Load route and hoist envelope
Provide the complete suspended load, attachment dimensions, pickup/set-down points and required hook levels. Ask for the selected trolley rail geometry, wheelbase, approaches and maintenance space.
Review a 20 ton hoist-type double-girder crane around the selected hoist and trolley envelope, hook coverage, operating duty and runway interfaces.

Workshop bridges visibly marked 20/5t. Family reference photograph; the main and auxiliary markings do not define the requested 20 ton hoist arrangement or permit their ratings to be added.
Enquiry load; selected configuration to be agreed
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Load requirement | 20 t enquiry; include lifted item, rigging and attachments in the suspended load |
|---|---|
| Lifting package | Selected electric hoist and trolley identified by rating, drawing and duty |
| Bridge arrangement | Double girder; span, trolley rails and end carriages defined in selected drawing |
| Hook envelope | Upper/lower workpoints, rigging allowance and side/end approaches supplied |
| Duty basis | Load spectrum, lifts per hour, starts and shifts; structure and mechanisms assessed separately |
| Motion schedule | Hoist, trolley and bridge speeds, drive methods, braking and limits stated separately |
| Operator controls | Selected pendant, radio or cabin arrangement and sight lines agreed |
| Building interfaces | Selected wheel reactions, runway rails, clearances and electrical feed reviewed |
| Order and handover | Equipment, site work, checks, documents and responsibilities itemized |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide the complete suspended load, attachment dimensions, pickup/set-down points and required hook levels. Ask for the selected trolley rail geometry, wheelbase, approaches and maintenance space.
State load spectrum, lifts per hour, starts, shifts and travel distances. Agree the selected structure and mechanism classes, each motion speed and drive method, operator station, braking and limits.
Supply rail-centre span, rail-top levels, rail/support drawings, obstructions and site voltage, phases and frequency. Review selected wheel reactions and agree moving feed, isolation, connection and erection access.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected hoist, trolley, bridge, end carriages, drives, controls and safety functions identified. |
| Runway and electrical feed | Rail/support work, fixings, moving feed, isolation and connection responsibilities allocated. |
| Delivery and site work | Delivery term, unloading, erection, local services, electrical work and commissioning itemized. |
| Acceptance and handover | Agreed checks, drawings, test records, manuals, operator handover, spares and warranty terms listed. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Trace the load and rigging through the pickup, travel and set-down positions. Check the selected hoist and trolley geometry against the bridge, runway and building clearances.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
A 20 ton hoist-type double-girder crane proposal needs a selected hoist and trolley drawing as well as a bridge span. Compare the hook envelope, trolley rail arrangement, duty and motion controls with the building clearances and runway reactions. Use one layout and equipment schedule to define what the quotation covers.
Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.
START WITH THE HOIST
Request the selected hoist and trolley arrangement with its dimensions and rail requirements. A 20 ton headline does not fix the hook approaches, wheelbase, operating speeds or building reactions.
State the heaviest complete suspended load, attachment masses, load spectrum, lifts per hour and working shifts. Ask for the proposed crane structure and mechanism classes separately, linked to that cycle.
Mark pickup and set-down points, upper and lower hook positions and rigging allowance. Compare the selected trolley rails, wheelbase, side and end approaches and maintenance space with the bridge and roof layout.
List hoisting, trolley and bridge travel separately, with required speeds, drive methods, braking, limits and operator controls. Identify which motions use VFD control and agree the site voltage, phases and frequency.
READ THE PHOTOGRAPHS
The first view is marked 20/5t, the second 20t and the red bridges show different duty markings. These views explain visible arrangements; the selected hoist package needs its own schedule and drawing.
01 / FAMILY REFERENCEWorkshop bridges visibly marked 20/5t. Family reference photograph; the main and auxiliary markings do not define the requested 20 ton hoist arrangement or permit their ratings to be added.
02 / FAMILY REFERENCEYellow bridge marked 20t above trucks in an industrial hall. Family reference photograph; verify the selected hoist, trolley envelope, hook positions and site interfaces on the project drawing.
03 / FAMILY REFERENCERed workshop bridges with visible A5 and A6 markings. Family reference photograph; markings on different bridges do not establish the duty class or lifting arrangement of the selected 20 ton crane.
CONNECT THE CRANE TO THE BUILDING
Provide rail-centre span, rail-top levels, existing rail and support details, travel length and obstructions. Request the selected crane wheel reactions and end-carriage dimensions for the structural review. Agree rail fixings, moving power feed, isolation and connection responsibilities; the Supply scope tab provides the allocation checklist.
SHOW THE WORKPOINTS
Show the load and lifting accessories at pickup and set-down, required upper and lower hook positions, side and end approaches, roof services and installation access. Building height alone does not define hook travel or usable headroom.
Discuss your hoist and workshop layoutAGREE THE ORDER BASIS
The offer should identify the selected hoist, trolley, bridge, drives, controls and agreed safety functions, together with drawings, manuals and inspection records. Allocate transport, erection, connection, commissioning and acceptance checks. Component brands, warranty terms and any required compliance documents belong to the selected order.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark rail centres and levels, upper/lower hook positions, rigging allowance, load route and obstructions. Include the selected hoist/trolley envelope, support drawings, power feed and erection access.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
The selected hoist and trolley arrangement, bridge span and rails, duty, motion speeds and controls, together with wheel reactions and hook approaches. The same offer should allocate runway work, electrical feed, delivery, installation and handover responsibilities.
It shows main and auxiliary markings on a family reference bridge. It does not establish the lifting arrangement ordered for this 20 ton enquiry. State whether an auxiliary hook is required and obtain the selected arrangement and permitted operating conditions; do not add the marked ratings.
Compare the selected trolley rails and wheelbase, bridge and hook-block dimensions, upper/lower hook positions, side/end approaches, roof obstructions and service access with the project layout. Ask for the selected wheel reactions for the runway review.
No. Identify hoisting, trolley travel and bridge travel separately, with the selected drive method, required speed range, braking, limits and operator controls. The equipment schedule should link each motion to the load and operating cycle.
The saved supplier listing captured 2026-10-12 shows US$15,000 per set for one or two sets and US$14,800 per set for at least three sets. These are historical listing tiers. Request a current itemized offer for the selected equipment, quantity, delivery and site work.