Steel box-girder bridge / Completed construction support
72m-Span Crane for Steel Box-Girder Handling at Jianzhou Bridge
Henan Mine Crane Group's 72m-span crane supported Jianzhou Bridge construction in Jianyang, crossing the Tuo River and spanning the Konggang Avenue work area. The project used welded variable-section continuous steel box girders, with the bridge completed and opened to traffic at the reported stage.

- Project
- Jianzhou Bridge, Jianyang
- Crane dimension
- 72 m crane span
- Structural duty
- Welded variable-section continuous steel box-girder handling
- Location context
- Tuo River crossing and Konggang Avenue working area
- Bridge dimension
- 580.5 m total bridge length; separate from crane span
- Reported stage
- Crane support to the bridge's completed construction and opening
Coverage over a constrained bridge working area
The 72 m span is the defining crane dimension in this application. Jianzhou Bridge forms part of Jianyang Avenue and crosses the Tuo River, with the crane spanning the Konggang Avenue area. The lifting arrangement was selected after technical discussion and assessment of the project's requirements.
For another bridge site, provide the local lifting-area plan rather than the overall bridge alignment alone. Show the supports, receiving positions and assembly locations that the crane must cover. That identifies the span requirement and the interfaces that the supporting structure must accommodate.
Handle the changing geometry of steel box girders
Jianzhou Bridge uses an all-welded, variable-section continuous steel box-girder structure. The lifting task therefore needs to be defined from the individual fabricated sections, their approved lifting points and the places where they enter the assembly sequence.
A buyer should identify section mass, centre of gravity and any differences in geometry across the lift schedule. Include fixtures and the permitted load orientation. Those details determine the required load interface and movement envelope; a large span alone does not establish capacity or control requirements.
Separate crane span from the bridge's overall length
The completed bridge is 580.5 m long. That is a bridge dimension, while 72 m is the crane span. Keeping the two separate is essential when preparing an enquiry: neither the overall bridge length nor its road function defines the crane's hook height or rated lifting load.
Use site sections to show the rail or support level, pickup level and final placement level. Combine them with the girder drawings to establish the necessary hook path and clearance. Supply requirements for loaded movements and access around the assembly positions.
Specify the lifting sequence and site interfaces
The project used a purpose-built crane arrangement for demanding structural lifting. For a comparable application, the technical review should connect the crane layout to the girder delivery plan, temporary supports and assembly sequence. Define any access restrictions caused by roads, waterways or adjacent construction.
Agree the representative lifts and the verification required for the proposed equipment and supports. Include erection and maintenance access as well as the construction load cases. This produces an equipment scope that follows the local steel-girder operation rather than copying dimensions from a different bridge.
Application photographs
See the equipment and working context.
Photographs and accompanying illustrations from this application report. Open an image for a larger view.
Application reference: Henan Mine Crane Group official application report. Equipment and operating advice for a new project should be specified against your load, process and site.
Start the equipment discussion
Relevant equipment families.
Compare the equipment family with your operating duty. Final attachments, controls and protection follow the application requirements.
Double girder gantry cranes
Evaluate a site-specific large-span arrangement where the bridge working area and supports permit a gantry; exact model and capacity require the lift plan.
View equipment options ↗Lifting attachments
Review steel box-girder fixtures using approved lifting points and section geometry.
View equipment options ↗Plan a similar application
Build the specification
around your operation.
Send the steel box-girder schedule and local lifting-area plan to evaluate span, load and construction access.
- Girder-section masses, dimensions and centres of gravity
- Approved lifting points, fixtures and permitted orientation
- Local support/rail layout and required crane span
- Pickup/placement levels and required hook clearance
- Delivery sequence, temporary supports and road/waterway restrictions
- Representative lift checks, support verification and erection/maintenance access
Before you specify
Questions for
your project.
Which drawings are needed to establish a large crane span?
Provide the local support layout, receiving and assembly positions, and the load route. Span should follow that working area, separately from the bridge's total length.
How are variable-section girders included in selection?
Schedule each section's mass, geometry, centre of gravity and lifting interface. Review the changes across the assembly sequence rather than using a single typical section alone.
What site restrictions should be supplied early?
Show roads, waterways, temporary supports, adjacent works and erection access. These interfaces affect the practical crane layout and movement sequence.