Overhead cranes / Engineering selection

European Double Girder Overhead Crane

Review a KSQ 20T main / 5T auxiliary enquiry around the lifting tasks, VFD-controlled motions, hook geometry and existing workshop runway.

Equipment reference1601734621405Configured for your project
Technical offer defines final specification
CRANE-SERIES REFERENCEYellow double-girder cranes above a workshop floor between blue steel columns

Yellow double-girder cranes above a workshop floor between blue steel columns. Series reference photograph; the ordered 20T main / 5T auxiliary arrangement must be defined in the technical offer.

Selection at a glance
20T main / 5T auxiliary

Main / auxiliary enquiry

Main hook requirement
20T main; include rigging and attachments in the load brief
Auxiliary hook requirement
5T auxiliary; define the task and permitted operating conditions
Lifting arrangement
Project-selected main/auxiliary mechanisms and lifting trolley
Working envelope
Span, highest/lowest positions, hook spacing and end approaches
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

European Double Girder Overhead Crane listed specifications
Main hook requirement20T main; include rigging and attachments in the load brief
Auxiliary hook requirement5T auxiliary; define the task and permitted operating conditions
Lifting arrangementProject-selected main/auxiliary mechanisms and lifting trolley
Working envelopeSpan, highest/lowest positions, hook spacing and end approaches
HeadroomSelected bridge, lifting trolley and hook-block dimensions
Duty assessmentLoad spectrum, lifting frequency, shifts and travel distances
Motion controlVFD-controlled axes, speed ranges, braking and operator station
Site interfacesWheel reactions, rail geometry, clearances and power feed
Order scopeCrane, delivery, erection, testing and commissioning

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Runway and structural support

Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.

Hook coverage and useful height

Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.

Duty, power and environment

State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Crane equipmentSelected bridge, hoist or trolley, travel drives, controls and specified safety functions.
Runway and power feedRails, supporting steelwork, power-feed system and the allocation of building interfaces.
Delivery and installationNamed delivery term, unloading, installation work, local labour and access equipment.
Acceptance and handoverInspection and test plan, records, documentation, training, spare parts and warranty terms.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Check whether each hook can reach the workpoints with the required load and rigging. Define the positioning task, daily cycle and control station before comparing variable-speed arrangements.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Equipment and application overview

This KSQ enquiry concerns a 20T main-hook duty and a 5T auxiliary-hook duty with variable-speed requirements. Describe the load and handling task for each hook, then compare the selected trolley arrangement, VFD-controlled motions, hook envelope and runway reactions. The two hook ratings do not establish a 25T combined lifting capacity.

Enquiry configuration
KSQ European double-girder overhead crane with main and auxiliary lifting tasks
Hook requirements
20T main / 5T auxiliary; the technical offer must define the selected arrangement and permitted operating conditions
Motion-control brief
Identify each motion requiring VFD control, the speed range, positioning task and operator station

Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.

DEFINE THE MOTIONS

Match variable-speed control to the handling task

Describe how the main and auxiliary hooks will be used, including load dimensions and attachment masses. State whether the task needs individual hook operation or a combined condition requiring engineering review; do not add the two headline ratings.

Controlled axes and speeds

Ask the technical offer to identify the VFD-controlled motions and their speed ranges, braking and stop functions. A variable-speed title does not specify every drive or a fixed number of speed steps.

Hook geometry and access

Show pickup and set-down positions, both hook levels, separation and approaches. Check the selected trolley and bridge dimensions against roof obstructions, load envelopes and service access.

Duty and runway reactions

Provide the separate hook load spectra, lifts per hour, travel distances and shifts. Obtain the selected wheel reactions and review the existing rail and support interfaces.

SEE THE EQUIPMENT

Overhead Crane Series Reference Photographs

These workshop photographs show different bridge arrangements. The second image is marked 50t and the third includes a 5t sign. They are series references, not proof of the requested 20T / 5T configuration.

Yellow double-girder cranes above a workshop floor between blue steel columns01 / WORKSHOP BRIDGE REFERENCE

Capacity and lifting duty

Yellow double-girder cranes above a workshop floor between blue steel columns. Series reference photograph; the ordered 20T main / 5T auxiliary arrangement must be defined in the technical offer. Include all rigging and attachments, lifting points and the daily operating cycle. Include the load, slings, lifting beams and attachments. State the load spectrum, lifts per hour, shifts and required lifting and travel speeds.

Yellow double-girder crane marked 50t beneath a white steel roof02 / BRIDGE MARKED 50t

Span, hook height and coverage

Yellow double-girder crane marked 50t beneath a white steel roof. Series reference photograph; it does not establish the requested 20T main / 5T auxiliary configuration. Mark the pickup and landing positions, travel route and required hook envelope on a site plan. Provide runway rail centres, upper and lower hook positions, side and end approaches, workpoints and roof or service obstructions.

Yellow overhead bridge with a visible 5t sign above a locomotive workshop03 / LOCOMOTIVE WORKSHOP REFERENCE

Runway, power and supply scope

Yellow overhead bridge with a visible 5t sign above a locomotive workshop. This view does not establish a 20T main hook or the permitted main and auxiliary operating conditions. Confirm supports, power, controls, service access and delivery and installation responsibilities. Share support drawings and site voltage, frequency and phase. Itemize the crane, rails, moving power feed, installation, testing and commissioning.

Choose Crane Controls for the Work Area

Specify pendant, radio remote or cabin control only where listed for this model. Confirm operator sight lines, motion speeds, emergency stops and any backup controller in the quoted scope.

COMPARE THE SELECTED PACKAGE

Identify the mechanisms and controls in each offer

Itemize the main and auxiliary lifting arrangements, trolley, VFD-controlled axes, operator controls and specified safety functions. Use the Supply scope tab to agree rails, power feed, transport, erection, commissioning and testing before comparing totals.

SHOW THE WORKING ENVELOPE

Check both hooks against the workshop layout

Mark runway rail centres and length, the required hook positions, load and rigging dimensions, obstructions and maintenance access. Include support drawings and the available power supply.

Discuss your workshop

AGREE ACCEPTANCE

Make the handover scope specific

Agree the selected configuration, allowed hook operating conditions, motion-control checks, inspection and test plan, documents and operator handover. The quotation should allocate supplier and purchaser responsibilities for the site interfaces.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Archived supplier-listing price rangeUS$30,000–31,000per set · MOQ 1 set

Range combines the price tiers shown in the saved listing. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 1-4 setsUS$31,000 / set
  • ≥5 setsUS$30,000 / set

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Mark runway rail centres and travel length, both hook positions and useful working levels, hook spacing, load and rigging envelopes and obstructions. Include structural support drawings and site power.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

What does 20T / 5T mean for this KSQ enquiry?

It identifies a 20T main-hook requirement and a 5T auxiliary-hook requirement. The selected technical offer must define the actual mechanisms, allowed operating conditions and attachment-load basis. The two figures are not a 25T combined capacity.

Does variable-speed control apply to every crane motion?

The saved enquiry identifies frequency control, but the offer must specify the controlled axes, speed ranges, braking and stop functions. Do not assume that every motion uses the same drive arrangement or that a fixed number of speed steps applies to the selected crane.

How should a KSQ 20T / 5T quotation be compared?

The saved supplier listing shows US$30,000–31,000 per set, captured 2026-10-12. This is historical context, not a current or delivered quotation. Compare the main and auxiliary mechanisms, trolley, duty, controls and documents, then separate runway, power feed, transport, installation and testing.

Which dimensions are needed for the hook arrangement?

Provide runway rail centres and travel length, upper and lower hook positions, hook separation and approaches, pickup and landing points, load dimensions and rigging height. Include roof obstructions, service access and the available structural drawings.

Can the main and auxiliary hooks operate together?

Only use a combined operating condition that is explicitly permitted by the selected crane documentation. Describe the intended loads and task for engineering review; the 20T / 5T title alone does not establish simultaneous operation or a combined rating.

20T main / 5T auxiliaryOverhead cranes
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…