Underground railway / Site lifting application
Two 100t Metro Muck-Handling Gantry Cranes for the Guangfo Ring Railway
Spoil and construction materials must move between underground works and surface handling positions on the Guangfo Ring intercity railway. Henan Mine Crane Group supplied two 100t double-main-girder gantry cranes for this duty, working with China Railway First Group on the project.

- Project
- Guangfo Ring intercity railway, Foshan West to Guangzhou North section
- Construction partner
- China Railway First Group
- Equipment
- Two 100 t double-main-girder metro muck-handling gantry cranes
- Handled loads
- Excavation spoil and construction materials
- Below-rail depth
- Attachment lifting depth reaches 40 m below rail level
- Protection scope
- Safety provisions on crane travel, hoisting and other key movements
Surface-to-underground handling on the Guangfo Ring
The application is on the Foshan West–Guangzhou North section of the Guangfo Ring, part of the Pearl River Delta intercity railway network. The two gantries were built for lifting spoil and materials during underground railway construction. This combines a downward working route with surface pickup or discharge positions.
For a similar enquiry, show the shaft or opening, the load route and the surface receiving arrangement. The crane layout must be evaluated with the material container or attachment and the positions where loads enter and leave the working area. That is a different task from a gantry handling loads only above ground.
40 m describes the depth below the rail
The attachment can work to a stated depth of 40 m below rail level. That dimension belongs to the below-rail handling path. It should be kept separate from the crane's above-rail clearances and the space needed to bring a loaded attachment into its surface discharge position.
A purchasing drawing should show both ends of the route: the lowest handling level and the highest surface transfer requirement. Include the attachment dimensions and any load that projects beyond it. These details are needed to define the complete hook or attachment travel and the clearance envelope.
Project-specific structure and protected movements
The double-main-girder gantries were developed for the project's requirements and operating conditions. Computer-aided design and analysis were used for the gantry structure. Travel and hoisting, among the key movements, include safety protection provisions.
For new equipment, identify the movements that cross the shaft opening, pass personnel areas or approach discharge equipment. Define the operating restrictions and interfaces that apply at each position. The acceptance plan can then test the selected movements and protective functions against the actual construction sequence.
Build the duty around material, container and cycle
Spoil handling requires more than specifying a maximum load. State whether material is carried in a container, bucket or another engineered attachment, and provide its tare mass and loaded geometry. Construction-material lifts may require a different interface or operating procedure within the same working area.
Supply the expected lift frequency, discharge sequence and site access restrictions. Include exposure to water, dirt and weather, plus maintenance access at the surface and around the lifting mechanism. These requirements allow the two-way route and the selected protection functions to be reviewed as one handling system.
Application photographs
See the equipment and working context.
Photographs and accompanying illustrations from this application report. Open an image for a larger view.
Application reference: Henan Mine Crane Group official application report. Equipment and operating advice for a new project should be specified against your load, process and site.
Start the equipment discussion
Relevant equipment families.
Compare the equipment family with your operating duty. Final attachments, controls and protection follow the application requirements.
Double girder gantry cranes
Evaluate a dedicated below-rail handling configuration against shaft depth, load and surface coverage requirements.
View equipment options ↗Lifting attachments
Match the container or load-handling interface to the spoil/material duty and include its mass and envelope in crane selection.
View equipment options ↗Plan a similar application
Build the specification
around your operation.
Send shaft sections and the spoil/material handling cycle to define the below-rail route and surface transfer arrangement.
- Maximum gross load including container/attachment tare mass
- Shaft/opening dimensions and lowest working level below rail
- Surface discharge positions and required above-rail clearances
- Container or attachment drawings and permitted lifting interfaces
- Lift frequency, discharge sequence and travel/hoist interlocks
- Water/dirt/weather exposure, access restrictions and maintenance provisions
Before you specify
Questions for
your project.
Which dimensions define a shaft-handling enquiry?
Show the below-rail working depth, opening dimensions, attachment envelope and surface transfer height. The 40 m depth in this application is measured below rail, separately from above-rail clearance.
Can one arrangement handle spoil and construction materials?
The load interfaces and procedures must be defined for both duties. Provide container/attachment drawings and the material-load cases so the crane and protection scope can be reviewed.
How should the operating cycle be specified?
Include pickup, raising, travel, discharge and return, with the required frequency and site restrictions. This provides the basis for duty selection and acceptance movements.