Aerospace components / Delivery programme
Large-Span Crane Delivery for Aerospace Composite Production
Henan Mine Crane Group manufactured more than 20 large-span, high-precision new-type crane units for Xi’an Aerospace Composites Research Institute of CASC’s Fourth Academy. Twelve units had been delivered at the stage described, providing lifting equipment for aerospace supporting-material production.

- Customer
- Xi’an Aerospace Composites Research Institute, CASC Fourth Academy
- Package
- More than 20 crane units/sets
- Delivered subset
- 12 cranes at the stated milestone
- Design focus
- Large span and high-precision production handling
- Application
- Manufacture of aerospace supporting materials, including composite casings
Lifting capacity organised around material production
The customer produces materials and components that support aerospace manufacturing, including composite casings for solid rocket motors. Henan Mine Crane Group’s cranes perform lifting during the manufacture of such products. This is a factory-handling role linked to the production of flight hardware.
A crane package for this type of site should follow the production route. Identify which bays make or inspect components, where loads change fixtures and which transfers require controlled orientation. A package count alone does not define the capacity or attachment needed at each station.
More than 20 units with 12 delivered at the milestone
The announced supply comprises more than 20 crane units, with 12 already delivered. This distinction is useful when planning phased access to a production facility. It separates the overall manufacturing commitment from the portion that had reached the customer at that time.
For a new project, prepare an equipment schedule with the required availability of each bay. Link design approval, factory completion, delivery and installation to the production programme. Identify the interfaces that must be ready before a crane can be installed or accepted.
Large span and controlled handling start with geometry
Large span and high precision are the configuration priorities identified for this package. The workpiece envelope, lifting points and receiving fixtures determine what those priorities mean for a particular production line. Define the required hook approach and the intended position of the load at each handover.
Choose acceptance criteria that can be measured with the relevant part or test fixture. If positioning, rotation or multi-point support is necessary, describe the actual requirement in the enquiry. The crane rating and detailed control architecture are to be established through that specification rather than assumed from the aerospace setting.
Keep production support distinct from flight operations
The announcement was associated with Shenzhou 17’s launch at 11:14 on 26 October from Jiuquan. CASC’s Fourth Academy’s mission work included the escape-rescue system’s propulsion equipment and the spacecraft’s structural sealing systems. Broader programme context included crewed spaceflight, lunar exploration, BeiDou navigation and Mars exploration.
The crane contribution is production lifting for supporting components. For procurement, focus the discussion on the actual workshop operation and its quality requirements. Define installation access, component-protection rules and handover records so the lifting equipment integrates with the manufacturing process.
Application photographs
See the equipment and working context.
Photographs and accompanying illustrations from this application report. Open an image for a larger view.






Application reference: Henan Mine Crane Group official application report. Equipment and operating advice for a new project should be specified against your load, process and site.
Start the equipment discussion
Relevant equipment families.
Compare the equipment family with your operating duty. Final attachments, controls and protection follow the application requirements.
Double-girder overhead cranes
Evaluate large-span arrangements against each production bay and component route.
View equipment options ↗Single-girder overhead cranes
Compare suitable lighter support duties separately from the main large-span lifting requirement.
View equipment options ↗Plan a similar application
Build the specification
around your operation.
Send your aerospace-material production route and phased bay-availability schedule.
- Part families, maximum dimensions, masses and approved lifting points
- Manufacturing and inspection stations with required handover orientations
- Bay spans, runway elevations, hook approaches and fixture restrictions
- Equipment quantities by station and phased installation dates
- Positioning criteria, load support and required operating modes
- Factory inspection, delivery records, site tests and responsibility boundaries
Before you specify
Questions for
your project.
How should a multi-bay crane package be organised?
Create one duty schedule for each bay and show shared production interfaces. This allows quantities, ratings and installation stages to match the actual manufacturing programme.
What does the delivery milestone cover?
Twelve cranes had been delivered within the wider package of more than 20. Keep the delivery status of each unit visible in your own procurement schedule.
How do we translate high precision into a specification?
Define the required final load position, fixture clearances and permitted movement. Agree measurement conditions and demonstrations for the proposed equipment.