Overhead cranes / Engineering selection

240/80 t Casting Crane: Process, Controls and Braking

Define the casting sequence, operator view and stopping/holding requirements alongside separate main and auxiliary hook loads.

Equipment reference1601795049089Configured for your project
Technical offer defines final specification
COMPONENT REFERENCEOrange operator cabin with windows, access landing and control console

Orange operator cabin with windows, landing and console. This archive component view supports discussion of sightlines and access; it does not establish the supplied station or its heat protection.

Selection at a glance
240 t main / 80 t auxiliary

Separate enquiry references; selected ratings to agree

Hook references
240 t main / 80 t auxiliary; separate load cases
Process sequence
Pickup, transfer, holding, pouring and set-down
Operating arrangement
Visibility, permitted motions and load holding
Supply scope
Equipment, site works and acceptance
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

240/80 t Casting Crane: Process, Controls and Braking listed specifications
Main and auxiliary references240 t main / 80 t auxiliary enquiry references; selected ratings, allowed combinations and operating sequence to agree
Vessel and suspended assemblyVessel tare, maximum contents, beams, attachments and rigging; define the rated-load basis and load carried by each hook
Process positionsPickup, transfer, holding, pouring and set-down locations; identify critical stops, nearby structures and restricted areas
Useful hook movementUpper/lower positions, hook spacing and vessel tilt path with the actual lifting connections; confirm usable coverage on the selected drawing
Span and runway interfaceSurveyed rail centres, rail section/level, approaches and selected wheel loads; archived 10.5–31.5 m is a family reference
Operating dutyLoad spectrum, cycle timing, starts, shifts and holding periods; specify crane and mechanism classifications under the applicable standard
Operator visibility and accessView of vessel, lifting points and process stops, communication, station access and evacuation for the selected control location
Stopping and load holdingRequired stopping/holding behaviour, selected brake arrangement, monitoring and inspection access; agree functions and acceptance criteria
Controls and permitted motionsTravel/lifting speeds, positioning, coordinated movements, limits and interlocks; document allowed operating modes and recovery procedures
Heat and component environmentAmbient/radiant exposure and duration, dust and equipment location; specify component limits, shielding, cooling and enclosure requirements
Site electrical supplyActual voltage, frequency and phase, feed path and isolation; match selected equipment to the site rather than conflicting listing ranges
Supply, testing and handoverCrane package, supporting structure/rails/power work, delivery, erection, commissioning, applicable tests, documents, training and contractual support

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Vessel and process sequence

Provide vessel/contents/rigging masses, lifting connections, hook loads by stage and the required movements and stops.

Bay and operator arrangement

Provide runway/support drawings, hook levels and vessel envelope, proposed operator location, visibility restrictions and access.

Environment and requested services

State duty, heat exposure, power and isolation, site constraints and the transport, erection or commissioning services to include.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Selected equipment and controlsBridge/trolleys, separate hook mechanisms, operating station, electrical equipment and defined motion/protection functions.
Site infrastructureSupporting structure, rails, power, isolation, access and structural review assigned to responsible parties.
Delivery and installationAgreed delivery terms, package information, unloading, erection/access equipment and installation responsibilities.
Acceptance and supportApplicable testing and records, drawings/manuals, training, spare parts and contractual warranty/service obligations.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Match vessel movements, hook loads and control functions to the intended casting process.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

Map the casting process before selecting the crane controls and operating arrangement. This archived listing uses separate 240 t main and 80 t auxiliary hook references, not a combined 320 t capacity. Show where the vessel is picked up, transferred, held, poured and set down, with the load supported by each hook. Then review operator visibility, permitted movements, stopping and holding requirements, heat exposure and site interfaces in the selected technical offer.

Equipment family
Casting and ladle-handling overhead crane
Separate hook references
240 t main / 80 t auxiliary; selected ratings and load cases to agree
Quotation basis
Process positions, hook loads and defined operating modes
Review package
Vessel/rigging layout, motion schedule, site inputs and itemized scope

PROCESS · VISIBILITY · CONTROL

Turn the casting sequence into a crane requirement

A hook-rating pair is only one input. Give suppliers the same process sequence and operating conditions for a useful comparison.

Schedule loads and movements

List pickup, travel, holding, pouring and set-down stages. Identify vessel contents, lifting connections and the load carried by each hook. Ask the selected design to define allowable combinations and coordinated movements.

Check what the operator can see

Review the vessel and process stops from the proposed station. Account for structures, equipment and changing vessel positions. Specify communication, access and environmental requirements with the purchaser’s operating team.

Specify stopping and holding functions

Describe required motion control and load holding at each stage. Request the selected braking, limit and interlock functions, their operating boundaries and inspection needs. Agree the applicable verification and acceptance criteria.

CORRESPONDING COMPONENT REFERENCES

Operator cabin, drum brake and motor

These three photographs are retained in this product archive. Their visible components help frame the enquiry; they do not establish an approved 240/80 t crane configuration.

Orange operator cabin with windows, access landing and control console01 / COMPONENT REFERENCE

Operator cabin and access

Orange operator cabin with windows, landing and console. This archive component view supports discussion of sightlines and access; it does not establish the supplied station or its heat protection.

Red industrial drum-brake assembly with black actuator02 / COMPONENT REFERENCE

Drum-brake assembly

Red drum-brake assembly with black actuator. This component reference does not establish the selected brake arrangement, redundancy, holding capacity or safety functions.

Blue electric crane motor with projecting shaft and cooling fins03 / COMPONENT REFERENCE

Electric motor reference

Blue electric motor with projecting shaft and cooling fins. Confirm the selected motor ratings, mounting, duty, power supply and environmental limits in the offer.

COMPARE THE SELECTED PACKAGE

Allocate controls, site works and acceptance

Itemize bridge/trolleys, main and auxiliary mechanisms, operator station, electrical equipment and agreed motion/protection functions. Request matching dimensions, wheel loads, operating limits and maintenance access.

Assign supporting structure, rails, site power and isolation, unloading and erection access to the responsible parties. Separate transport and site-service prices where required. Agree applicable functional, load and process tests, commissioning records, manuals and training before ordering.

ONE PROCESS-BASED ENQUIRY

Send the bay layout and casting sequence

Include vessel and rigging geometry, hook loads by stage, critical stops and the proposed control location. Add runway/support drawings, duty, heat exposure and site power. Mark the equipment and services to include in the quotation.

Discuss your casting-crane requirements

Henan Mine Crane Group

Review functions before agreeing acceptance

Keep equipment references and revision dates consistent across the offer, drawings and test plan.

Resolve the operating arrangement

Check hook-load cases, vessel movement, operator view, selected speeds and stopping/holding functions against the intended casting sequence.

Coordinate the installation interfaces

Obtain selected dimensional interfaces and wheel loads for the responsible structural designer. Allocate rails, power, isolation, access and purchaser-provided work.

Define handover records

Agree applicable inspections and tests, operating limits, drawings, manuals, training and parts identification. State warranty and service obligations in the contract.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Archived supplier-listing price rangeUS$890,000–900,000per set · MOQ 1 set

Range combines the price tiers shown in the saved listing. Captured 2026-10-11. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 1-2 setsUS$900,000 / set
  • ≥3 setsUS$890,000 / set

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Send the bay and vessel/rigging layout with stage-by-stage hook loads, movements and critical stops. Include the proposed operator location, runway/support interfaces, hook levels, duty, heat exposure, power and requested site services.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

Can 240/80 t be treated as a combined 320 t rating?

No. The archived listing provides separate main and auxiliary enquiry references. The selected technical documents must define each rating, allowed load combinations and coordinated movements; the pair does not authorize simultaneous maximum loading.

What should the casting sequence show?

Show pickup, transfer, holding, pouring and set-down positions with the vessel and rigging geometry, contents and load supported by each hook. Mark critical stops, clearances, restricted areas and the proposed control location.

Does the brake photograph prove the selected safety arrangement?

No. It shows a drum-brake component in the corresponding archive. Ask the technical offer to define selected brakes, stopping and holding functions, monitoring, inspection access and applicable acceptance criteria for the intended service.

Are archived span, lift and electrical values final specifications?

No. The 10.5–31.5 m span and discrete 6, 10, 20, 32 and 55 m lift alternatives are supplier family references. Confirm actual useful hook movement and site power in the selected design. Crane/mechanism classifications need the applicable standard, while component ingress or insulation labels do not establish whole-crane thermal suitability.

Is US$890,000–900,000 the current installed quotation?

The supplier listing captured 2026-10-11 shows US$900,000 per set for 1–2 sets and US$890,000 for at least 3 sets. These are historical quantity tiers, not a current delivered quotation. Request itemized prices for the selected equipment, site interfaces, transport, erection and acceptance services.

240 t main / 80 t auxiliaryOverhead cranes
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…