Overhead cranes / Engineering selection

European Double Girder Overhead Crane

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Equipment reference1601932247289Configured for your project
Technical offer defines final specification
PRODUCT CONFIGURATIONYellow double-girder overhead crane above trucks in a bright industrial hall.

Yellow double-girder overhead crane above trucks in a bright industrial hall

Selection at a glance
5, 10, 16, 20, 25, 32, 40 and 50 ton

Listed rated capacity

Load and suspended assembly
Describe the goods, lifting attachment and complete suspended mass in T. Give their dimensions and required orientation at pickup and landing. Include handling frequency and relevant placement needs so the supplier can choose the hoist, trolley and crane duty against the actual work.
Building section and rail reference
Provide an identified building section with the runway rail reference, roof, trusses, services and other fixed obstructions. State the available upper space and detailed elevations in mm. Ask the supplier to review the selected crane and trolley envelope against these measured conditions.
Highest and lowest hook positions
Identify the hook positions required to connect, lift and place the suspended assembly, using a clear site datum. Give useful hook travel in m and detailed working levels in mm. Include the attachment depth and load envelope that affect the required upper hook position.
Pickup and landing coverage
Mark all required pickup and landing points on the building plan, including load orientations and surrounding obstacles. State runway rail-centre span in m and detailed position dimensions in mm. Ask for the proposed usable hook area against those points.
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

European Double Girder Overhead Crane listed specifications
Load and suspended assemblyDescribe the goods, lifting attachment and complete suspended mass in T. Give their dimensions and required orientation at pickup and landing. Include handling frequency and relevant placement needs so the supplier can choose the hoist, trolley and crane duty against the actual work.
Building section and rail referenceProvide an identified building section with the runway rail reference, roof, trusses, services and other fixed obstructions. State the available upper space and detailed elevations in mm. Ask the supplier to review the selected crane and trolley envelope against these measured conditions.
Highest and lowest hook positionsIdentify the hook positions required to connect, lift and place the suspended assembly, using a clear site datum. Give useful hook travel in m and detailed working levels in mm. Include the attachment depth and load envelope that affect the required upper hook position.
Pickup and landing coverageMark all required pickup and landing points on the building plan, including load orientations and surrounding obstacles. State runway rail-centre span in m and detailed position dimensions in mm. Ask for the proposed usable hook area against those points.
End and side approach requirementsIdentify work points close to walls, runway ends, columns or other equipment. Request the selected end and side hook-approach dimensions with the crane and trolley positions shown. Review the goods and attachment envelope as well as the hook location at each limiting position.
Hoist and travel selectionDescribe the useful lifting and travel work, placement requirements and operating pattern. Ask for proposed lifting, trolley and bridge speeds and the selected command arrangement. Have the supplier explain how the chosen package affects the outline and useful working range.
Outline review and building interfacesObtain one selected general arrangement with rail references, crane/trolley envelopes, hook levels and approach dimensions. Identify the load information required by the responsible runway and building designer. Resolve any required layout or equipment change with the relevant parties before confirming the order.
Rated loadComplete suspended load including rigging and attachments; confirm each hook and combined load case.
Span and travelRunway rail-centre span, bridge travel, trolley travel and end approaches.
Useful lifting heightRequired upper and lower hook positions with the load and rigging.
Duty and motion speedsLoad spectrum, lifts per hour, shifts, starting frequency and selected lift/travel speeds.
Runway and powerSupport capacity, wheel reactions, rail geometry, voltage, frequency, phase and power-feed arrangement.

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Runway and structural support

Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.

Hook coverage and useful height

Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.

Duty, power and environment

State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Crane equipmentSelected bridge, hoist or trolley, travel drives, controls and specified safety functions.
Runway and power feedRails, supporting steelwork, power-feed system and the allocation of building interfaces.
Delivery and installationNamed delivery term, unloading, installation work, local labour and access equipment.
Acceptance and handoverInspection and test plan, records, documentation, training, spare parts and warranty terms.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

European Double Girder Overhead Crane. Available rated-load options: 5T hook-load and arrangement request or 10T hook-load and arrangement request or 16T hook-load and arrangement request or 20T hook-load and arrangement request or 25T hook-load and arrangement request or 32T hook-load and arrangement request or 40T hook-load and arrangement request or 50T hook-load and arrangement request. An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. Also specified as a double girder bridge crane, this equipment can be configured for the work area and lifting task. A selected bridge, hoist and runway arrangement can serve pickup and set-down points across the workshop while keeping the floor route available for production. Common applications include machine shops and fabrication bays and equipment assembly and maintenance. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.

Equipment
European Double Girder Overhead Crane
Capacity / selection
5T hook-load and arrangement request or 10T hook-load and arrangement request or 16T hook-load and arrangement request or 20T hook-load and arrangement request or 25T hook-load and arrangement request or 32T hook-load and arrangement request or 40T hook-load and arrangement request or 50T hook-load and arrangement request
Application
machine shops and fabrication bays
Archived supplier-listing reference
US$6,800 / piece

Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.

START WITH THE LOAD

Choose the Right European Double Girder Overhead Crane

An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. A selected bridge, hoist and runway arrangement can serve pickup and set-down points across the workshop while keeping the floor route available for production. Typical applications include machine shops and fabrication bays, equipment assembly and maintenance, steel and material handling. Compare the proposed configuration with the actual load, reach, duty and site dimensions.

Capacity and lifting duty

Include the load, slings, lifting beams and attachments. State the load spectrum, lifts per hour, shifts and required lifting and travel speeds.

Span, hook height and coverage

Provide runway rail centres, upper and lower hook positions, side and end approaches, workpoints and roof or service obstructions.

Runway, power and supply scope

Share support drawings and site voltage, frequency and phase. Itemize the crane, rails, moving power feed, installation, testing and commissioning.

Saved supplier listing captured 2026-10-13; quantity tiers: 最低起订量: 1 piece: US$6,800 per piece. The listing does not establish a current, project-specific or delivered price. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price.

SEE THE EQUIPMENT

European Double Girder Overhead Crane Features

Review these european double girder overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.

Yellow double-girder overhead crane above trucks in a bright industrial hall.01 / EUROPEAN DOUBLE GIRDER OVERHEAD CRANE · 01

Capacity and lifting duty

Yellow double-girder overhead crane above trucks in a bright industrial hall.

Red double-girder overhead cranes with hanging hook gear in a white-roof workshop.02 / EUROPEAN DOUBLE GIRDER OVERHEAD CRANE · 02

Span, hook height and coverage

Red double-girder overhead cranes with hanging hook gear in a white-roof workshop.

Two yellow double-girder bridges and cable loops beneath a steel roof.03 / EUROPEAN DOUBLE GIRDER OVERHEAD CRANE · 03

Runway, power and supply scope

Two yellow double-girder bridges and cable loops beneath a steel roof.

Choose Crane Controls for the Work Area

Specify pendant, radio remote or cabin control only where listed for this model. Confirm operator sight lines, motion speeds, emergency stops and any backup controller in the quoted scope.

COMPARE THE COMPLETE PROPOSAL

Define your supply package.

Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.

EQUIPMENT PACKAGE

Selected European Double Girder Overhead Crane

  • Rated load or task: 5, 10, 16, 20, 25, 32, 40 and 50 ton
SITE INTERFACES

Power, support & layout

  • Confirm support, power, clearances and purchaser-provided work in the offer.
  • Separate equipment price, delivery and site services for comparison.
DELIVERY & SERVICE

Order & installation scope

  • State transport, unloading and erection access.
  • List agreed testing, commissioning, manuals and operator handover.
  • Confirm maintenance access, wear parts and service support requested.

Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.

SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE

Specify Your European Double Girder Overhead Crane

Provide the layout and operating conditions to compare a european double girder overhead crane quotation against your actual project.

Discuss your site

Henan Mine Crane Group

European Double Girder Overhead Crane Supply Scope

Compare itemized quotations with the same equipment, delivery and site-service boundaries.

Crane equipment

Confirm 5, 10, 16, 20, 25, 32, 40 and 50 ton, selected mechanisms, control options and required accessories.

Site interfaces

List rail or support work, power supply, clearances and purchaser-provided services.

Delivery & installation

State transport, unloading, erection, testing, commissioning and service parts included in the offer.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Single saved supplier-listing priceUS$6,800per piece · MOQ 1 piece

The saved listing provides one price, not a range. Captured 2026-10-13. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 最低起订量: 1 pieceUS$6,800 / piece

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

What is a european double girder overhead crane?

An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder.

What information is needed to quote a european double girder overhead crane?

Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.

How much does a european double girder overhead crane cost?

US$6,800 per piece is the saved supplier-listing reference, captured 2026-10-13. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price. Request a current quotation for the selected configuration, quantity, delivery and services.

Which capacity should I choose for an overhead crane?

Size the crane from the heaviest complete suspended load, including lifting attachments, and provide the work cycle. The selected structure, hoist and duty must match the project requirements.

What affects an overhead crane quotation?

Capacity, span, lifting height, hoist, duty and controls affect equipment selection. Runway, electrical supply, transport, installation and commissioning depend on the agreed project scope.

5, 10, 16, 20, 25, 32, 40 and 50 tonOverhead cranes
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…