Aerospace / Workshop lifting cooperation
Heat-Treatment Workshop Crane and Long-Term Aerospace Supply
Henan Mine Crane Group’s long-term aerospace cooperation began with a 32t crane used in a heat-treatment workshop and subsequently covered more than 62 assorted crane units. Representatives of CASC’s Fourth Academy and Xi’an Tianfeng visited to review manufacturing and discuss further strategic cooperation.

- Initial application
- 32t crane for a heat-treatment workshop
- Cumulative cooperation
- More than 62 assorted crane units/sets
- Visiting customer
- Xi’an Aerospace Power Machinery, CASC Fourth Academy
- Partner
- Xi’an Tianfeng Construction and Installation
- Event focus
- Manufacturing processes, quality management and future cooperation
A specific workshop starting point
The 32t heat-treatment-workshop crane provides a concrete starting point for this cooperation. Heat-treatment handling needs to be specified around the actual workpiece, its support points and the movement between process positions. The crane’s rating is one input; temperature exposure and the lifting interface also matter to a new purchase.
Prepare a process route showing pickup and set-down positions and any restrictions around furnaces or fixtures. State the component temperature and exposure expected at the crane rather than assuming that all heat-treatment workshops impose the same conditions.
A growing supply relationship with different duties
The later total of more than 62 units covers assorted crane types supplied through the cooperation. It is a cumulative relationship figure, not a statement that every crane was rated 32t or worked in heat treatment. A factory package can contain several distinct lifting tasks.
For procurement, organise the requirement by workshop and station. Include the maximum load and operating cycle for each task, then identify common interfaces. This makes it possible to consider standardisation where suitable while retaining the design differences needed by the process.
Manufacturing and quality review during the customer visit
The visit took place on 5–6 December. He Nan and Wang Yongtao of Xi’an Aerospace Power Machinery and Hu Ming of Xi’an Tianfeng attended, with Henan Mine Crane Group deputy general manager Han Qingxiang among the hosts. The discussion covered crane manufacturing processes and the quality-management system.
The visitors reviewed the production environment, equipment, processes and product-quality controls. A buyer can use this type of visit to agree how manufacturing records, inspection points and drawing changes will be managed. Tie the review to deliverables for the intended equipment rather than leaving quality expectations as general statements.
Connect the lifting duty to the handover plan
Chang’e 5’s launch, lunar landing and ascent were background to the aerospace cooperation. Henan Mine Crane Group’s contribution concerns factory lifting and the associated supply relationship. The visit itself does not announce a newly delivered batch.
For a new heat-treatment or aerospace workshop project, agree the handling sequence and environmental requirements before selecting equipment. Define the installation responsibilities, factory checks, site demonstrations and maintenance access. Bring component and fixture teams into the review so the finished crane can be accepted against the actual production operation.
Application photographs
See the equipment and working context.
Photographs and accompanying illustrations from this application report. Open an image for a larger view.












Application reference: Henan Mine Crane Group official application report. Equipment and operating advice for a new project should be specified against your load, process and site.
Start the equipment discussion
Relevant equipment families.
Compare the equipment family with your operating duty. Final attachments, controls and protection follow the application requirements.
Double-girder overhead cranes
Evaluate for the defined heat-treatment or aerospace workshop duty, including environmental exposure.
View equipment options ↗Single-girder overhead cranes
Compare for appropriate supporting station duties after loads and process conditions are established.
View equipment options ↗Plan a similar application
Build the specification
around your operation.
Share the workshop process and station duties to develop an equipment schedule for your aerospace facility.
- Workpiece families, masses, dimensions and approved lifting/support points
- Heat-treatment temperatures, radiant exposure and attachment restrictions
- Station layout, furnace or fixture access and required hook approaches
- Equipment duties by workshop, operating cycles and package quantities
- Drawing approvals, manufacturing inspections and quality-record expectations
- Installation access, site demonstrations, maintenance and handover scope
Before you specify
Questions for
your project.
Should the heat-treatment process be included in the enquiry?
Yes. State where the crane works relative to the process, the load temperature and the duration of exposure. Include handling restrictions and the approved attachment interface.
Can one equipment schedule cover several workshops?
Yes, provided each duty remains clearly defined. List loads, cycles and environment by station, and identify any interfaces or functions intended to be shared.
What should we review during a supplier visit?
Review the manufacturing and quality activities relevant to your proposed equipment. Agree inspection points, records and approval responsibilities before manufacture proceeds.
Continue exploring















