination and the permitted lead geometry for the selected drum and sheaves. Rope breaking force is not an allowable working load; the selection must account for the intended duty and applicable design basis.

Usable drum storage

Separate load movement from rope length. Reeving, the rope route, retained wraps and winding limits affect the storage needed. Obtain drum dimensions, usable layers and the permitted storage for the specified rope rather than relying on a catalogue height.

Stopping and holding

Describe starts, stops, reversals, holding periods and any controlled lowering. For the same rope force, a larger winding radius requires greater drum torque. Ask for the selected brake arrangement and its permitted duty, including the agreed response to loss of power.

READ THE VISIBLE ASSEMBLIES

Drum, drive and brake photographs

These range photographs show component arrangements. They do not verify rope size, a selected load rating or braking performance.

Blue electric winch with wound wire-rope drum, drive motor and red brake linkage01 / RANGE REFERENCE

Wound drum and drive

Blue winch with a wound rope drum, drive motor and red brake linkage on a steel base. Range reference photograph; rope force, storage and permitted use depend on the selected equipment.

Blue winch with pale vented enclosure and red brake assembly in a workshop02 / RANGE REFERENCE

Enclosure and brake assembly

Pale vented enclosure and red brake assembly on a blue winch base. Range reference photograph; confirm the ordered guarding, brake and maintenance access in the equipment drawing.

Blue winch gearbox, wound drum, motor and red brake assembly on wooden supports03 / RANGE REFERENCE

Gearbox, drum and motor

Blue gearbox, wound drum, motor and red brake assembly resting on wooden supports. Range reference photograph; the supplied components and mounting arrangement are defined in the technical offer.

ALLOCATE THE WHOLE SYSTEM

Identify every rope-route interface

Use the Supply scope tab to allocate the winch, rope and terminations, sheaves, guides, supports, anchors, guarding and power feed. State which party designs and supplies each interface so an equipment-only quotation is compared with the same scope.

DRAW THE ROPE ROUTE

Show the first lead and service envelope

Mark the drum orientation, rope exit, first sheave, full load route and mounting level. Include the space needed for winding inspection, brake access, guarding and component removal. Request mounting reactions and fixing details for the selected arrangement.

Discuss your rope, drum and brake requirements

CHECK THE TECHNICAL OFFER

Request a coordinated equipment schedule

The schedule should connect rope force and speed by working layer with rope specification, drum storage, drive duty and braking functions. Agree drawings, inspection and test records, manuals, handover responsibilities, spares and warranty terms for the ordered package.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Archived supplier-listing price rangeUS$2,880–2,900per set · MOQ 1 set

Range combines the price tiers shown in the saved listing. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 1-2 setsUS$2,900 / set
  • ≥3 setsUS$2,880 / set

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Show the drum, first sheave, reeving and complete load route. State required rope force with units, load movement, rope length, speeds, holding periods and operating cycle.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

Does the 20T class establish the rope or brake rating?

No. Request rated rope force with units and a reference layer, the intended lifting or pulling duty, and the selected rope, drum and braking schedule. A catalogue class alone does not establish allowable suspended load.

Is rope breaking force the same as working line pull?

No. Breaking force describes a rope strength property; permitted working rope force depends on the selected system, duty and applicable design basis. Obtain the rope specification and equipment rating together.

What determines usable rope storage?

The specified rope, drum dimensions, permitted layers, retained wraps and winding limits. Show movement, reeving and the rope route separately; a listed lifting height is not proof of usable drum storage.

Which brake functions should the quotation identify?

Stopping, holding, any controlled lowering and the agreed response to loss of power. Provide the load direction, working layers and operating cycle so the selected arrangement can be reviewed for that duty.

What does the saved US$2,880–2,900 range cover?

It is the supplier-listing reference captured 2026-10-12: US$2,900 per set for 1–2 sets and US$2,880 per set for at least 3 sets. Request a current quotation itemising the selected winch, rope-route equipment, delivery and site services.

20T classWinches
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…