Working envelope
Supply pickup/placement positions, rigging dimensions, load geometry, roof/services section and selected hook limits.
Plan the 20 ton hoist-type bridge crane around rigging depth, useful hook positions, roof clearance and the selected runway reactions.

Yellow double-girder crane above red fabrication equipment. Product-family reference photograph; the visible workshop scene does not establish the selected 20 ton configuration or its dimensions.
Enquiry load; selected configuration to be agreed
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Enquiry and load basis | 20 t enquiry; include the lifted workpiece and below-hook slings, lifting beam and attachments in the suspended-load requirement. Do not deduct the integral hook block again; obtain crane/trolley self-weight separately for support design. |
|---|---|
| Lifting arrangement | Double-girder bridge with the selected electric wire-rope hoist trolley; verify the matched hoist, bridge and duty |
| Runway geometry | Archived span alternatives 10.5–31.5 m; selected rail centres, rail profile, runway length, levels and approaches to be agreed |
| Hook working envelope | Archived lift alternatives 6, 9, 12 or 18 m; define required upper/lower hook positions, reeving, rigging depth and obstruction clearance |
| Duty and motion schedule | Archived A4 selection within an intermittent A3–A4 family; confirm load spectrum, lifts/starts, shifts and selected lifting/trolley/bridge speeds |
| Runway design actions | Selected crane and trolley masses, wheel arrangement and reactions for relevant trolley positions, plus agreed horizontal and dynamic actions |
| Power and controls | Archived 380 V, 50 Hz, three-phase option; agree site supply, moving feed, isolation, controls and safety functions |
| Installation and acceptance | Allocate runway assessment, rail work, erection access, power connections, inspection/testing and handover in the offer |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Supply pickup/placement positions, rigging dimensions, load geometry, roof/services section and selected hook limits.
Provide rail centres/profile/levels, runway and support drawings, existing condition and end stops; request selected reactions for structural review.
State load spectrum, lifts and starts per hour, shifts, travel, speeds, voltage/frequency/phases, environment and erection/maintenance access.
| Work package | Agree in the quotation |
|---|---|
| Crane package | Selected double-girder bridge, hoist trolley, motion drives, controls and agreed safety functions identified. |
| Runway and power interfaces | Structural assessment, rail supply/alignment, stops, moving feed, isolation and site connections allocated. |
| Installation | Transport, unloading, lifting access, erection, alignment and commissioning responsibilities listed. |
| Acceptance and handover | Applicable inspection/testing, records, coordinated drawings, manuals, training, spares and warranty terms agreed. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Check whether the chosen hoist-type arrangement can reach the workpoints with the actual load and rigging. Review the operating cycle and selected support actions before agreeing the technical offer.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
A 20 ton hoist-type double-girder crane needs one coordinated envelope for the hoist trolley, hook, lifting attachments and load. Start with the pickup and set-down positions, then compare the selected headroom, hook approaches and runway reactions. Building height and nominal capacity alone do not establish that the crane will fit or that an existing runway can support it.
CHECK THE OPERATING ENVELOPE
Use a plan and section with a common datum. The crane must reach the required load positions throughout the route, including the approach to machines, storage positions and maintenance areas.
Record lifting-beam or spreader depth, sling geometry, lifting points and load height. A deeper below-hook arrangement can reduce the usable load position even when the hook travel is unchanged. Ask for the selected upper and lower hook positions and reeving arrangement.
Mark the required pickup and set-down points relative to the runway rails and end stops. Compare the selected hook approaches with these points; rail-centre span and bridge travel are not the same dimensions as the usable hook coverage.
Include rafters, lights, ducts, cables and adjacent equipment in the clearance section. Allow the access and removal route needed for the selected hoist, trolley and electrical equipment. Agree required clearances and tolerances in the project drawing rather than assuming a universal allowance.
READ THE REFERENCE PHOTOGRAPHS
These views come from this product listing’s own saved library. They illustrate equipment-family features and do not establish the selected 20 ton configuration, dimensions, duty or support loads.
01 / FAMILY REFERENCEYellow double-girder crane above red fabrication equipment. Product-family reference photograph; the visible workshop scene does not establish the selected 20 ton configuration or its dimensions.
02 / FAMILY REFERENCECrane visibly marked 400/100t, with a suspended hook and rigging. This product-family photograph is not the 20 ton crane configuration; do not use the pictured markings, load or proportions for this enquiry.
03 / FAMILY REFERENCEYellow overhead girders, suspension hardware and hook blocks viewed from below. Product-family reference photograph; selected reeving, hook count, approaches and headroom require the order drawing.
REVIEW THE RUNWAY ACTIONS
Ask for the wheel arrangement, wheelbase, crane and trolley masses, and wheel reactions for the relevant load and trolley positions. Identify which dynamic and horizontal actions are included and the design basis used. A nominal 20 ton lifted load is not a complete runway design load, and it should not be divided evenly among wheels as a substitute for the selected reactions.
The responsible structural engineer should review the runway beams, rails, connections, columns and other supporting elements using the applicable load combinations and site condition. An existing crane runway does not establish compatibility with a replacement crane of the same nominal capacity.
COORDINATE BEFORE COMPARING OFFERS
Provide the surveyed rail centres and levels, support drawings, working points, rigging details and operating cycle. Request a selected general arrangement, hook envelope and reaction schedule with matching revisions. Resolve any site modification and responsibility before installation planning.
Discuss your clearance and runway requirementsCOMPARE A DEFINED HOIST-TYPE PACKAGE
Identify the bridge, hoist trolley, drives, control arrangement, moving power feed and agreed safety functions. Use the Supply scope tab to allocate runway assessment, rails, erection, electrical work and acceptance. The archived LH-family description concerns intermittent service; sustained heavy production, special environments or unusual load cases require a separate suitability review. Confirm documentation, spare parts and warranty terms for the selected order.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark rail-top level, runway span, pickup/set-down positions, roof and service obstructions, rigging depth and load dimensions. Include support drawings and request the selected hook envelope and wheel-reaction schedule.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
The available hook positions depend on the rail-top datum and the selected bridge, trolley, hoist and reeving outline. Below the hook, lifting attachments and the load also need space. Compare the complete envelope with the required workpoints and obstructions.
No. It is a product-family reference photograph from the saved listing. Its visible rating and proportions do not establish the selected 20 ton equipment, lifting arrangement or support loads.
No. Request the selected wheel reactions and design actions. These depend on the crane/trolley masses, wheel arrangement, load position and design basis. The responsible structural engineer must review the runway and supports using the applicable load combinations.
20 t enquiry; include the lifted workpiece and below-hook slings, lifting beam and attachments in the suspended-load requirement. Do not deduct the integral hook block again; obtain crane/trolley self-weight separately for support design.
The listing captured 2026-10-12 shows US$7,000 per set for one to nine sets and US$6,000 per set for at least ten. These are historical listing tiers, not a current selected or installed quotation. Compare the bridge/hoist package, runway work, power, delivery and site services on the same scope.