Provide vessel/rigging geometry and a load schedule for pickup, transfer, pouring and set-down. Identify main/auxiliary tasks and proposed coordinated motions.
Define the main and auxiliary hook loads, ladle movement envelope and heat exposure for a meltshop crane enquiry.

Red overhead bridge crane with a suspended hook block in an industrial bay. This corresponding archive photograph illustrates the arrangement; it does not establish the selected 225/65 t ratings or protection functions.
Separate enquiry references; selected ratings to agree
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Separate hook references | 225 t main / 65 t auxiliary enquiry references; do not add them. Agree each hook rating and every permitted combined-use load case. |
|---|---|
| Suspended-load schedule | Vessel tare, maximum contents, lifting beam and attachments; define the applicable rated-load basis and hook loads at each process stage |
| Process and tipping envelope | Pickup, transfer, pouring, standby and set-down positions; vessel geometry, rigging, tilt path and restricted areas |
| Span and runway interface | Surveyed rail-centre dimensions, rail section and top level, building clearances, selected wheel loads and support review |
| Useful hook positions | Required upper/lower positions for each hook and the clearance needed with the ladle and rigging in place |
| Archived lift alternatives | Supplier family listing gives 6, 10, 20, 32 and 55 m alternatives; the selected drawing defines usable hook movement |
| Duty and classification | Load spectrum, cycles, starts, shifts and process delays; specify crane and mechanism classifications under the agreed standard |
| Thermal exposure | Ambient conditions, radiant heat, exposure duration and equipment location; agree shielding and component limits for the route |
| Motors and electrical protection | Selected ingress protection, insulation system, cooling and electrical ratings; these do not alone establish whole-crane thermal suitability |
| Controls and protective functions | Operator position and view, selected motions, limits, braking and interlocks; document functions and acceptance requirements |
| Site electrical supply | Actual voltage, frequency, phase, power-feed route and isolation requirements; specify matching equipment in the offer |
| Supply and acceptance scope | Equipment, runway/power work, unloading/erection, process testing, commissioning, documents, training and contractual service responsibilities |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide vessel/rigging geometry and a load schedule for pickup, transfer, pouring and set-down. Identify main/auxiliary tasks and proposed coordinated motions.
Provide surveyed rail centres, rail section/top level, upper/lower hook positions, approaches and building/support drawings. Obtain selected wheel loads for structural review.
State cycles, starts, shifts, heat exposure at equipment locations, operator view and local power. Agree the operating limits and site responsibilities.
| Work package | Agree in the quotation |
|---|---|
| Crane and protective functions | Selected bridge/trolleys, separate hook mechanisms, controls, braking/limits/interlocks and documented operating conditions. |
| Runway and electrical interfaces | Allocated supporting structure, rails, moving power feed, isolation, local wiring and structural review. |
| Delivery and erection | Named delivery term, package/handling information, unloading, access equipment, erection and commissioning responsibilities. |
| Acceptance and handover | Agreed inspection/testing, load-case records, matching drawings/manuals, training, parts and contractual service terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Review the complete process load case, vessel movement and thermal exposure against the selected arrangement.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
A meltshop crane enquiry needs a process load case, not just a tonnage label. For this 225/65 t ladle-crane reference, identify the main and auxiliary hook tasks separately, then map the full vessel and rigging envelope through pickup, transfer, pouring and set-down. Compare operating duty, heat exposure and runway inputs on the same project drawing. The supplier listing provides a starting reference; the selected ratings, permitted motions and protection functions belong in the technical offer.
LOAD · ROUTE · EXPOSURE
Use the same operating sequence and layout when evaluating alternative crane configurations.
Record vessel tare, maximum contents, beam and attachment masses. Identify what each hook supports during pickup, transfer and pouring, and ask for permitted combinations rather than assuming two independent maximum loads can act together.
Mark furnace and receiving-station geometry, hook levels, approaches, columns, maintenance access and restricted areas. Check clearance through the intended motion, including vessel tilt and rigging, with the selected drawing.
Provide load cycles, travel distances, starts, shifts and holding periods. State ambient and radiant exposure at the equipment locations; agree the applicable classifications, shielding, cooling and operating limits in the offer.
CORRESPONDING ARCHIVE PHOTOGRAPHS
These three photographs are in this product archive. They show equipment views; the project drawings define capacity, process clearances and protective functions.
01 / EQUIPMENT-FAMILY REFERENCERed overhead bridge crane with a suspended hook block in an industrial bay. This corresponding archive photograph illustrates the arrangement; it does not establish the selected 225/65 t ratings or protection functions.
02 / EQUIPMENT-FAMILY REFERENCEYellow multi-girder bridge viewed from below. Use the selected arrangement drawing to check girder, trolley and hook clearances; the photograph does not establish the quoted load case.
03 / EQUIPMENT-FAMILY REFERENCERed overhead bridge crane above a steelmaking work area. Treat this as an equipment-family view, then define the actual process route, heat exposure and operating restrictions in the project review.
DEFINE THE SELECTED SYSTEM
Itemize bridge and trolley arrangements, main/auxiliary mechanisms, controls, power feed and the agreed protective functions. Request matching load cases, wheel loads, dimensions and operating limits.
Allocate runway and support work, electrical supply, unloading, erection and access equipment. Agree the inspection and process-test plan, commissioning sequence, records, operator handover and contractual service terms. Historical listing descriptions of brakes, thermal layers or component brands do not define the selected system.
PROCESS LAYOUT AND OPERATING CYCLE
Include vessel and rigging geometry, pickup/pouring/set-down positions, hook levels, rail-centre dimensions, support drawings and equipment access. Add operating shifts, cycle frequency, exposure locations and the actual site electrical supply.
Discuss your meltshop requirementsHenan Mine Crane Group
Keep equipment references, revision dates and responsibility boundaries consistent across the offer and drawings.
Identify separate hook ratings, approved load cases, crane and mechanism duty, speeds, controls, thermal provisions and applicable standards. Resolve differences with the operating sequence before ordering.
Review wheel loads and runway interfaces with the responsible structural designer. Allocate power, access, erection, isolation and site preparation in the agreed supply scope.
Agree inspection, functional and applicable load/process testing, required records, matching manuals, training and spare-parts identification. State warranty and service obligations in the contract.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Send the vessel and rigging layout, stage-by-stage main/auxiliary hook loads, operating route, hook levels and runway/support drawings. Add duty, heat exposure, site power and installation responsibilities.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
No. This listing uses a main/auxiliary hook reference. The selected technical documentation must state each hook rating, allowed combined load cases and permitted movements. Do not infer a 290 t rating or simultaneous maximum loading from the pair.
Include the vessel and rigging envelope, hook levels, pickup and pouring positions, full intended tilt path, approaches, nearby structures and restricted areas. Use the selected arrangement and load cases to review clearance throughout the movement.
No. Motor ingress protection and insulation classification address particular component properties. Whole-system suitability depends on the actual ambient and radiant exposure, duration, location, shielding, cooling and selected component limits. Agree those conditions for the meltshop route.
Provide the load spectrum, cycles, starts, shifts and process sequence, then agree crane and mechanism classifications under the applicable standard. Do not assume ISO/FEM labels are interchangeable. The archived 6, 10, 20, 32 and 55 m options do not establish the selected useful hook movement.
The supplier listing captured 2026-10-12 shows US$900,000 per set for 1–2 sets and US$890,000 for at least 3 sets. These historical tiers are not a current project or delivered quotation. Compare an itemized offer for the selected crane, protection functions, runway interfaces, delivery and site services.